Issue #4 covers every housing authority solicitation on COMMBUYS that is still open this week (pulled Fri Oct 16): 55 in all, 14 of them new since last week and marked New. I read each notice. For every job you get what it is, when it's due, and what could trip you up. Every item links to the official notice.

This week at a glance

Building jobs due this week (15, plus 2 design contracts)

Fire exit and main entry doors

Randolph Housing Authority
Due Tue Oct 20, 1 PMEst. $52,000Electronic bids only

Replace four steel fire doors, one entrance door with its framing and large sidelight, and one garage door: tear-out, prep, and new doors, frames and hardware. The notice doesn't give the building; Randolph's capital plan lists “Replace Fire Exit & Main Entry Doors” at McCauley Murray Lewis (667-03), $89,843 total cost, which is likely this job.

Watch: The site visit was Oct 13. Bids go in at biddocs.com.

Official notice →

Exterior door replacement

Rowley Housing Authority · listed as “FISH 254047”
Due Wed Oct 21, 10 AM

Exterior door replacement. The notice itself says only “Doors”; the attached spec is titled “Rowley 254047 Exterior Doors.” Rowley's fiscal 2027 plan lists two door projects, “Replace Exterior Doors” at Plantation ($140,585 total development cost) and “Exterior Door/Screen Door Replacement” ($216,876, no development named), so this is likely one of them.

Watch: The pre-bid was Oct 8. Run by Chelmsford HA staff (Sharon Smith).

Official notice →

Construction administration on a $1.2M project (for designers)

Groton Housing Authority · listed as “Designer”
Due Wed Oct 21, 2 PM

Groton HA wants a designer for construction administration on a project with a $1,225,000 construction cost. The notice doesn't name the project; the details are in the document attached to the notice.

Watch: For design firms, not contractors. Run by Chelmsford HA staff (Sharon Smith).

Official notice →

Heating electrification at Seibel Apartments (for designers)

Holyoke Housing Authority
Due Wed Oct 21, 2 PM

Design and construction administration for converting heating and hot water systems, and upgrading building electrical service, at five buildings of the Edwin A. Seibel Apartments, 121–125 Nonotuck St (elderly development 667-2).

Watch: For design firms, through the state's Designer Selection Network (project 137105), not COMMBUYS. Questions about the network go to the EOHLC Designer Selection Coordinator.

Official notice →

Bathroom ventilation replacement, Fruit St and High St

Northampton Housing Authority
Due Wed Oct 21, 2 PM

Replace bathroom ventilation at 35 Fruit Street and 137 High Street.

Watch: The pre-bid walkthrough was Oct 7. Documents at biddocs.com.

Official notice →

Kitchen, bath and electrical rehab, McSherry Gardens Phase 2

Watertown Housing Authority
Due Wed Oct 21, 2 PMEst. $4,882,000DCAMM: General building

The rest of a site-wide modernization: 38 units in five 8-unit buildings. New kitchens and baths, asbestos flooring removed and replaced with resilient and tile floors, and failing or out-of-code mechanical, electrical and plumbing systems replaced.

Watch: Filed sub-bids (tile, resilient flooring, painting, plumbing, HVAC, electrical) were due Oct 7. RFIs closed Sep 29. 5% bid deposit. Participation goals: 8.6% MBE, 8.8% WBE, 3% VBE.

Official notice →

Water service replacement, 56–62 Pond St

Waltham Housing Authority
Due Thu Oct 22, 11 AMEst. $48,000Finish by Nov 15

Replace the water service at 56–62 Pond Street (Lower Pond), plus concrete sidewalk and pad work, work in the basement, resetting granite curb and fencing, and restoration. Designed by GCG Associates.

Watch: The work has to be finished by Nov 15, 2026. RFIs closed Oct 16. Documents at BidDocs.com.

Official notice →

Fire alarm and sprinkler upgrade, Cusack Terrace

Arlington Housing Authority
Due Thu Oct 22, 2 PM

Fire alarm and sprinkler system upgrade at Cusack Terrace (development 667-5), designed by LIRO-Hill.

