Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.
| Project | Development | Total project cost |
|---|---|---|
| Roof Replacement - Fullerton FISH 338107 | School Street | $67,746 |
| Intercom System Upgrade 667-4 FISH — | Pine Circle | $193,092 |
| Tree Work - Scatter Sites 705 FISH — | School Street | $42,350 |
| Tree Trim & Removal FISH 338109 | Pine Circle | $17,500 |
| SUST Bath & Kitchen Fan Install - 667- 4 FISH 338111 | Pine Circle | $577,833 |
| Fire System Study and Smoke/Heat Detectors FISH 338112 | $208,117 | |
| Roadway, Driveways, Parking Lot Paving FISH 338108 | $357,419 | |
| Exterior Improvements - South Ave FISH — | $134,503 | |
| Siding Replacement FISH 338110 | $1,033,791 | |
| SUST - Solar Panels 667-1 FISH 338113 | Stetson Terrace | $1,875,550 |
| AIP: 667 Routine Turnovers FISH 338100 | $16,800 | |
| Section 8 NC: Window & Siding FISH 338080 | $1,038,024 | |
| Creative Placemaking : 667-4 Outdoor Improvements FISH 338082 | Pine Circle | $248,918 |
| ARPA FF: Sewer Line & Lift Pump Study 667-1 FISH 338091 | Stetson Terrace | $632,990 |
| Underground Wiring 667-1 FISH 338093 | Stetson Terrace | $252,214 |
| Knob & Tube Replace FISH 338102 | School Street | $48,469 |
| Exterior Door Replacement FISH 338103 | School Street | $7,067 |
| Rear Deck Replacement - Bedford FISH 338104 | School Street | $34,000 |
| Garage Roof Replace - Vincent FISH 338105 | School Street | $6,585 |
| VUI Force Account - 483 South Ave (705-01-005) FISH 338106 | School Street | $45,503 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.