Somerville Housing Authority

Open bids and capital projects

Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.

Open bids (2)

Projects in its capital plan (20, $25,891,155 total cost)

This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.

ProjectDevelopmentTotal costSpending planned
PEHO Grant 200-1 Clarendon
FISH 274112 · Other
Clarendon Hill 200-01$21,077,0442028–2030
OR Boiler Replacements 200-2
FISH 274130 · Heating, boilers & HVAC
Mystic River 200-02$64,238—
ARPA FF: Buildg Envel-Concrete Repairs Phase 1 200-2
FISH 274134 · Other
Mystic River 200-02$278,0492026
Roof Replacement Phase 4 200-2
FISH 274136 · Roofing & gutters
Mystic River 200-02$229,5562026
ARPA FF: Site Improv-Concrete Walkways - Phase 2 200-2
FISH 274137 · Paving, walkways & site
Mystic River 200-02$507,0662026
Kitchen Rehab 689-1 Force Account
FISH 274138 · Kitchens & baths
Prospect House 689-01$38,1302026
Bump out Concrete Repairs Phase 2 200-2
FISH 274144 · Other
Mystic River 200-02$341,5952026
ARPA FF: Interior Apt - Rear Door Rplcmt 667-2
FISH 274146 · Windows & doors
Corbett Apartments 667-02$273,626—
Entryway Doors
FISH 274147 · Windows & doors
Prospect House 689-01$7,4182026
PEHO Project Relocations Clarendon Hill Apartments
FISH 274155 · Other
Clarendon Hill 200-01$250,0002026–2027
Decarbonization Feasibility Study - SUST
FISH 274156 · Studies & design
Mystic River 200-02$91,090—
Roof Replacement Phase 6 200-2
FISH 274167 · Roofing & gutters
Mystic River 200-02$336,6002026
Phase 4 Kitchen Modernization Force Account
FISH 274168 · Kitchens & baths
Corbett Apartments 667-02$123,5472026–2027
Concrete Stairs Replacement 667-2
FISH 274169 · Siding, masonry & exterior
Corbett Apartments 667-02$470,4052026–2027
Prospect House Boiler Replacement
FISH 274170 · Heating, boilers & HVAC
Prospect House 689-01$17,0592026
Buiding envelope Concrete Repairs Phase 3
FISH 274172 · Siding, masonry & exterior
Mystic River 200-02$263,8572026–2027
Roof Replacement Mystic River - Phase 7
FISH 274173 · Roofing & gutters
Mystic River 200-02$471,5002026–2027
Site Improvements Concrete Walkways Phase 3
FISH — · Paving, walkways & site
Mystic River 200-02$260,4012026–2027
Parking Lot Resurface - Mystic River
FISH — · Paving, walkways & site
Mystic River 200-02$756,2502027–2029
First Floor Bathroom Rehab
FISH — · Kitchens & baths
Prospect House 689-01$33,7242027

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.