Issue #3 covers every housing authority solicitation on COMMBUYS that is still open this week (pulled Fri Oct 9): 56 in all, 22 of them new since last week and marked New. I read each notice. For every job you get what it is, when it's due, and what could trip you up. Every item links to the official notice.

This week at a glance

Building jobs due this week (7)

Exterior door replacement, Sunshine Ave

Randolph Housing Authority
Due Tue Oct 13, 1 PMEst. $85,000Electronic bids only

New rear exterior doors on the apartment buildings, maintenance-room doors and the community room's main entry: frames, leaves, hardware and accessories.

Watch: The site visit was Oct 6. Bids go in at biddocs.com.

Official notice →

Kitchen replacement

Mansfield Housing Authority
Due Tue Oct 13, 3 PMEst. $80,000Electronic bids only

Tear out and replace kitchen cabinets, appliances and countertops. New kitchen flooring in unit 16. Duct the range hood to the outside.

Watch: The pre-bid was Sep 18. Bids go in at biddocs.com.

Official notice →

Window replacement, Golden Circle

Brockton Housing Authority · listed as “Estimated Construction Cost $390,000”
Due Wed Oct 14, 11 AMEst. $390,000

Remove the old windows, prep the masonry and wood-framed openings, and install new double-hung windows with interior and exterior trim.

Watch: The pre-bid was Oct 7.

Official notice →

Roofing and vinyl siding

Adams Housing Authority
Due Wed Oct 14, noon5% bid depositElectronic bids only

Strip the asphalt roofing and vinyl siding; install a new asphalt roof and vinyl siding with PVC trim. Minor electrical fixture replacement too.

Watch: The pre-bid was Sep 29. The 5% deposit applies to general bids and sub-bids. Bids go in at biddocs.com, not COMMBUYS.

Official notice →

Furnaces and water heaters to electric

Hopkinton Housing Authority · listed as “FISH 139064”
Due Wed Oct 14, 2 PMPlan budget $102,970

Replace the furnaces and hot water heaters with electric equipment: air-source heat pumps and electric water heaters, per Hopkinton's capital plan.

Watch: The walkthrough with BLW Engineers met at Brampton Circle on Sep 23, but the capital plan lists this project number under Bisson Rue, so confirm which buildings are in scope. Chelmsford HA staff run this one too.

Official notice →

Bulkhead door replacement, M. Kelly Vet and Family Housing

Swampscott Housing Authority · listed as “FISH 291085”
Due Fri Oct 16, 2 PMNew

Replace all bulkhead doors. Swampscott's capital plan lists FISH 291085 as “Bulkhead replacement” at M. Kelly Vet and Family Housing, $123,400 total cost.

Watch: The site was open for inspection on Oct 7. Run by Chelmsford HA staff (Sharon Smith).

Official notice →

Vacant unit renovation, M. Kelly Vet and Family Housing

Swampscott Housing Authority · listed as “FISH 291084”
Due Fri Oct 16, 2 PMNew

Renovate a vacant unit (the notice says “the vacant 200-1 unit”). Swampscott's capital plan lists FISH 291084 as “Vacancy Renovation” at M. Kelly Vet and Family Housing, $122,300 total cost.

Watch: The site was open for inspection on Oct 7. Run by Chelmsford HA staff (Sharon Smith).

Official notice →

Site walks coming up

Pre-bid walkthroughs still ahead. Some are the only chance to see the site before you price, so they fill up calendars fast.

