Warren Housing Authority

Open bids and capital projects

Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.

Open bids

None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.

Projects in its capital plan (16, $2,001,254 total cost)

This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.

ProjectDevelopmentTotal costSpending planned
FF: Replace parking areas & driveways
FISH 318062 · Paving, walkways & site
Winthrop Terrace 667-01$264,1052026
ARPA FF: Inspect and clean community
FISH 318083 · Other
Winthrop Terrace 667-01$3,280—
ARPA FF: Replace patio
FISH 318086 · Other
Winthrop Terrace 667-01$39,479—
ARPA FF: Replace Stairwell VCT
FISH 318089 · Other
Winthrop Terrace 667-01$54,1652026
Vacancy Preparation (Unit turnaround)
FISH 318090 · Unit turnovers & renovations
Winthrop Terrace 667-01$17,9102026
Fire Alarm Upgrade
FISH 318091 · Fire alarm & sprinklers
Winthrop Terrace 667-01$646,8372026–2027
Vacant Unit: 540 Keys Road
FISH 318092 · Unit turnovers & renovations
Keys Road 705-02$350,0002027–2028
Tub Surrounds Phase 2
FISH 318094 · Kitchens & baths
Winthrop Terrace 667-01$14,6442026
Replace Siding
FISH 318095 · Siding, masonry & exterior
Winthrop Terrace 667-01$88,8472026
VUI Turnover Unit #44B - Winthrop
FISH 318096 · Unit turnovers & renovations
Winthrop Terrace 667-01$71,0602026
AC Units
FISH — · Other
Winthrop Terrace 667-01$61,1482026–2027
Replace Siding PHASE III
FISH — · Siding, masonry & exterior
Winthrop Terrace 667-01$121,0002027
HVAC System Maintenance
FISH — · Heating, boilers & HVAC
Winthrop Terrace 667-01$20,4972026
Re-Roof Buildings #3 & 4
FISH — · Roofing & gutters
Winthrop Terrace 667-01$134,8442029–2030
Soft Wash Building Exterior
FISH — · Siding, masonry & exterior
Winthrop Terrace 667-01$22,6882027
Generator Comm. Building
FISH — · Electrical & generators
Winthrop Terrace 667-01$90,7502026–2027

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.