Weymouth Housing Authority

Open bids and capital projects

Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.

Open bids

None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.

Projects in its capital plan (17, $7,447,040 total cost)

This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.

ProjectDevelopmentTotal costSpending planned
2008 FF Master CFA
FISH 336027 · Other
Lakeview Manor 200-01$9,250—
FF: Replace Roofs - Dev Wide Phase 1
FISH 336063 · Roofing & gutters
Lakeview Manor 200-01$513,6372026
SUST: Insulation Upgrade (200-1)
FISH 336077 · Other
Lakeview Manor 200-01$361,700—
ARPA FF: Unit Entry Porch, Site, and Development Wide Masterplan (200-1)
FISH 336080 · Windows & doors
Lakeview Manor 200-01$1,180,379—
ARPA Targeted Award: Weymouth Fed Pac Panel
FISH 336084 · Electrical & generators
667-01, 667-02$995,937—
Building Facade Repair (667-3)
FISH 336086 · Siding, masonry & exterior
Pope Towers 667-03$65,736—
Master Meter Lakeview Manor Stoves DHW Heat
FISH 336087 · Heating, boilers & HVAC
Lakeview Manor 200-01$805,0002026–2028
Landscape Upgrades
FISH 336088 · Paving, walkways & site
Joseph Crehan 667-01 & 667-2$76,874—
Generator Replacement (667-3)
FISH 336089 · Electrical & generators
Pope Towers 667-03$381,2402026
Roof Replacement 667-3
FISH 336090 · Roofing & gutters
Pope Towers 667-03$695,6522026
Blower Motor & Duct Cleaning 667-3
FISH 336091 · Other
Pope Towers 667-03$10,980—
Streeetscape and Landscaping Improvements - Phase 2 (200-1)
FISH 336092 · Paving, walkways & site
Lakeview Manor 200-01$662,0082026–2027
Asphalt/concrete walkway repair/replace
FISH — · Paving, walkways & site
Lakeview Manor 200-01$345,6512029–2030
Roll-In Shower Install in ADA units - 667-3
FISH — · Kitchens & baths
Pope Towers 667-03$193,7162026
Kitchen Cabinets Pope - Phase 2 (25) units
FISH — · Kitchens & baths
Pope Towers 667-03$436,5112029–2030
Common Hallway Painting 667-3
FISH — · Interiors, flooring & painting
Pope Towers 667-03$108,2972027
Kitchen Cabinets Pope - Phase 1
FISH — · Kitchens & baths
Pope Towers 667-03$604,4722027–2029

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.