Swampscott Housing Authority

Open bids and capital projects

Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.

Open bids

None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.

Proposed for fiscal 2027 (3 projects, $1,262,154)

State fiscal year: July 2026 to June 2027. Available formula funding for the year, per the plan: $230,446. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
Common Area Flooring
Interiors, flooring & painting
Ryan Place$46,404
Gas stove conversion project
Electrical & generators · special award requested: $361,427
Duncan Terrace$1,125,000
Bath Fan Installation
Heating, boilers & HVAC · special award requested: $90,750
Duncan Terrace$90,750

Proposed for fiscal 2028 (1 project, $180,738)

State fiscal year: July 2027 to June 2028. Anticipated formula funding for the year, per the plan: $230,446. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
Repave Driveway
Paving, walkways & site
Ryan Place$180,738

Proposed for fiscal 2029 (2 projects, $192,909)

State fiscal year: July 2028 to June 2029. Anticipated formula funding for the year, per the plan: $230,446. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
Gutter/Downspout Replacements
Roofing & gutters
Duncan Terrace$93,440
Replace Walkways
Paving, walkways & site
Duncan Terrace$99,469

Further out: fiscal 2030–2031 (2 projects, $427,024)

The plan's “Years 4 and 5”: rough planning amounts, further out. State fiscal years: July 2029 to June 2031.

ProjectDevelopmentTotal project cost
Doherty Circle Roof Replacement
Roofing & gutters
Doherty Circle$200,000
Fire Alarm Upgrades
Fire alarm & sprinklers
Duncan Terrace$227,024

Active projects (12)

The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.

ProjectDevelopmentTotal project cost
AIP: 667 Routine Turnovers
FISH 291078
$16,800
CR Request Handicap Ramp
FISH 291067
Duncan Terrace$2,495
ADA Office Ramp
FISH 291068
Duncan Terrace$71,878
ARPA Targeted Award: Swampscott Fire Panel Replacement
FISH 291069
Duncan Terrace$827,646
Storm Door Replacement
FISH 291072
Duncan Terrace$99,094
Window Replacement
FISH 291074
Doherty Circle$114,797
Kitchen and Bathroom Upgrades
FISH 291075
Ryan Place$128,574
Vacancy Renovation
FISH 291077
Doherty Circle$119,379
Asphalt Parking lot Upgrades
FISH 291081
M. Kelly Vet and Family Housing$99,680
Barrier Free Shower
FISH 291083
Duncan Terrace$109,322
Vacancy Renovation
FISH 291084
M. Kelly Vet and Family Housing$122,300
Bulkhead replacement
FISH 291085
M. Kelly Vet and Family Housing$123,400

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.