Plainbids · All housing authorities · Updated Sep 27, 2026
Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.
| Project | Development | Total cost | Spending planned |
|---|---|---|---|
| FF: ADA Tub Cutout FISH 351051 · Kitchens & baths | Long Pond Plaza 667-01 | $1,095 | — |
| SUST: ARPA TAR: Bathroom Fans Fire Alarm & Fed Pac FISH 351075 · Fire alarm & sprinklers | Long Pond Plaza 667-01 | $1,167,445 | 2026 |
| ADA Accessible Ramp Rear Entrance FISH 351076 · Windows & doors | Long Pond Plaza 667-01 | $6,025 | 2026 |
| ARPA FF: Community Building Generator FISH 351086 · Electrical & generators | Long Pond Plaza 667-01 | $59,723 | 2026 |
| ARPA FF: New Asphalt Walkways FISH 351087 · Paving, walkways & site | Long Pond Plaza 667-01 | $67,426 | 2026 |
| Roof Replacement Community Building FISH 351090 · Roofing & gutters | Long Pond Plaza 667-01 | $32,483 | 2026–2027 |
| Stairwell/Hallway Flooring Replacement 667-1 FISH 351093 · Interiors, flooring & painting | Long Pond Plaza 667-01 | $86,913 | 2026–2027 |
| Flooring Replacement 689-1 (3 Units) FISH 351094 · Interiors, flooring & painting | Visions 689-01 | $18,835 | 2026 |
| Parking Lot Replacement 667-1 FISH — · Paving, walkways & site | Long Pond Plaza 667-01 | $596,687 | — |
| Window and Exterior Door Replacement 689-1 FISH — · Windows & doors | Visions 689-01 | $137,238 | 2026–2027 |
| Paint Exterior Gas Line 689-1 FISH — · Siding, masonry & exterior | Visions 689-01 | $6,301 | 2026–2027 |
| Storage Shed Repairs and Roof Replacement 689-1 FISH — · Roofing & gutters | Visions 689-01 | $9,877 | 2026–2027 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.
Get every housing authority bid, every Monday. Free.