WhenJob and meeting pointBid due
Tue Oct 13
9 AM
Somerville HA: On-call HVAC services
30 Memorial Rd, administration building
Fri Oct 23
Tue Oct 13
11 AM
Great Barrington HA: Vacant unit renovation
2 Bernard Gibbons Drive, outside the community building
Fri Oct 30
Tue Oct 13
11 AM
Randolph HA: Fire exit and entry doors
One Decelle Drive, courtyard
Tue Oct 20
Tue Oct 13
1:30 PM
East Longmeadow HA: Re-roofing at three sites
81 Quarry Hill, then the three sites
Fri Oct 23
Wed Oct 14
10 AM
Leominster HA: Emergency hallway lights
33–49 Laurie Drive
Fri Oct 23
Wed Oct 14
10 AM
Norwood HA: Tub-to-shower replacement
Community Building, 6 Adams St
Fri Oct 30
Wed Oct 14
2 PM
Middleton HA: Parking lot, sidewalks, ramps and stairs
80 South Main St, in front of the office
Wed Oct 28
Wed Oct 21
1 PM
Chelsea HA: Roll-in showers, Margolis Apartments
260 Clark Ave
Wed Nov 18

By appointment: snow removal site visits for Avon, Bridgewater, Stoughton and Taunton, Greg Caswell.

Building jobs due Mon Oct 19 to Fri Oct 23 (14, plus 2 design contracts)

Fire exit and main entry doors

Randolph Housing Authority
Due Tue Oct 20, 1 PMEst. $52,000Electronic bids only

Replace four steel fire doors, one entrance door with its framing and large sidelight, and one garage door: tear-out, prep, and new doors, frames and hardware. The notice doesn't give the building; Randolph's capital plan lists “Replace Fire Exit & Main Entry Doors” at McCauley Murray Lewis (667-03), $89,843 total cost, which is likely this job.

Watch: Site visit Tue Oct 13, 11 AM, One Decelle Drive (meet in the courtyard in front of the office entrance). Bids go in at biddocs.com. Separate from Randolph's Sunshine Ave door job, due Oct 13.

Official notice →

Exterior door replacement

Rowley Housing Authority · listed as “FISH 254047”
Due Wed Oct 21, 10 AM

Exterior door replacement. The notice itself says only “Doors”; the attached spec is titled “Rowley 254047 Exterior Doors.” Rowley's fiscal 2027 plan lists two door projects, “Replace Exterior Doors” at Plantation ($140,585 total development cost) and “Exterior Door/Screen Door Replacement” ($216,876, no development named), so this is likely one of them.

Watch: The pre-bid was Oct 8. Run by Chelmsford HA staff (Sharon Smith).

Official notice →

Construction administration on a $1.2M project (for designers)

Groton Housing Authority · listed as “Designer”
Due Wed Oct 21, 2 PM

Groton HA wants a designer for construction administration on a project with a $1,225,000 construction cost. The notice doesn't name the project; the details are in the document attached to the notice.

Watch: For design firms, not contractors. Run by Chelmsford HA staff (Sharon Smith).

Official notice →

Heating electrification at Seibel Apartments (for designers)

Holyoke Housing Authority
Due Wed Oct 21, 2 PM

Design and construction administration for converting heating and hot water systems, and upgrading building electrical service, at five buildings of the Edwin A. Seibel Apartments, 121–125 Nonotuck St (elderly development 667-2).

Watch: For design firms, through the state's Designer Selection Network (project 137105), not COMMBUYS. Questions about the network go to the EOHLC Designer Selection Coordinator.

Official notice →

Bathroom ventilation replacement, Fruit St and High St

Northampton Housing Authority
Due Wed Oct 21, 2 PM

Replace bathroom ventilation at 35 Fruit Street and 137 High Street.

Watch: The pre-bid walkthrough was Oct 7. Documents at biddocs.com.

Official notice →

Kitchen, bath and electrical rehab, McSherry Gardens Phase 2

Watertown Housing Authority
Due Wed Oct 21, 2 PMEst. $4,882,000DCAMM: General building

The rest of a site-wide modernization: 38 units in five 8-unit buildings. New kitchens and baths, asbestos flooring removed and replaced with resilient and tile floors, and failing or out-of-code mechanical, electrical and plumbing systems replaced.

Watch: Filed sub-bids (tile, resilient flooring, painting, plumbing, HVAC, electrical) were due Oct 7. RFIs closed Sep 29. 5% bid deposit. Participation goals: 8.6% MBE, 8.8% WBE, 3% VBE.

