Plainbids · All housing authorities · Updated Sep 27, 2026

Winthrop Housing Authority

Open bids and capital projects

Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.

Open bids

None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.

Projects in its capital plan (19, $6,069,879 total cost)

This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.

ProjectDevelopmentTotal costSpending planned
2008 FF Master CFA
FISH 346042 · Other
King Gardens 667-04$4,500—
ARPA FF: Concrete curb and street repair - spend 5001 first
FISH 346112 · Paving, walkways & site
Golden Drive 667-02$391,537—
ARPA FF. FF: Waterproof Bldg Concrete Roofing
FISH 346117 · Roofing & gutters
Golden Drive 667-02$145,013—
Overlook Rear Egress
FISH 346118 · Other
Overlook Drive 667-03$620,822—
SUST-R: SHMCAP Flood Elevation Survey
FISH 346119 · Paving, walkways & site
Veterans 200-01$111,500—
ARPA Targeted Award: Fire Alarm System Upgrade
FISH 346121 · Fire alarm & sprinklers
667-01, 667-03, 689-01, 705-01$1,567,1902026
ARPA FF: Kitchen Mod 32-42 Cabinet
FISH 346122 · Kitchens & baths
Veterans 200-01$460,920—
ARPA FF: Asphalt Shingle Roofs
FISH 346123 · Roofing & gutters
Viking Gardens$429,982—
Ext Stain, Storms, bulkhead
FISH 346124 · Other
Veterans 200-01$697,1492026
Asphalt Shingle Roof
FISH 346126 · Roofing & gutters
Veterans 200-01$166,7602026
Replacement Flooring
FISH 346127 · Interiors, flooring & painting
Morton Street 689-01$55,0002026
SUST: Resiliency Feasibility Study
FISH 346128 · Paving, walkways & site
667-01, 667-04, 200-1$60,000—
Emergency Water Main Repair
FISH 346130 · Water, sewer & plumbing
Golden Drive 667-02$47,3112026
Groundwater flood drainage
FISH — · Paving, walkways & site
Veterans 200-01$70,1152028–2029
Kitchen and electrical Modern 20-32 Sunset
FISH — · Kitchens & baths
Veterans 200-01$321,6092029–2030
Roof Replacement
FISH — · Roofing & gutters
Veterans 200-01$328,5102027–2028
Boilers, Slop Sinks
FISH — · Heating, boilers & HVAC
Veterans 200-01$335,9762027–2029
Golden Drive Flat Roofs Cont'd
FISH — · Roofing & gutters
Golden Drive 667-02$196,6252027–2028
Soffits, Vinyl Repairs
FISH — · Other
Morton Street 689-01$59,3602028

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.

Get every housing authority bid, every Monday. Free.