| Project | Development | Total cost | Spending planned |
|---|---|---|---|
| Parking lot, walkway resurface, Weston Rd site 667-3 FISH 324087 · Paving, walkways & site | River St/Weston Rd 667-03 | $191,906 | 2026–2027 |
| ADA Ramp (RA) FISH 324091 · Accessibility (ADA) | Washington Street 667-02 | $4,046 | 2026 |
| Handrail and Guardrail Replacement FISH 324100 · Other | River St/Weston Rd 667-03 | $11,092 | 2026 |
| Replace Front Entry Stairs 705-1 Set aside ARPA/Outside Lang FISH 324101 · Windows & doors | Waldo Court 705-01 | $160,080 | 2026 |
| Siding replmt Utility rms & metal doors 667-2 ARPA set aside FISH 324106 · Windows & doors | Washington Street 667-02 | $486,583 | — |
| Intercom/panel replacements 667-3 FISH 324107 · Electrical & generators | River St/Weston Rd 667-03 | $11,498 | 2026 |
| Water Heater Replacement 667-3 FISH 324112 · Heating, boilers & HVAC | River St/Weston Rd 667-03 | $78,375 | 2026 |
| Side Walk repairs 200-1 RCAT FISH 324113 · Other | Barton Road 200-01 | $98,442 | 2026 |
| Exterior Door Replacement 667-1 FISH 324114 · Windows & doors | Morton Circle 667-01 | $157,000 | 2026 |
| Kitchen Exhaust Fan 667-2 SET-ASIDE FISH 324115 · Heating, boilers & HVAC | Washington Street 667-02 | $162,938 | 2026 |
| Fence Replacement 667-3 RCAT Set-aside funds 4031 FISH 324116 · Paving, walkways & site | River St/Weston Rd 667-03 | $62,440 | 2026 |
| Tree Removal- Weston Road 667-3 RCAT FISH 324117 · Paving, walkways & site | River St/Weston Rd 667-03 | $9,104 | 2026 |
| Barton Road Roof Replacement FISH — · Roofing & gutters | Barton Road 200-01 | $184,773 | 2030 |
| Mini Ducts Main Office FISH — · Other | Barton Road 200-01 | $81,465 | 2028 |
| Tree Removal & Trimming FISH — · Paving, walkways & site | Morton Circle 667-01 | $121,648 | 2026–2027 |
| ADA Conversion 667-2 FISH — · Accessibility (ADA) | Washington Street 667-02 | $89,127 | 2027 |
| Intercom/Panel Replacement 667-2 FISH — · Electrical & generators | Washington Street 667-02 | $60,500 | 2027 |
| Common Area Flooring FISH — · Interiors, flooring & painting | River St/Weston Rd 667-03 | $118,407 | 2027 |
| River Street Paving FISH — · Paving, walkways & site | River St/Weston Rd 667-03 | $212,265 | 2029 |
| *SUST* Bath Fans River Street & Weston Road FISH — · Heating, boilers & HVAC | River St/Weston Rd 667-03 | $129,319 | 2027 |
| Exterior Painting River Street FISH — · Siding, masonry & exterior | River St/Weston Rd 667-03 | $96,044 | 2029 |
| Fire Alarm Panel Replacement FISH — · Fire alarm & sprinklers | River St/Weston Rd 667-03 | $363,000 | 2026–2027 |
| Bathroom modernization, partial FISH — · Kitchens & baths | Washington Street 667-02 | $389,716 | 2029–2030 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.