Watch: The site walk was Sep 29.

Official notice →

Three-bedroom unit turnover, 9 Newtowne Ct

Cambridge Housing Authority
Due Thu Oct 22, 2 PMEst. $15,000–$30,000

Drywall, insulation, a new kitchen, bathroom work, flooring, doors, ceilings, painting and code fixes in unit #39 at 9 Newtowne Ct. 60 calendar days from notice to proceed.

Watch: COMMBUYS moved the due date up to Thu Oct 22; last week it said Oct 30. Davis-Bacon wages apply, and a 50% payment bond is required if the contract tops $25,000. Request the quote documents from [email protected].

Official notice →

Two boilers and new hot water heaters, 895 Belleville Ave

New Bedford Housing Authority
Due Thu Oct 22, 2 PM

Replace two heating boilers, swap two gas-fired water heaters for three new ones, and remove the old solar hot-water pre-heat system.

Watch: The pre-bid was Sep 29.

Official notice →

Emergency lights in common hallways, Laurie Drive

Leominster Housing Authority
Due Fri Oct 23, noon

Install emergency lighting in the common hallways at 33–49 Laurie Drive. Leominster's capital plan lists “Emergency Lights Common Hallways” at Laurie Drive (667-1), $49,913 total cost, planned for fiscal 2027.

Watch: The pre-bid was Oct 14.

Official notice →

Fire alarms and sprinklers at three buildings

Lynn Housing Authority & Neighborhood Development
Due Fri Oct 23, noon

Fire alarm and sprinkler work at Caggiano Plaza (170 South Common St), McGee House (37 Green St) and Shepard & Warren (35 Shepard St), designed by MacRitchie Engineering.

Watch: Filed sub-bids were due Oct 9. The pre-bid was Oct 1.

Official notice →

Gate valve replacement and pipe insulation abatement, Village Green

East Longmeadow Housing Authority
Due Fri Oct 23, 1 PMElectronic bids only

Replace faulty gate valves and abate asbestos pipe insulation at Village Green (667-3), 1 Village Green. East Longmeadow's capital plan lists this project (FISH 085083) at $12,100 total cost, under Village Green 667-1.

Watch: The pre-bid walkthrough was Oct 8. Bids go in at biddocs.com, not COMMBUYS.

Official notice →

Re-roofing at three sites: Thompkins Ave, Lyric Ave, Lull St

East Longmeadow Housing Authority
Due Fri Oct 23, 2 PMElectronic bids only

Tear off and replace the asphalt shingle roofs at 46 Thompkins Ave, 3 Lyric Ave and 1 Lull St. East Longmeadow's capital plan lists this project (FISH 085088) at $92,000 total cost.

Watch: The site visit was Oct 13. Bids go in at Projectdoc.com (project 261873), not COMMBUYS, with a 5% bid deposit.

Official notice →

Fire alarm replacement at four sites

Amherst Housing Authority
Due Fri Oct 23, 3 PMDCAMM: ElectricalElectronic bids only

Replace and modify fire alarm systems at Chestnut Court (667-1), the Jean Elder congregate house (667-3), Sunrise Ave (689-2) and Ann Whalen Apartments (667-2). Amherst's capital plan has an ARPA-funded “Complete Fire Alarm System” project (FISH 008100, $231,164) covering the first three of those developments.

Watch: General bidders need DCAMM certification in Electrical. The optional bidders' conference was Oct 7. Bids go in at biddocs.com, not COMMBUYS.

Official notice →

Courtyard renovation: doors, railings and painting

Mansfield Housing Authority
Due Fri Oct 23, 4 PMEst. $487,715DCAMM: General building

Replace apartment and utility doors and hardware, repair the metal railings, and paint the courtyard walls, decking, and the undersides of the walkways.

Watch: Filed sub-bids (miscellaneous and ornamental metals, painting) were due Oct 9. Participation goals: 15.3% MBE, 6.9% WBE, 3% VBE. The site visit was Sep 17.

