Plainbids · All housing authorities · Updated Sep 27, 2026

Seekonk Housing Authority

Open bids and capital projects

Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.

Open bids

None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.

Active projects (15)

The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.

ProjectDevelopmentTotal project cost
Intercom System Replacement
FISH 265071
Seekonk Common$245,656
Site Lighting
FISH —
Seekonk Common$56,265
Building Envelope Improvements
FISH —
Seekonk Common$163,740
Siding Replacement- School St. 705- 1A
FISH 265070
Scattered Site-Metropolitan Ave and School St.$101,862
Siding Chappell 705-1C
FISH —
Scattered Site- 35-37 Chappell St$85,530
Siding Ellis 705-1B
FISH —
Scattered Site- 40-42 Ellis St$85,530
APRA FF: Chappell St. #19 handicap ramps
FISH 265072
Seekonk Common$26,941
AIP: 667 Routine Turnovers
FISH 265067
$14,400
Vacant Unit Turnover 667-1
FISH 265049
Seekonk Common$16,600
Septic System Repairs 667-1 ER
FISH 265059
Seekonk Common$135,684
Replace Flooring vacancies 667-1
FISH 265061
Seekonk Common$22,000
Fire Alarm Device Replacement 705- 1A, B, & C
FISH 265064
Scattered Site-Metropolitan Ave and School St.$6,051
Bathroom Renovations 705-1A Meropolitan and School
FISH 265066
Scattered Site-Metropolitan Ave and School St.$98,976
Bathroom Renovations 705-1B&C Ellis & Chappell
FISH 265068
Scattered Site- 40-42 Ellis St$96,050
Siding Replacement- Metropolitan 705-1A
FISH 265069
Scattered Site-Metropolitan Ave and School St.$115,564

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.

Get every housing authority bid, every Monday. Free.