Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.
| Project | Development | Total cost | Spending planned |
|---|---|---|---|
| Phase I Creative Placemaking New Community Center FISH 293115 · Other | Paul Bunker 200-01 | $1,371,051 | — |
| Vacant Accessible Unit Improvements FISH 293116 · Accessibility (ADA) | Paul Bunker 200-01 | $154,618 | — |
| Asphalt paving of roadway and parking spaces FISH 293118 · Paving, walkways & site | Scattered Site 705-02 | $172,500 | 2026 |
| ARPA Targeted Award- Taunton Fire Alarm System Replacement FISH 293123 · Fire alarm & sprinklers | John Shea Court 667-03 | $2,192,590 | 2026 |
| Accessible Ramp Replacement FISH 293124 · Accessibility (ADA) | Paul Bunker 200-01 | $201,204 | — |
| Decking Replacement and Selective Structural Repairs FISH 293125 · Other | John Shea Court 667-03 | $824,106 | 2026–2027 |
| SUST Oil to ASHP Conversion FISH 293126 · Heating, boilers & HVAC | Highland Heights 200-02 | $2,629,490 | 2026 |
| Vacant unit asbestos abatement FISH 293127 · Unit turnovers & renovations | Paul Bunker 200-01 | $130,000 | — |
| Life Safety - Fire Sprinkler System Repairs FISH 293129 · Fire alarm & sprinklers | Paul Bunker 200-01 | $31,403 | — |
| Attic Ventilation Repairs FISH 293131 · Heating, boilers & HVAC | John Shea Court 667-03 | $134,100 | — |
| Site Drainage & Crawlspace Waterproofing FISH 293133 · Roofing & gutters | John Shea Court 667-03 | $265,211 | 2026 |
| Asbestos Abatement 200-1 at Turnover FISH 293134 · Unit turnovers & renovations | Paul Bunker 200-01 | $90,000 | 2028 |
| Phase Two Creative Placemaking New Community Center Project FISH 293136 · Other | Paul Bunker 200-01 | $3,076,757 | 2026–2027 |
| Vacant Unit Turnover FISH 293137 · Unit turnovers & renovations | Paul Bunker 200-01 | $60,280 | 2026 |
| Tree Removal and Trimming FISH 293139 · Paving, walkways & site | Highland Heights 200-02 | $40,860 | — |
| VU: 9 Martel #2 & 22 Chandler FISH 293140 · Other | Scattered Site 705-01 | $35,000 | 2026 |
| Boiler Replacment FISH 293142 · Heating, boilers & HVAC | Scattered Site 705-02 | $11,500 | 2026 |
| Underground Waste & Supply Line Replacement FISH — · Other | Paul Bunker 200-01 | $725,547 | 2028–2030 |
| Parking Area Repaving FISH — · Paving, walkways & site | Highland Heights 200-02 | $165,468 | 2027 |
| Roofing Replacement FISH — · Roofing & gutters | Wales Street 689-01 | $102,032 | 2026–2027 |
| Roofing Replacement FISH — · Roofing & gutters | Scattered Site 705-01 | $82,888 | 2027–2028 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.