Official notice →

Water service replacement, 56–62 Pond St

Waltham Housing Authority
Due Thu Oct 22, 11 AMEst. $48,000Finish by Nov 15

Replace the water service at 56–62 Pond Street (Lower Pond), plus concrete sidewalk and pad work, work in the basement, resetting granite curb and fencing, and restoration. Designed by GCG Associates.

Watch: The work has to be finished by Nov 15, 2026. RFIs close Fri Oct 16 at noon. Documents at BidDocs.com.

Official notice →

Fire alarm and sprinkler upgrade, Cusack Terrace

Arlington Housing Authority
Due Thu Oct 22, 2 PM

Fire alarm and sprinkler system upgrade at Cusack Terrace (development 667-5), designed by LIRO-Hill.

Watch: The site walk was Sep 29.

Official notice →

Two boilers and new hot water heaters, 895 Belleville Ave

New Bedford Housing Authority
Due Thu Oct 22, 2 PM

Replace two heating boilers, swap two gas-fired water heaters for three new ones, and remove the old solar hot-water pre-heat system.

Watch: The pre-bid was Sep 29.

Official notice →

Emergency lights in common hallways, Laurie Drive

Leominster Housing Authority
Due Fri Oct 23, noonNew

Install emergency lighting in the common hallways at 33–49 Laurie Drive. Leominster's capital plan lists “Emergency Lights Common Hallways” at Laurie Drive (667-1), $49,913 total cost, planned for fiscal 2027.

Watch: Pre-bid Wed Oct 14, 10–11 AM, at the site.

Official notice →

Fire alarms and sprinklers at three buildings

Lynn Housing Authority & Neighborhood Development
Due Fri Oct 23, noon

Fire alarm and sprinkler work at Caggiano Plaza (170 South Common St), McGee House (37 Green St) and Shepard & Warren (35 Shepard St), designed by MacRitchie Engineering.

Watch: Filed sub-bids were due Oct 9. The pre-bid was Oct 1.

Official notice →

Gate valve replacement and pipe insulation abatement, Village Green

East Longmeadow Housing Authority
Due Fri Oct 23, 1 PMNewElectronic bids only

Replace faulty gate valves and abate asbestos pipe insulation at Village Green (667-3), 1 Village Green. East Longmeadow's capital plan lists this project (FISH 085083) at $12,100 total cost, under Village Green 667-1.

Watch: The pre-bid walkthrough was Oct 8. Bids go in at biddocs.com, not COMMBUYS.

Official notice →

Re-roofing at three sites: Thompkins Ave, Lyric Ave, Lull St

East Longmeadow Housing Authority
Due Fri Oct 23, 2 PMNewElectronic bids only

Tear off and replace the asphalt shingle roofs at 46 Thompkins Ave, 3 Lyric Ave and 1 Lull St. East Longmeadow's capital plan lists this project (FISH 085088) at $92,000 total cost.

Watch: Site visit Tue Oct 13, 1:30 PM: meet at the housing authority, 81 Quarry Hill, then go to the three sites. Bids go in at Projectdoc.com (project 261873), not COMMBUYS, with a 5% bid deposit.

Official notice →

Fire alarm replacement at four sites

Amherst Housing Authority
Due Fri Oct 23, 3 PMDCAMM: ElectricalElectronic bids only

Replace and modify fire alarm systems at Chestnut Court (667-1), the Jean Elder congregate house (667-3), Sunrise Ave (689-2) and Ann Whalen Apartments (667-2). Amherst's capital plan has an ARPA-funded “Complete Fire Alarm System” project (FISH 008100, $231,164) covering the first three of those developments.

Watch: General bidders need DCAMM certification in Electrical. The optional bidders' conference was Oct 7. Bids go in at biddocs.com, not COMMBUYS.

Official notice →

Courtyard renovation: doors, railings and painting

Mansfield Housing Authority
Due Fri Oct 23, 4 PMEst. $487,715DCAMM: General building

Replace apartment and utility doors and hardware, repair the metal railings, and paint the courtyard walls, decking, and the undersides of the walkways.