Official notice →

Balcony guardrail repair, Bryant Manor

Somerville Housing Authority
Due Fri Oct 23, 4 PMHUD rulesDavis-Bacon + state wages

Repair the concrete parapet walls and modify the aluminum guardrails on 51 concrete balconies, then paint. The building stays occupied.

Watch: HUD procurement rules apply, with both state and Davis-Bacon wage rates. The walkthrough was Sep 29.

Official notice →

Site walks coming up

Pre-bid walkthroughs still ahead. Some are the only chance to see the site before you price, so they fill up calendars fast.

WhenJob and meeting pointBid due
Tue Oct 20
9 AM
Somerville HA: On-call boiler services
30 Memorial Rd, administration building (tell Anthony Crespo you're coming)
Thu Oct 29
Tue Oct 20
10 AM
New Bedford HA: Elevator maintenance
Tripp Towers, 12 Ruth St
Thu Oct 29
Wed Oct 21
10:30 AM
East Longmeadow HA: Common kitchen, patio doors and awning
81 Quarry Hill, main office and community building
Wed Nov 4
Wed Oct 21
11 AM
Braintree HA: Siding repairs
25 Roosevelt St
Wed Nov 4
Wed Oct 21
1 PM
Cambridge HA: Construction manager, Corcoran Park (visit 1 of 3)
Corcoran Park (RSVP to Chris Doran)
Fri Dec 4
Wed Oct 21
1 PM
Chelsea HA: Roll-in showers, Margolis Apartments
260 Clark Ave
Wed Nov 18
Thu Oct 22
10 AM
Fall River HA: Site improvements and tree removal
Bishop Eid, 33 Quequechan St
Thu Oct 29
Thu Oct 22
10 AM
Westford HA: Automatic doors
65-67 Tadmuck Road, then 7 Church Street
Thu Oct 29
Thu Oct 22
11 AM
Dukes County RHA: Building and site improvements
78 Forest Ave, Oak Bluffs (tell the architect 2 days ahead)
Thu Nov 5
Mon Oct 26
1 PM
Cambridge HA: Construction manager, Corcoran Park (visit 2 of 3)
Corcoran Park (RSVP to Chris Doran)
Fri Dec 4
Wed Oct 28
10 AM
Beverly HA: Manual snow removal
17 Courtney Drive
Wed Nov 4
Thu Oct 29
10 AM
Cambridge HA: Construction manager, Corcoran Park (visit 3 of 3)
Corcoran Park (RSVP to Chris Doran)
Fri Dec 4
Thu Oct 29
11 AM
Sutton HA: Bathroom fan installation
5 Church St, community center
Fri Nov 6
Tue Nov 3
11 AM
Dedham HA: Unit renovation
163 Dedham Boulevard, sidewalk by the parking lot
Tue Nov 10

By appointment: snow removal site visits for Avon, Bridgewater, Stoughton and Taunton (Greg Caswell), Sandwich's plumbing and HVAC contract (Eric Steinhilber) and New Bedford's elevator sites (Kevin Rego).

Building jobs due Mon Oct 26 to Fri Oct 30 (9, plus 1 design contract)

Roof, siding, windows and exterior doors

Mashpee Housing Authority
Due Tue Oct 27, 3 PMEst. $927,941DCAMM: General buildingFiled sub-bids Oct 20

Exterior renovation: new roof, siding, windows and exterior doors.

Watch: Roofing and flashing filed sub-bids are due Tue Oct 20, 11 AM. The pre-bid was Oct 6. Participation goals: 7.5% MBE, 6.9% WBE, 3% VBE.

Official notice →

Accessibility and compliance work, Lower Mills

Boston Housing Authority
Due Wed Oct 28, 11 AM

Accessibility and compliance work at the BHA's Lower Mills development (IFB 2373-02). The notice itself has no scope; it's all in the advertisement attached to it.

