Plainbids · All housing authorities · Updated Sep 27, 2026

Salem Housing Authority

Open bids and capital projects

Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.

Open bids

None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.

Proposed for fiscal 2027 (5 projects, $5,904,238)

State fiscal year: July 2026 to June 2027. Available formula funding for the year, per the plan: $902,015. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
Roof Replacement
Roofing & gutters
Garden Terrace$431,533
84 + 88 Essex Street - Exterior Painting
Siding, masonry & exterior
Phillips (new 705-4)$100,079
Windows, balcony & building envelope
Windows & doors · special award requested: $2,700,000
Charter Street$2,765,440
Rainbow Terrace Paving - Development wide
Paving, walkways & site
Rainbow Terrace$2,515,377
Hot water systems replacement
Heating, boilers & HVAC
Phillips (new 705-4)$91,809

Proposed for fiscal 2028 (5 projects, $936,116)

State fiscal year: July 2027 to June 2028. Anticipated formula funding for the year, per the plan: $902,015. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
45 St. Peter Street - common area carpet replacement
Interiors, flooring & painting
Morency Manor$596,560
New Locks and Entry system - Yale Accentra
Windows & doors
Dalton Residence$111,925
New Locks Development wide - Yale Accentra Locks
Security & access
Dalton Residence$65,038
Ruane - Lock replacement
Security & access
Ruane Building-Congregate$34,031
Colonial Terr Locks and Mailbox Replacements
Security & access
Colonial Terrace$128,562

Proposed for fiscal 2029 (1 project, $899,318)

State fiscal year: July 2028 to June 2029. Anticipated formula funding for the year, per the plan: $902,015. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
Kitchen and bathroom modernization
Kitchens & baths
Bertram Terrace$899,318

Further out: fiscal 2030–2031 (3 projects, $2,476,027)

The plan's “Years 4 and 5”: rough planning amounts, further out. State fiscal years: July 2029 to June 2031.

ProjectDevelopmentTotal project cost
Kitchen modernization
Kitchens & baths
Colonial Terrace$854,144
Bathroom modernization
Kitchens & baths
Colonial Terrace$945,836
Pioneer Terrace Bathroom Ventilation Upgrade
Heating, boilers & HVAC
Pioneer Terrace$676,047

Active projects (15)

The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.

ProjectDevelopmentTotal project cost
Door replacement: 667-3A, 667-7B, 667-3B, 705-2A
FISH 258182
Bates Terrace$151,551
ARPA FF: Decking, stairs, railings
FISH 258184
Ruane Building-Congregate$20,000
ARPA FF: Selective siding replacement
FISH 258187
Farrell Court$327,119
Electrical Upgrades
FISH 258150
Pioneer Terrace$1,334,136
ARPA FF: Pioneer Terrace - site work and concrete stair repair
FISH 258167
Pioneer Terrace$479,800
SUST Oil to heat pump conversion
FISH 258171
26 Prince St. /33 Park St.$2,160,000
HILAPP: Exterior Upgrades (Water Infiltration) Charter St.
FISH 258173
Charter Street$590,416
ARPA TAR: Meter: Fed Pac Panel, Fire Alarm Syst, Stove Replacement
FISH 258188
Rainbow Terrace$2,911,924
ARPA FF: Walk-in Shower
FISH 258189
Morency Manor$841,393
Elevator Repairs
FISH 258194
Morency Manor$229,440
Colonial Terr - site work and concrete stair repair
FISH 258197
Colonial Terrace$210,600
Sustainability Study - Flood Zone - Rising Sea Level Chapter 667-4 and 705-2B
FISH 258198
Pioneer Terrace$25,000
Ruane - Roof replacement
FISH 258199
Ruane Building-Congregate$127,000
27 Charter Street Window Replacement Project
FISH 258202
Charter Street$46,900
AIP: 667 Routine Turnovers (258201)
FISH 258203
Colonial Terrace$92,600

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.