Watch: Filed sub-bids (miscellaneous and ornamental metals, painting) were due Oct 9. Participation goals: 15.3% MBE, 6.9% WBE, 3% VBE. The site visit was Sep 17.

Official notice →

Balcony guardrail repair, Bryant Manor

Somerville Housing Authority
Due Fri Oct 23, 4 PMHUD rulesDavis-Bacon + state wages

Repair the concrete parapet walls and modify the aluminum guardrails on 51 concrete balconies, then paint. The building stays occupied.

Watch: HUD procurement rules apply, with both state and Davis-Bacon wage rates. The walkthrough was Sep 29.

Official notice →

Building jobs due Tue Oct 27 to Wed Nov 18 (9, plus 1 design contract)

Roof, siding, windows and exterior doors

Mashpee Housing Authority
Due Tue Oct 27, 3 PMEst. $927,941DCAMM: General buildingFiled sub-bids Oct 20

Exterior renovation: new roof, siding, windows and exterior doors.

Watch: Roofing and flashing filed sub-bids are due Tue Oct 20, 11 AM. The pre-bid was Oct 6. Participation goals: 7.5% MBE, 6.9% WBE, 3% VBE.

Official notice →

Accessibility and compliance work, Lower Mills

Boston Housing Authority
Due Wed Oct 28, 11 AMNew

Accessibility and compliance work at the BHA's Lower Mills development (IFB 2373-02). The notice itself has no scope; it's all in the advertisement attached to it.

Watch: Read the attached advertisement for the scope, any pre-bid, and bid requirements.

Official notice →

Parking lot, sidewalks, ramps and stairs

Middleton Housing Authority · listed as “Middleton”
Due Wed Oct 28, 11 AMNew

Parking lot, sidewalk, ramp and stair work. The notice says no more than that; the details are in the advertisement attached to it. Middleton's fiscal 2027 plan proposes three projects at Orchard Circle: paving, curb cuts, grading and drainage ($385,078 total cost), an ADA ramp repair ($9,500) and a main entry railing replacement ($44,921). This job may cover one or more of them.

Watch: Pre-bid Wed Oct 14, 2 PM: meet in front of the housing authority office, 80 South Main St. Run by Chelmsford HA staff (Sharon Smith).

Official notice →

Common bathroom alterations, Hauser Building

Arlington Housing Authority
Due Wed Oct 28, 2 PMNew

Alterations to the common bathrooms at the Hauser Building (667-4), designed by Abacus Architects + Planners. The advertisement attached to the notice is numbered 010149, which Arlington's capital plan lists as “ADA Bathrooms in Community Room” at the Hauser Building, $125,000 total cost.

Watch: The notice lists a pre-bid on Oct 1 at 8 AM at the Hauser Building, 37 Drake Road, but the notice only went up Oct 7, so check the attached advertisement for the actual date.

Official notice →

Design for modernizing 202 units at Fairmount Apartments (re-advertised)

Boston Housing Authority
Due Wed Oct 28, 2 PMNew

The BHA wants an architect or engineer (RFP 2421-01) for the modernization of the 202 units at Fairmount Apartments. This is a re-advertisement; the details are in the advertisement attached to the notice.

Watch: For design firms, not contractors.

Official notice →

96 bath fans and 96 kitchen hoods, Riddell Road

East Bridgewater Housing Authority · listed as “SUST - Bath Fan Installation”
Due Thu Oct 29, 2 PMEst. $650,000DCAMM: General buildingFiled sub-bids Oct 15

New bath exhaust fans with humidity and motion controls, each vented to the outside, in 96 bathrooms, plus a new kitchen hood in every apartment. Two adjoining elderly developments, 96 one-bedroom units.

Watch: Filed sub-bids (roofing and flashing, HVAC, electrical) are due Thu Oct 15, 2 PM. The site visit was Oct 6. Participation goals: 6.3% MBE, 9.4% WBE, 3% VBE.