Watch: Read the attached advertisement for the scope, any pre-bid, and bid requirements.

Official notice →

Parking lot, sidewalks, ramps and stairs

Middleton Housing Authority · listed as “Middleton”
Due Wed Oct 28, 11 AM

Parking lot, sidewalk, ramp and stair work. The notice says no more than that; the details are in the advertisement attached to it. Middleton's fiscal 2027 plan proposes three projects at Orchard Circle: paving, curb cuts, grading and drainage ($385,078 total cost), an ADA ramp repair ($9,500) and a main entry railing replacement ($44,921). This job may cover one or more of them.

Watch: The pre-bid was Oct 14. Run by Chelmsford HA staff (Sharon Smith).

Official notice →

Common bathroom alterations, Hauser Building

Arlington Housing Authority
Due Wed Oct 28, 2 PM

Alterations to the common bathrooms at the Hauser Building (667-4), designed by Abacus Architects + Planners. The advertisement attached to the notice is numbered 010149, which Arlington's capital plan lists as “ADA Bathrooms in Community Room” at the Hauser Building, $125,000 total cost.

Watch: The notice lists a pre-bid on Oct 1 at 8 AM at the Hauser Building, 37 Drake Road, but the notice only went up Oct 7, so check the attached advertisement for the actual date.

Official notice →

Design for modernizing 202 units at Fairmount Apartments (re-advertised)

Boston Housing Authority
Due Wed Oct 28, 2 PM

The BHA wants an architect or engineer (RFP 2421-01) for the modernization of the 202 units at Fairmount Apartments. This is a re-advertisement; the details are in the advertisement attached to the notice.

Watch: For design firms, not contractors.

Official notice →

96 bath fans and 96 kitchen hoods, Riddell Road

East Bridgewater Housing Authority · listed as “SUST - Bath Fan Installation”
Due Thu Oct 29, 2 PMEst. $650,000DCAMM: General building

New bath exhaust fans with humidity and motion controls, each vented to the outside, in 96 bathrooms, plus a new kitchen hood in every apartment. Two adjoining elderly developments, 96 one-bedroom units.

Watch: Filed sub-bids (roofing and flashing, HVAC, electrical) were due Oct 15. The site visit was Oct 6. Participation goals: 6.3% MBE, 9.4% WBE, 3% VBE.

Official notice →

Site improvements and tree removal, Bishop Eid

Fall River Housing Authority
Due Thu Oct 29, 2 PMNew

Site improvements and tree removal at Bishop Eid, 33 Quequechan St (project #095204). The notice gives no more scope than that, and the number is newer than anything in Fall River's posted capital plan.

Watch: Sealed quotes only; don't submit through COMMBUYS. Bid documents are available starting Fri Oct 16; for help, contact Arthur Anderson, the FRHA's director of modernization: 508-675-4565, [email protected]. Optional pre-bid and site visit Thu Oct 22, 10 AM, at Bishop Eid.

Official notice →

Automatic doors: community room and front entrances

Westford Housing Authority · listed as “FISH 330057”
Due Thu Oct 29, 2 PMNew

Automatic doors. Westford's capital plan lists FISH 330057 as “Automatic Doors for Community Room at 667-1 - Front entrance doors at 667-2” at Westford Elderly Housing, $58,544 total cost.

Watch: Open for inspection Thu Oct 22, 10–11 AM, starting at 65-67 Tadmuck Road and moving on to 7 Church Street. Run by Chelmsford HA staff (Sharon Smith).

Official notice →

Tub-to-shower replacement, phase 1

Norwood Housing Authority
Due Fri Oct 30, 1 AMElectronic bids only

Remove tubs, tile surrounds, plumbing trim and flooring; install new shower pans, shower surrounds, plumbing trim and LVT flooring. Norwood's capital plan lists “Tub Surround Replacement - Phase 1” at Willowood (667-1), FISH 220092, $170,320 total cost, which is likely this job.

