Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.
| Project | Development | Total cost | Spending planned |
|---|---|---|---|
| PEHO Grant 200-1 Clarendon FISH 274112 · Other | Clarendon Hill 200-01 | $21,077,044 | 2028–2030 |
| OR Boiler Replacements 200-2 FISH 274130 · Heating, boilers & HVAC | Mystic River 200-02 | $64,238 | — |
| ARPA FF: Buildg Envel-Concrete Repairs Phase 1 200-2 FISH 274134 · Other | Mystic River 200-02 | $278,049 | 2026 |
| Roof Replacement Phase 4 200-2 FISH 274136 · Roofing & gutters | Mystic River 200-02 | $229,556 | 2026 |
| ARPA FF: Site Improv-Concrete Walkways - Phase 2 200-2 FISH 274137 · Paving, walkways & site | Mystic River 200-02 | $507,066 | 2026 |
| Kitchen Rehab 689-1 Force Account FISH 274138 · Kitchens & baths | Prospect House 689-01 | $38,130 | 2026 |
| Bump out Concrete Repairs Phase 2 200-2 FISH 274144 · Other | Mystic River 200-02 | $341,595 | 2026 |
| ARPA FF: Interior Apt - Rear Door Rplcmt 667-2 FISH 274146 · Windows & doors | Corbett Apartments 667-02 | $273,626 | — |
| Entryway Doors FISH 274147 · Windows & doors | Prospect House 689-01 | $7,418 | 2026 |
| PEHO Project Relocations Clarendon Hill Apartments FISH 274155 · Other | Clarendon Hill 200-01 | $250,000 | 2026–2027 |
| Decarbonization Feasibility Study - SUST FISH 274156 · Studies & design | Mystic River 200-02 | $91,090 | — |
| Roof Replacement Phase 6 200-2 FISH 274167 · Roofing & gutters | Mystic River 200-02 | $336,600 | 2026 |
| Phase 4 Kitchen Modernization Force Account FISH 274168 · Kitchens & baths | Corbett Apartments 667-02 | $123,547 | 2026–2027 |
| Concrete Stairs Replacement 667-2 FISH 274169 · Siding, masonry & exterior | Corbett Apartments 667-02 | $470,405 | 2026–2027 |
| Prospect House Boiler Replacement FISH 274170 · Heating, boilers & HVAC | Prospect House 689-01 | $17,059 | 2026 |
| Buiding envelope Concrete Repairs Phase 3 FISH 274172 · Siding, masonry & exterior | Mystic River 200-02 | $263,857 | 2026–2027 |
| Roof Replacement Mystic River - Phase 7 FISH 274173 · Roofing & gutters | Mystic River 200-02 | $471,500 | 2026–2027 |
| Site Improvements Concrete Walkways Phase 3 FISH — · Paving, walkways & site | Mystic River 200-02 | $260,401 | 2026–2027 |
| Parking Lot Resurface - Mystic River FISH — · Paving, walkways & site | Mystic River 200-02 | $756,250 | 2027–2029 |
| First Floor Bathroom Rehab FISH — · Kitchens & baths | Prospect House 689-01 | $33,724 | 2027 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.