Official notice →

Tub-to-shower replacement, phase 1

Norwood Housing Authority
Due Fri Oct 30, 1 AMNewFiled sub-bids Oct 16Electronic bids only

Remove tubs, tile surrounds, plumbing trim and flooring; install new shower pans, shower surrounds, plumbing trim and LVT flooring. Norwood's capital plan lists “Tub Surround Replacement - Phase 1” at Willowood (667-1), FISH 220092, $170,320 total cost, which is likely this job.

Watch: Plumbing filed sub-bids are due Fri Oct 16, 1 PM. Pre-bid Wed Oct 14, 10 AM, Community Building, 6 Adams St. General-bid RFIs close Oct 26 at 1 PM. COMMBUYS lists the bid opening as 1:00 AM on Oct 30. Every other deadline in the notice is at 1 PM, so that may be a typo; until the bid documents at biddocs.com confirm the time, plan to have your bid in by the end of Oct 29.

Official notice →

Three-bedroom unit turnover, 9 Newtowne Ct

Cambridge Housing Authority
Due Fri Oct 30, 2 PMEst. $15,000–$30,000New

Drywall, insulation, a new kitchen, bathroom work, flooring, doors, ceilings, painting and code fixes in unit #39 at 9 Newtowne Ct. 60 calendar days from notice to proceed.

Watch: Davis-Bacon wages apply, and a 50% payment bond is required if the contract tops $25,000. Request the quote documents from [email protected].

Official notice →

Vacant unit renovation, Flag Rock Village

Great Barrington Housing Authority
Due Fri Oct 30, 2 PMNewElectronic bids only

Kitchen, bathroom and finish renovation of one vacant townhouse-style unit (unit 3) at Flag Rock Village (705-1).

Watch: Pre-bid Tue Oct 13, 11 AM, outside the community building at 2 Bernard Gibbons Drive. Bids go in at biddocs.com, not COMMBUYS, with a 5% bid deposit.

Official notice →

Roll-in showers, phase 2, Margolis Apartments

Chelsea Housing Authority · listed as “Plumbing”
Due Wed Nov 18, 1 PMNew

Roll-in showers at Margolis Apartments (16-4), designed by Architectural Solutions Inc. The scope is in the bid documents.

Watch: Pre-bid Wed Oct 21, 1 PM, 260 Clark Ave. Questions to James Krasco, [email protected]. COMMBUYS lists bids due Wed Nov 18, 1 PM; since the listing is titled only “Plumbing,” check the attached advertisement for whether that's the general bid date and for any filed sub-bid deadlines.

Official notice →

Filed sub-bid deadlines

On bigger state-funded building jobs, certain trades bid straight to the housing authority, before the general contractors do. If you're one of those trade subs, this is your deadline, not the general bid date.

Sub-bids dueJob and tradesGeneral bids
Thu Oct 15
2 PM
East Bridgewater HA: Bath fans + kitchen hoods
Roofing and flashing, HVAC, electrical
Thu Oct 29
Fri Oct 16
1 PM
Norwood HA: Tub-to-shower replacement, phase 1
Plumbing
Fri Oct 30
Tue Oct 20
11 AM
Mashpee HA: Roof, siding, windows, doors
Roofing and flashing
Tue Oct 27

Service contracts (18)

