Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
State fiscal year: July 2027 to June 2028. Anticipated formula funding for the year, per the plan: $130,121. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| SUST-Replace timbers and add trees Paving, walkways & site | Heaton Court | $57,572 |
| Exterior Trim Replacement-LHA Siding, masonry & exterior | Heaton Court | $11,606 |
State fiscal year: July 2028 to June 2029. Anticipated formula funding for the year, per the plan: $130,121. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Bathroom Renovation-B Kitchens & baths | Stockbridge House | $42,112 |
| Unit A Kitchen Counters and Cabinets Kitchens & baths | Stockbridge House | $22,688 |
| Install Concrete Pads Buildings D & F Rear Other | Heaton Court | $60,133 |
The plan's “Years 4 and 5”: rough planning amounts, further out. State fiscal years: July 2029 to June 2031.
| Project | Development | Total project cost |
|---|---|---|
| Bridge Replacement E & F Buildings Other | Heaton Court | $26,792 |
| Replace exterior stair treads Siding, masonry & exterior | Heaton Court | $95,502 |
| Deck replacement Phase 1 Siding, masonry & exterior | Heaton Court | $93,990 |
| 689 Bathroom Renovations Half Bath Unit-A Kitchens & baths | Stockbridge House | $42,210 |
The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.
| Project | Development | Total project cost |
|---|---|---|
| ARPA FF: Gutter and Downspout Inst FISH 283104 | $9,765 | |
| ARPA FF: Bathroom Reno. FISH 283105 | Stockbridge House | $127,007 |
| AIP: 667 Routine Turnovers FISH 283122 | $10,200 | |
| 667-Heaton-replace storm doors (phase 1 front doors) FISH 283089 | Heaton Court | $43,296 |
| Parking lot, walkway resurfacing; site lighting upgrade FISH 283094 | Heaton Court | $192,918 |
| Replace exterior doors adding access switches FISH 283102 | Stockbridge House | $45,850 |
| ARPA Targeted Award-Stockbridge Fire Alarm Upgrade FISH 283103 | Heaton Court | $2,924 |
| Tub Cut Out- Accommodation F13 A23 FISH 283116 | Heaton Court | $3,045 |
| Remove and Replace Exterior Fire Extinguisher Boxes FISH 283117 | Heaton Court | $9,514 |
| Maintenance Door Replacement FISH 283118 | Heaton Court | $0 |
| Install concrete pads Building E Rear FISH 283119 | Heaton Court | $39,544 |
| Deck improvements FISH 283120 | Stockbridge House | $6,590 |
| RA-Floor Replacement FISH 283121 | Heaton Court | $5,294 |
| Unit C24 RA-Accommodations FISH 283123 | Heaton Court | $9,106 |
| VUI-Heaton Court Turnovers-FA FISH 283124 | Heaton Court | $72,369 |
| Install Exterior Lighting FISH 283125 | Heaton Court | $40,605 |
| 667-Heaton-Storm door replacement (phase 2 rear doors) FISH 283126 | Heaton Court | $47,742 |
| Replace kitchen stoves FISH 283127 | Heaton Court | $16,785 |
| Install tilt in windows to third floor units FISH 283128 | Heaton Court | $40,949 |
| Remove Carpet-RA request FISH 283129 | Heaton Court | $10,053 |
| Replace damaged siding and paint - CPA 2023 phase 3 FISH 283130 | Heaton Court | $0 |
| Exterior Walkway and Bridge Upgrade FISH 283131 | Heaton Court | $0 |
| Rebuild exterior site components FISH 283132 | Stockbridge House | $9,048 |
| VUI-C 21 Renovation-FA FISH 283133 | Heaton Court | $42,500 |
| Vacant unit - Force Account FISH 283134 | Heaton Court | $53,447 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.