Watch: Plumbing filed sub-bids were due Oct 16, and the pre-bid was Oct 14. General-bid RFIs close Oct 26 at 1 PM. COMMBUYS still lists the bid opening as 1:00 AM on Oct 30. Every other deadline in the notice is at 1 PM, so that may be a typo; until the bid documents at biddocs.com confirm the time, plan to have your bid in by the end of Oct 29.

Official notice →

Vacant unit renovation, Flag Rock Village

Great Barrington Housing Authority
Due Fri Oct 30, 2 PMElectronic bids only

Kitchen, bathroom and finish renovation of one vacant townhouse-style unit (unit 3) at Flag Rock Village (705-1).

Watch: The pre-bid was Oct 13. Bids go in at biddocs.com, not COMMBUYS, with a 5% bid deposit.

Official notice →

Building jobs due Wed Nov 4 to Fri Dec 4 (7, plus 1 design contract)

Siding repairs

Braintree Housing Authority
Due Wed Nov 4, 2 PMEst. $96,197.50NewElectronic bids only

Replace failing siding planks and re-attach others on the two-story buildings, plus exterior work at community building #25. The siding is a proprietary spec: Cape Cod Cedar Clapboards (section 07 46 90). Braintree's capital plan lists “Siding Repairs 667-3” at Highlands Green for $30,250 total cost, which may be this job, though the notice's estimate is about three times that.

Watch: Site visit Wed Oct 21, 11 AM, 25 Roosevelt St. Bids go in at biddocs.com only; paper bids aren't accepted. Designer: Jacob Levine, [email protected].

Official notice →

Common kitchen, patio doors and awning, McLaren House

East Longmeadow Housing Authority
Due Wed Nov 4, 2 PMNewElectronic bids only

Renovate the common kitchen, replace the patio doors and infill around them with new windows, and replace the exterior awning fabric at McLaren House (667-4), 81 Quarry Hill. East Longmeadow's capital plan lists FISH 085085 as “Replace porch doors” at McLaren House, $16,615 total cost; the job as advertised is bigger than that.

Watch: Pre-bid walk Wed Oct 21, 10:30 AM, at the main office and community building, 81 Quarry Hill. Bids go in at Projectdoc.com (project 262204), not COMMBUYS, with a 5% bid deposit.

Official notice →

Building and site improvements, Forest Ave and Concord Ave (rebid)

Dukes County Regional Housing Authority
Due Thu Nov 5, 3 PMEst. $598,500NewElectronic bids only

A long list: new siding and trim over new rigid insulation, window extension jambs and trim, new windows, luxury vinyl plank in bedrooms, offices and halls, new accessible kitchens with solid-surface counters, parking and driveway landscaping, interior and exterior painting, a new water heater on Forest Ave, a structural crack repair at the Concord Ave kitchen, and two tubs replaced with roll-in showers (one in each building).

Watch: General bidders need DCAMM certification in General Building Construction. Participation goals: 6.1% MBE, 5.8% WBE, 3% VBE. Site visit Thu Oct 22, 11 AM, 78 Forest Ave, Oak Bluffs; tell the architect ([email protected]) at least 2 days ahead. Bids at biddocs.com only. Check the bid documents for any filed sub-bid deadlines.

Official notice →

Bathroom fan installation

Sutton Housing Authority
Due Fri Nov 6, 1 PMNewElectronic bids only

Install bathroom fans. Sutton's capital plan lists “SUST Install Bathroom Fans” at Orchard Apartments (667-1), $130,092 total cost, which is likely this job.

Watch: Pre-bid walk Thu Oct 29, 11 AM, at the community center, 5 Church St. Documents at BidDocsOnline.com; don't submit through COMMBUYS.

Official notice →

Unit renovation

Dedham Housing Authority · listed as “FISH 073157”
Due Tue Nov 10, 1 PMNew

A unit renovation. The notice says no more; the details are in the advertisement attached to it. FISH 073157 is newer than anything in Dedham's posted capital plan.

