Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
State fiscal year: July 2026 to June 2027. Available formula funding for the year, per the plan: $317,383. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Walkways & Parking Wheeler Park 667-2, 667-3 Paving, walkways & site | $437,002 | |
| Exterior Trim Repair & Paint 667- 2 &3 - Merged Siding, masonry & exterior | $271,309 | |
| EMG Septic Pumps and Floats 667-1 Water, sewer & plumbing · special award requested: $32,004 | Lincoln Park | $32,004 |
State fiscal year: July 2027 to June 2028. Anticipated formula funding for the year, per the plan: $317,383. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Lincoln Park Window Replacement Windows & doors | Lincoln Park | $491,139 |
State fiscal year: July 2028 to June 2029. Anticipated formula funding for the year, per the plan: $317,383. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Generator Replacement 667-1 Electrical & generators | Lincoln Park | $154,502 |
| Generator Replacement - 667-2 Electrical & generators | Wheeler Park I | $154,502 |
| Generator Replacement 667-3 Electrical & generators | Wheeler Park II | $154,502 |
The plan's “Years 4 and 5”: rough planning amounts, further out. State fiscal years: July 2029 to June 2031.
| Project | Development | Total project cost |
|---|---|---|
| Exterior Door Replacement (667- 3) Windows & doors | Wheeler Park II | $164,929 |
| Walkways & Parking 667-1 Paving, walkways & site | Lincoln Park | $204,118 |
| Exterior Door Replacement WP1 Windows & doors | Wheeler Park I | $87,498 |
The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.
| Project | Development | Total project cost |
|---|---|---|
| ARPA FF: Select Tub to shower conversions 667-1, 667-2, 667-3 FISH 264076 | Lincoln Park | $350,892 |
| AIP: 667 Routine Turnovers FISH 264094 | $31,600 | |
| Site Improvements/Parking 667-1 FISH 264097 | Lincoln Park | $12,100 |
| Shut Off Valve Rplmt and Gas 2 Elect Stove Rplmt 667-1,-2,-3 FISH 264072 | Lincoln Park | $478,763 |
| Balcony Repair Bldg F - 667-1 FISH 264086 | Lincoln Park | $82,944 |
| Shed Repairs FISH 264089 | Wheeler Park I | $49,544 |
| Fire Alarm Study 667-2 & 667-3 FISH 264091 | Wheeler Park I | $41,306 |
| ADA Tub Replacement 689-1 CR FISH 264093 | Curt Merritt Bldg | $134,269 |
| Vacant Unit Initiative (VUI) - Force Account FISH 264095 | Wheeler Park I | $100,000 |
| Stairwell Landing Flooring FISH 264064 | Lincoln Park | $349,910 |
| Tree Removal and Trimming 667-1 FISH 264096 | Lincoln Park | $32,874 |
| Site Improvements/Parking WP1 - 667-2 FISH 264099 | Wheeler Park I | $12,100 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.