Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.
| Project | Development | Total project cost |
|---|---|---|
| Intercom System Replacement Phase 1 (2 Buildings) FISH 334057 | Greenwood Terrace | $125,840 |
| Intercom System Replacement Phase 2 (2 Buildings) FISH — | Greenwood Terrace | $125,840 |
| Intercom System Replacement Phase 3 (2 Buildings) FISH — | Greenwood Terrace | $125,840 |
| ADA Set Aside- TBD FISH 334054 | Greenwood Terrace | $5,206 |
| Vacant Unit Turnover FISH 334045 | Greenwood Terrace | $9,897 |
| Gutter Guard Installation FISH 334050 | Greenwood Terrace | $6,353 |
| Vacancy Turnover (As Needed) FISH 334051 | Greenwood Terrace | $9,775 |
| Tree Trimming FISH 334052 | Greenwood Terrace | $9,994 |
| Exterior Siding and Trim Paint FISH 334055 | Greenwood Terrace | $77,463 |
| AIP: 667 Routine Turnovers FISH 334053 | $0 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.