Watch: Pre-bid Tue Nov 3, 11 AM, 163 Dedham Boulevard: meet on the sidewalk next to the parking lot. Run by Chelmsford HA staff (Sharon Smith).

Official notice →

Architect for envelope restoration and waterproofing, 27 Charter St

Salem Housing Authority
Due Wed Nov 11, 2 PMNew

Salem HA wants an architect for building envelope restoration, insulation and waterproofing at 27 Charter St. Its capital plan has two active Charter Street projects, “HILAPP: Exterior Upgrades (Water Infiltration) Charter St.” at $590,416 and “27 Charter Street Window Replacement Project” at $46,900, plus a proposed fiscal 2027 “Windows, balcony & building envelope” project at $2,765,440; the notice doesn't say which this covers.

Watch: For design firms, not contractors. The request is attached to the notice; contact Debra Tucker, [email protected]. No pre-bid.

Official notice →

Roll-in showers, phase 2, Margolis Apartments

Chelsea Housing Authority · listed as “Plumbing”
Due Wed Nov 18, 1 PM

Roll-in showers at Margolis Apartments (16-4), designed by Architectural Solutions Inc. The scope is in the bid documents.

Watch: Pre-bid Wed Oct 21, 1 PM, 260 Clark Ave. Questions to James Krasco, [email protected]. COMMBUYS lists bids due Wed Nov 18, 1 PM; since the listing is titled only “Plumbing,” check the attached advertisement for whether that's the general bid date and for any filed sub-bid deadlines.

Official notice →

Construction manager, Corcoran Park redevelopment phase 1 (RFP, re-bid)

Cambridge Housing Authority
Due Fri Dec 4, 1 PMNew

The Cambridge Housing Authority, as owner's project manager for the Cambridge Affordable Housing Corp, wants a construction manager with a guaranteed maximum price for Project 1301, the redevelopment of Corcoran Park, phase 1. This is a re-bid.

Watch: For construction management firms. It's procured under Chapter 268 of the Acts of 2022, so Chapter 149/149A, prequalification and filed sub-bids don't apply; the CM brings its own subs, subject to the owner's approval. Three pre-proposal site visits at Corcoran Park: Wed Oct 21, 1 PM; Mon Oct 26, 1 PM; Thu Oct 29, 10 AM. RSVP to Chris Doran, [email protected]. Don't respond in COMMBUYS.

Official notice →

Filed sub-bid deadlines

On bigger state-funded building jobs, certain trades bid straight to the housing authority, before the general contractors do. If you're one of those trade subs, this is your deadline, not the general bid date.

Sub-bids dueJob and tradesGeneral bids
Tue Oct 20
11 AM
Mashpee HA: Roof, siding, windows, doors
Roofing and flashing
Tue Oct 27

Service contracts (15)

