Plainbids · All housing authorities · Updated Sep 27, 2026
Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
State fiscal year: July 2026 to June 2027. Available formula funding for the year, per the plan: $309,752. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Water Piping and Shower valve Replacement Water, sewer & plumbing · special award requested: $150,000 | John L Doherty Apts 667-2A | $572,670 |
State fiscal year: July 2027 to June 2028. Anticipated formula funding for the year, per the plan: $309,752. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Screen Door replacement Windows & doors | John L Doherty Apts 667-2A | $42,652 |
| Screen Door Replacement Windows & doors | Mary Murphy Apts. | $36,300 |
| replace mechanical room doors Windows & doors | John L Doherty Apts 667-2A | $30,027 |
| Exterior Door replacement Windows & doors | John L Doherty Apts 667-2A | $197,381 |
State fiscal year: July 2028 to June 2029. Anticipated formula funding for the year, per the plan: $309,752. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Water Pipe and Main Shut Off Replacement Phase 2 Water, sewer & plumbing | John L Doherty Apts 667-2A | $226,875 |
| Water Pipe and Main Shut Off Replacement Phase 2 Water, sewer & plumbing | John L Doherty Apts 667-2B | $75,000 |
The plan's “Years 4 and 5”: rough planning amounts, further out. State fiscal years: July 2029 to June 2031.
| Project | Development | Total project cost |
|---|---|---|
| Paving repairs, replacement Paving, walkways & site | Mary Murphy Apts. | $335,015 |
| Replace the central air conditioning unit Heating, boilers & HVAC | John L Doherty Apts 667-2A | $9,852 |
The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.
| Project | Development | Total project cost |
|---|---|---|
| ARPA FF: Roof/Fascia Bd Repair/Replace FISH 344047 | John L Doherty Apts 667- 2A | $329,553 |
| AIP: 667 Routine Turnovers FISH 344060 | $22,400 | |
| ARRA WAP new furnaces SOFT COSTS only FISH 344010 | $0 | |
| ARRA WAP new furnaces HARD COSTS only FISH 344011 | $41,340 | |
| Barrier Free Walk In Showers FISH 344037 | Mary Murphy Apts. | $28,640 |
| Replace deteriorated steps FISH 344038 | Cross Street | $9,971 |
| H&S FY20: Sidewalk Repair FISH 344039 | Mary Murphy Apts. | $9,250 |
| ARPA Targeted Award: Winchester Fed Pac Panel Upgrade FISH 344046 | Mary Murphy Apts. | $195,887 |
| Emergency Flood Repairs FISH 344048 | $0 | |
| Emergency Flood Repairs FISH 344049 | Mary Murphy Apts. | $18,019 |
| Water Pipe and Valve Replacement Phase2 FISH 344050 | Mary Murphy Apts. | $887,427 |
| Entry trim repair and paint FISH 344052 | $19,500 | |
| Resiliency Feasibility Study at 667-1 FISH 344056 | Mary Murphy Apts. | $0 |
| Resiliency Feasibility Study at 667-2A FISH 344057 | John L Doherty Apts 667- 2A | $0 |
| Resiliency Feasibility Study at 667-2B FISH 344058 | John L Doherty Apts 667- 2B | $0 |
| *Reasonable Accommodation* 51 Palmer St. Flooring and Stair Chair FISH 344059 | Palmer Street | $0 |
| Exterior & Interior Hallways Painting Mary Murphy FISH 344061 | Mary Murphy Apts. | $184,525 |
| Weather Proofing Sprinkler Areas FISH 344062 | John L Doherty Apts 667- 2A | $9,200 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.
Get every housing authority bid, every Monday. Free.