Plainbids · All housing authorities · Updated Sep 27, 2026
Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.
| Project | Development | Total cost | Spending planned |
|---|---|---|---|
| 2008 FF Master CFA FISH 282015 · Other | Sholan Terrace 667-01 | $9,251 | — |
| SUST FY22 - Air Sealing and Insulation FISH 282040 · Other | Sholan Terrace 667-01 | $392,608 | — |
| Site Improvements FISH 282041 · Paving, walkways & site | Sholan Terrace 667-01 | $12,264 | 2026 |
| ARPA Targeted Award: Fed Pacific Panel Rplmt 667-1 FISH 282042 · Electrical & generators | Sholan Terrace 667-01 | $91,687 | — |
| Site Improvements FISH 282043 · Paving, walkways & site | Sholan Terrace 667-01 | $9,983 | 2026 |
| Septic Repairs FISH 282044 · Water, sewer & plumbing | Sholan Terrace 667-01 | $13,500 | 2026 |
| Window Replacement Ph 1 FISH 282045 · Windows & doors | Sholan Terrace 667-01 | $44,555 | — |
| Site Improvements FISH 282046 · Paving, walkways & site | Sholan Terrace 667-01 | $8,000 | 2026 |
| Smoke Detector Replacement FISH 282047 · Fire alarm & sprinklers | Sholan Terrace 667-01 | $9,888 | 2026 |
| Outdoor Spigot Replacement FISH 282048 · Siding, masonry & exterior | Sholan Terrace 667-01 | $9,075 | 2026 |
| Entry Repairs Building H FISH 282049 · Windows & doors | Sholan Terrace 667-01 | $34,788 | 2026–2027 |
| Component Replacement FISH — · Other | Sholan Terrace 667-01 | $9,881 | 2026 |
| Window Replacement Ph 2 FISH — · Windows & doors | Sholan Terrace 667-01 | $37,133 | 2026 |
| Window Replacement Ph 3 FISH — · Windows & doors | Sholan Terrace 667-01 | $41,383 | 2027 |
| Exterior lighting and pole light upgrades FISH — · Electrical & generators | Sholan Terrace 667-01 | $9,831 | 2026 |
| Hot Water Tank Replacement Ph 1 FISH — · Heating, boilers & HVAC | Sholan Terrace 667-01 | $9,996 | 2026 |
| Window Replacement Ph 4 FISH — · Windows & doors | Sholan Terrace 667-01 | $44,830 | 2028 |
| Window Replacement Ph 5 FISH — · Windows & doors | Sholan Terrace 667-01 | $45,013 | 2029 |
| Drainage Improvements FISH — · Paving, walkways & site | Sholan Terrace 667-01 | $42,350 | 2028 |
| Window Replacement Ph 6 FISH — · Windows & doors | Sholan Terrace 667-01 | $44,366 | 2030 |
| Hot Water Heater Replacement Ph 2 FISH — · Heating, boilers & HVAC | Sholan Terrace 667-01 | $9,881 | 2028 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.
Get every housing authority bid, every Monday. Free.