Elevator service, 3 years, three family developments (rebid)
Boston Housing Authority. Details are in the attached advertisement.
Wed Oct 14, noon
Vacant-unit turnover trades, Hampshire County (Worcester HA, 3 contracts)
Carpentry · Flooring · Painting. Worcester HA's Vacancy Unit Task Force needs general carpentry, tile and hardwood flooring, and painting to get vacant units across Hampshire County ready for new tenants. One contract per trade; packages at worcesterha.org/currentbids.html.
Wed Oct 14, 2 PM
Asbestos removal, as needed, Worcester units
Worcester Housing Authority. Floor tile, pipe insulation and other asbestos materials in state and federal units across Worcester, as needed. Bid packages at worcesterha.org/currentbids.html.
Wed Oct 14, 2 PM
Rubbish removal, 2 years
Holyoke Housing Authority. Electronic bids at Projectdoc.com, project 262090.
Fri Oct 16, 2 PM
Fire alarm testing, maintenance and repairs, 3 years
Walpole Housing Authority. Estimated $20,000 over three years, capped at $50,000. Projectdoc.com #262199. The optional pre-bid was Oct 6.
Fri Oct 16, 2 PM
Mini-split heat pump maintenance for Suffolk County housing authorities New
Chelmsford Housing Authority. Annual preventive maintenance on ductless mini-split systems for the housing authorities in Suffolk County. Virtual pre-bid on Teams Wed Oct 14, 10 AM (link in the notice). Run by Chelmsford HA staff (Sharon Smith).
Wed Oct 21, 2 PM
NSPIRE inspections for the voucher program
Greenfield Housing Authority. About 500 inspections and 175 re-inspections a year. One year plus a one-year option. RFP on Projectdoc.com #262195.
Wed Oct 21, 2 PM
Integrated pest management
Arlington Housing Authority. RFP; the advertisement is attached.
Thu Oct 22, 2 PM
On-call HVAC services New
Somerville Housing Authority. Multiple Somerville HA locations (IFB P-HVAC102026). Site visit Tue Oct 13, 9 AM, at the administration building, 30 Memorial Rd.
Fri Oct 23, 2 PM
Snow removal at four authorities south of Boston New
Avon $12,000 · Bridgewater $105,000 · Stoughton $130,000 · Taunton $180,000. On-call, as-needed snow removal. Four separate bids, one per authority, all under Projectdoc.com project #262295; bids go in there, not COMMBUYS. Questions to Kirsten Masterson or Greg Caswell until Oct 22, 10 AM. Taunton, Bridgewater and Avon are three-year contracts; Stoughton's notice doesn't give a term. Site visits by appointment: Greg Caswell, (857) 276-4159.
Wed Oct 28, 10 AM
Housing inspection services, 3 years (RFP) New
Medford Housing Authority. Inspections for public and leased housing, estimated at $95,000 a year. Request the RFP from Gabriel Ciccariello, [email protected].
Thu Oct 29, 2 PM
Asbestos abatement, as needed, 3 years New
Lowell Housing Authority. Removal and disposal of asbestos found during apartment renovations; testing and monitoring are done by others. IFB at lhma.org/bids. No pre-bid.
Fri Oct 30, 11 AM
HVAC equipment maintenance and repair, 3 years New
Lowell Housing Authority. Preventive maintenance, inspections, repairs and emergency response for boilers, hot water, heating equipment, controls and pumps. The notice's summary also mentions replacing boilers, water heaters and storage tanks, so check the IFB (lhma.org/bids) for the exact scope. No pre-bid.
Fri Oct 30, 11 AM

Titles that hide the job

These are the actual titles on COMMBUYS. If you search by trade, you'll never find them.

Listed asWhat it actually is
“FISH 139064”
Hopkinton HA
Furnaces and water heaters replaced with electric heat pumps and water heaters
“Estimated Construction Cost $390,000”
Brockton HA
Window replacement at Golden Circle
“FISH 254047”
Rowley HA
Exterior door replacement
“Designer”
Groton HA
Construction administration on a $1,225,000 project
“FISH 291085”
Swampscott HA
Bulkhead door replacement at M. Kelly Vet and Family Housing
“FISH 291084”
Swampscott HA
Renovation of a vacant unit at M. Kelly Vet and Family Housing
“Middleton”
Middleton HA
Parking lot, sidewalks, ramps and stairs
“Plumbing”
Chelsea HA
Roll-in showers, phase 2, at Margolis Apartments
“ASHP Suffolk County”
Chelmsford HA
Annual maintenance on ductless mini-split heat pumps for the Suffolk County housing authorities

What's a FISH number? FISH is the Financial Information System for Housing, the state housing office's tracker for capital projects. Per the state, every project, large and small, gets a FISH number. The first three digits identify the housing authority, and the rest is the project. Match it against the authority's capital plan and you get the job, the development and the budget. That's how the Swampscott and Hopkinton jobs above were decoded.