Mini-split heat pump maintenance for Suffolk County housing authorities
Chelmsford Housing Authority. Annual preventive maintenance on ductless mini-split systems for the housing authorities in Suffolk County. The virtual pre-bid was Oct 14. Run by Chelmsford HA staff (Sharon Smith).
Wed Oct 21, 2 PM
NSPIRE inspections for the voucher program
Greenfield Housing Authority. About 500 inspections and 175 re-inspections a year. One year plus a one-year option. RFP on Projectdoc.com #262195.
Wed Oct 21, 2 PM
Integrated pest management
Arlington Housing Authority. RFP; the advertisement is attached.
Thu Oct 22, 2 PM
On-call HVAC services
Somerville Housing Authority. Multiple Somerville HA locations (IFB P-HVAC102026). The site visit was Oct 13.
Fri Oct 23, 2 PM
Snow removal at four authorities south of Boston
Avon $12,000 · Bridgewater $105,000 · Stoughton $130,000 · Taunton $180,000. On-call, as-needed snow removal. Four separate bids, one per authority, all under Projectdoc.com project #262295; bids go in there, not COMMBUYS. Questions to Kirsten Masterson or Greg Caswell until Oct 22, 10 AM. Taunton, Bridgewater and Avon are three-year contracts; Stoughton's notice doesn't give a term. Site visits by appointment: Greg Caswell, (857) 276-4159.
Wed Oct 28, 10 AM
Housing inspection services, 3 years (RFP)
Medford Housing Authority. Inspections for public and leased housing, estimated at $95,000 a year. Request the RFP from Gabriel Ciccariello, [email protected].
Thu Oct 29, 2 PM
Elevator maintenance, 3 years New
New Bedford Housing Authority. Elevator maintenance for three years; the notice asks for a DCAMM-certified elevator maintenance company. Request the bid documents by emailing Kevin Rego, [email protected]; sealed bids go to the NBHA procurement office, 128 Union St, 4th floor. Walkthrough Tue Oct 20, 10 AM, starting at Tripp Towers, 12 Ruth St. The sites can also be seen by appointment.
Thu Oct 29, 2 PM
Plumbing and HVAC maintenance and repairs, 3 years New
Sandwich Housing Authority. Plumbing and HVAC maintenance and repairs for the Sandwich Housing Authority, estimated at $45,000 over three years and capped at $50,000. Quotes go in at ProjectDoc.com (code 262406), not COMMBUYS. Questions in writing to Eric Steinhilber, [email protected], by Oct 23. Site visits by appointment only.
Thu Oct 29, 2 PM
On-call boiler and associated equipment services New
Somerville Housing Authority. Multiple Somerville HA locations. Documents at sha-web.org/bids.aspx. Site visit Tue Oct 20, 9 AM, at the administration building, 30 Memorial Rd; let Anthony Crespo know if you're coming ([email protected], (617) 996-0906).
Thu Oct 29, 2 PM
Asbestos abatement, as needed, 3 years
Lowell Housing Authority. Removal and disposal of asbestos found during apartment renovations; testing and monitoring are done by others. IFB at lhma.org/bids. No pre-bid.
Fri Oct 30, 11 AM
HVAC equipment maintenance and repair, 3 years
Lowell Housing Authority. Preventive maintenance, inspections, repairs and emergency response for boilers, hot water, heating equipment, controls and pumps. The notice's summary also mentions replacing boilers, water heaters and storage tanks, so check the IFB (lhma.org/bids) for the exact scope. No pre-bid.
Fri Oct 30, 11 AM
Manual snow removal New
Beverly Housing Authority. Pretreatment, deicing, snow blowing and shoveling of walkways at 10 BHA elderly developments. IFB at beverlyhousing.net or from Dawn Goodwin, [email protected]. Pre-bid Wed Oct 28, 10 AM, 17 Courtney Drive.
Wed Nov 4, 2 PM

Titles that hide the job

These are the actual titles on COMMBUYS. If you search by trade, you'll never find them.

Listed asWhat it actually is
“FISH 254047”
Rowley HA
Exterior door replacement
“Designer”
Groton HA
Construction administration on a $1,225,000 project
“Middleton”
Middleton HA
Parking lot, sidewalks, ramps and stairs
“Plumbing”
Chelsea HA
Roll-in showers, phase 2, at Margolis Apartments
“ASHP Suffolk County”
Chelmsford HA
Annual maintenance on ductless mini-split heat pumps for the Suffolk County housing authorities
“FISH 330057”
Westford HA
Automatic doors for the community room at 667-1 and the front entrances at 667-2
“FISH 073157”
Dedham HA
A unit renovation (the notice's only description; the number isn't in Dedham's posted plan yet)
“NBHA-26-150”
New Bedford HA
Elevator maintenance, 3 years

What's a FISH number? FISH is the Financial Information System for Housing, the state housing office's tracker for capital projects. Per the state, every project, large and small, gets a FISH number. The first three digits identify the housing authority, and the rest is the project. Match it against the authority's capital plan and you get the job, the development and the budget. That's how the Westford and East Longmeadow jobs above were matched to their plans.

