Plainbids · All housing authorities · Updated Sep 27, 2026
Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
State fiscal year: July 2026 to June 2027. Available formula funding for the year, per the plan: $130,407. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Common Area Flooring Replacement BLDG. B Interiors, flooring & painting | Hansen Village | $40,432 |
| Rubber Stair Tread Replacement 667-1 Siding, masonry & exterior | Hansen Village | $46,905 |
| Fire Alarm Compliance Upgrades 667-1 Fire alarm & sprinklers | Hansen Village | $11,410 |
| GFW Storm Water System Cleaning Other | Family Housing | $8,755 |
State fiscal year: July 2027 to June 2028. Anticipated formula funding for the year, per the plan: $130,407. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Deck/Balcony Painting Siding, masonry & exterior | Hansen Village | $82,762 |
| Dumpster Enclosure Upgrades Other | Hansen Village | $19,226 |
State fiscal year: July 2028 to June 2029. Anticipated formula funding for the year, per the plan: $130,407. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Exterior Door Replacement 705-1 Windows & doors | Family Housing | $147,318 |
| Bathroom Renovation 689-1 BLDG. C Kitchens & baths | Hansen Village Special Needs (DDS) | $50,947 |
| Parking Lot Paving 689-1 Paving, walkways & site | Hansen Village Special Needs (DDS) | $231,087 |
| Bathroom Exhaust Fans 667- 1/705-1 Heating, boilers & HVAC | $136,125 |
The plan's “Years 4 and 5”: rough planning amounts, further out. State fiscal years: July 2029 to June 2031.
| Project | Development | Total project cost |
|---|---|---|
| Replace Exterior Unit Doors Windows & doors | Hansen Village | $176,938 |
| Building Envelope Upgrade 667-1 Siding, masonry & exterior | Hansen Village | $1,149,149 |
| Stormwater Drainage Upgrades 705-1 Paving, walkways & site | Family Housing | $182,121 |
| 23 Tom's WAY - Kitchen Renovation Kitchens & baths | Hansen Village Special Needs (DMH) | $46,712 |
| 23 Tom's Way Exterior Lighting Replacement Electrical & generators | Hansen Village Special Needs (DMH) | $59,319 |
| 23 Tom's Way Auto Doors Windows & doors | Hansen Village Special Needs (DMH) | $64,782 |
| 23 Tom's Way Bathroom Renovation Kitchens & baths | Hansen Village Special Needs (DMH) | $24,905 |
The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.
| Project | Development | Total project cost |
|---|---|---|
| AIP: 667 Routine Turnovers FISH 261062 | $0 | |
| Bathroom Fan Replacement Phase 1 FISH 261049 | Hansen Village | $7,919 |
| Selective Grab Bar Replacement FISH 261050 | Hansen Village | $0 |
| Dumpster Enclosure FISH 261058 | Family Housing | $14,697 |
| DCAMM Waiver: EMG Sink Hole/Septic Repair (GFW) FISH 261060 | Family Housing | $441,261 |
| Roof Replacement, Bldg B & Roof Down Spout Drainage FISH 261061 | Hansen Village Special Needs (DMH) | $275,490 |
| ADA Bathroom Renovation BLDG. C FISH 261064 | Hansen Village Special Needs (DDS) | $78,250 |
| Asphalt Way Replacement BLDG. C FISH 261065 | Hansen Village Special Needs (DDS) | $37,436 |
| Replace Shed Doors 705-1 FISH 261066 | Family Housing | $65,500 |
| Automatic Door Operator Repairs 667-1/167-1 FISH 261067 | Hansen Village | $13,035 |
| Fire Access Road Regrading 667-1 FISH 261068 | Hansen Village | $14,977 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.