Coming next: what housing authorities plan to fix this year

Every housing authority files a capital plan with the state. I went through all 230 on the state's portal. In the 131 plans in this year's new format, 93 authorities list 453 projects for fiscal 2027 (July 2026 through June 2027), about $95 million in total project costs. Here's that work by trade:

TradeProjectsBudgets
Paving, walkways & site62$15.8M
Heating, boilers & HVAC47$15.8M
Windows & doors56$13.2M
Elevators6$11.4M
Roofing & gutters28$6.6M
Kitchens & baths40$6.2M
Siding, masonry & exterior36$4.8M
Fire alarm & sprinklers14$3.8M
Electrical & generators22$2.8M
Water, sewer & plumbing19$2.5M
Unit turnovers & renovations36$1.7M
Accessibility (ADA)5$1.5M
Security & access13$1.3M
Interiors, flooring & painting21$1.2M
Everything else48$6.1M

A rough split by the words in each project's title. Paving and site includes a $5 million flood-resilience project in Gloucester. Work the authorities do with their own staff is left out.

The ten biggest planned projects. Gloucester and Woburn alone list about $38 million between them.

AuthorityPlanned jobBudget
Woburn HAElevator major upgrade (listed as a funding request)$7,653,603
Gloucester HAStorm resilience: trimming and site flood protection, Riverdale Park$5,047,129
Gloucester HAMechanical and electrical systems, Riverdale Park$4,880,995
Salem HAWindows, balconies and building envelope, Charter St$2,765,440
Salem HAPaving, Rainbow Terrace$2,515,377
Woburn HARoofs, Nichols Street Extension$2,363,920
Gloucester HANew elevator, Curtis B. Clark$2,250,000
Woburn HABathroom modernization$1,910,846
Gloucester HAMeter upgrade, Lincoln Park$1,623,740
Wakefield HAFire alarm and Federal Pacific panel upgrade, Harts Hill$1,364,004

Each budget links to the authority's plan. These are plans, not bids. The plans themselves warn that costs often rise before construction and that projects get delayed or split into phases. Budgets are total project costs, including design. Every authority's plan, one page each.

Everything else housing authorities posted (5)

Wed Oct 14, 2 PM
Banking services (RFP)
Worcester Housing Authority.
Tue Oct 20, 2 PM
Annual audits, fiscal 2026–2028
Arlington Housing Authority.
Wed Oct 21, 2 PM
Site-based wait list discrimination testing (RFP)
Boston Housing Authority. Details are in the advertisement attached to the notice.
Wed Oct 21, 2 PM

Other public building work: towns, cities and state (21)

Building jobs from towns, cities and state agencies that appeared on COMMBUYS since last week's issue. Earlier ones are in Issue #2 and Issue #1. I cleaned up the titles but haven't read these notices yet, so check each one for scope and requirements.

Due next week

Victaulic fitting replacement
Northborough and Southborough Public Schools.
Wed Oct 21, 11 AM
Wed Oct 21, 3 PM
Wed Oct 21, 4:30 PM
Comcad rooftop unit replacement
Massachusetts Maritime Academy.
Thu Oct 22, 2 PM
Thu Oct 22, 2 PM
Kelly Power Plant roof replacement
Massachusetts Maritime Academy.
Thu Oct 22, 3 PM
Fri Oct 23, 9 AM
Fri Oct 23, 10 AM
Fri Oct 23, 1 PM
Sitterly Building roof replacement
Department of Mental Health.
Fri Oct 23, 2 PM
CIE fire alarm replacement
University of Massachusetts.
Fri Oct 23, 2 PM

Due later

Lighting control system upgrade, MassMutual Center
Massachusetts Convention Center Authority.
Wed Oct 28, noon
Roof replacement
Town of Brookline.
Wed Oct 28, 2 PM
Thu Oct 29, 11 AM
Waterproofing and repairs, Union Station garage (WRA)
City of Worcester. COMMBUYS lists 12:00 AM, the very start of Nov 4.
Wed Nov 4
Wed Nov 4, 1 PM
Wed Nov 4, 2 PM
Thu Nov 5, noon