Coming next: what housing authorities plan to fix this year

Every housing authority files a capital plan with the state. I went through all 230 on the state's portal. In the 131 plans in this year's new format, 93 authorities list 453 projects for fiscal 2027 (July 2026 through June 2027), about $95 million in total project costs. Here's that work by trade:

TradeProjectsBudgets
Paving, walkways & site62$15.8M
Heating, boilers & HVAC47$15.8M
Windows & doors56$13.2M
Elevators6$11.4M
Roofing & gutters28$6.6M
Kitchens & baths40$6.2M
Siding, masonry & exterior36$4.8M
Fire alarm & sprinklers14$3.8M
Electrical & generators22$2.8M
Water, sewer & plumbing19$2.5M
Unit turnovers & renovations36$1.7M
Accessibility (ADA)5$1.5M
Security & access13$1.3M
Interiors, flooring & painting21$1.2M
Everything else48$6.1M

A rough split by the words in each project's title. Paving and site includes a $5 million flood-resilience project in Gloucester. Work the authorities do with their own staff is left out.

The ten biggest planned projects. Gloucester and Woburn alone list about $38 million between them.

AuthorityPlanned jobBudget
Woburn HAElevator major upgrade (listed as a funding request)$7,653,603
Gloucester HAStorm resilience: trimming and site flood protection, Riverdale Park$5,047,129
Gloucester HAMechanical and electrical systems, Riverdale Park$4,880,995
Salem HAWindows, balconies and building envelope, Charter St$2,765,440
Salem HAPaving, Rainbow Terrace$2,515,377
Woburn HARoofs, Nichols Street Extension$2,363,920
Gloucester HANew elevator, Curtis B. Clark$2,250,000
Woburn HABathroom modernization$1,910,846
Gloucester HAMeter upgrade, Lincoln Park$1,623,740
Wakefield HAFire alarm and Federal Pacific panel upgrade, Harts Hill$1,364,004

Each budget links to the authority's plan. These are plans, not bids. The plans themselves warn that costs often rise before construction and that projects get delayed or split into phases. Budgets are total project costs, including design. Every authority's plan, one page each.

Everything else housing authorities posted (5)

Banking services (RFP)
Worcester Housing Authority.
Tue Oct 20, 2 PM
Annual audits, fiscal 2026–2028
Arlington Housing Authority.
Wed Oct 21, 2 PM
Site-based wait list discrimination testing (RFP)
Boston Housing Authority. Details are in the advertisement attached to the notice.
Wed Oct 21, 2 PM
HMIS/data systems administrator (RFP) New
Lynn Housing Authority & Neighborhood Development. Not construction: an administrator for the Homeless Management Information System. The notice gives a question deadline of noon Sep 30, before it was posted, so ask Erin Sheehan ([email protected]) whether questions are still being taken.
Fri Oct 30, 10 AM

Other public building work: towns, cities and state (21)

Building and maintenance jobs from towns, cities and state agencies that appeared on COMMBUYS since last week's issue. Earlier ones are in Issue #3, Issue #2 and Issue #1. I cleaned up the titles but haven't read these notices yet, so check each one for scope and requirements.

Due next week

Flaherty Pool repairs
City of Boston.
Tue Oct 27, noon
Wed Oct 28, 10 AM
Wed Oct 28, 10 AM
Thu Oct 29, 11 AM
LED interior and exterior lighting conversion
Groton-Dunstable Regional School District.
Fri Oct 30, 11 AM

Due later

Wed Nov 4, 11 AM
Replacement windows
South Deerfield Fire District.
Wed Nov 4, 2 PM
Explosion-proof light replacement
Town of West Springfield.
Fri Nov 6, 10 AM
Forest River Park bathroom renovation
City of Salem. COMMBUYS lists 12:00 AM, the very start of Nov 10. That may be a placeholder; check the notice, and to be safe plan for the end of Nov 9.
Tue Nov 10
Thu Nov 12, 11 AM
Thu Nov 12, 2 PM
Wed Nov 18, 2 PM
Wed Nov 18, 2 PM
Mon Nov 30, noon