Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
State fiscal year: July 2026 to June 2027. Available formula funding for the year, per the plan: $124,838. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Parking lot pavement and selective walkway replacement Paving, walkways & site · special award requested: $63,674 | Oakland/Waverly | $63,674 |
| 667-1 Water Heater Replacement Heating, boilers & HVAC | Tannerville 1 | $34,031 |
| 667-2 Water Heater Replacement Heating, boilers & HVAC | Tannerville 2 | $28,738 |
| Bathroom Rehabs at 689-1 Kitchens & baths | Bancroft | $68,059 |
State fiscal year: July 2027 to June 2028. Anticipated formula funding for the year, per the plan: $124,838. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Replace Balcony Screens_Bldgs 4- 17 Siding, masonry & exterior | Tannerville 1 | $4,500 |
| Replace Balcony Screens_Bldgs 29-37 Siding, masonry & exterior | Tannerville 2 | $4,500 |
| Common area flooring replacement Interiors, flooring & painting | Bancroft | $14,771 |
| Exterior Lighting/Smoke detector upgrades Fire alarm & sprinklers | Bancroft | $15,125 |
State fiscal year: July 2028 to June 2029. Anticipated formula funding for the year, per the plan: $124,838. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| new shed Other | Tannerville 1 | $20,328 |
| 3rd floor unit upgrades Interiors, flooring & painting | Bancroft | $75,625 |
The plan's “Years 4 and 5”: rough planning amounts, further out. State fiscal years: July 2029 to June 2031.
| Project | Development | Total project cost |
|---|---|---|
| Standby Generator Installation Electrical & generators | Tannerville 1 | $68,062 |
| Replace Transformer - 667-01 FTD Other | Tannerville 1 | $86,929 |
| Replace Transformer - 667-02 FTD Other | Tannerville 2 | $88,179 |
| 667-1 and 667-2 Acoustic Insulation Dev-Wide Other | Tannerville 1 | $120,000 |
The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.
| Project | Development | Total project cost |
|---|---|---|
| AIP: 667 Routine Turnovers FISH 246089 | $16,000 | |
| Strip and Re-Wax Hallway Floors Dev- Wide FISH 246075 | Tannerville 1 | $6,627 |
| Replace the drafty basement windows FISH 246076 | Bancroft | $2,744 |
| ARPA FF: New Bathroom and Common Hallway Lighting FISH 246078 | Tannerville 1 | $46,397 |
| Force Account Install Thermostats Dev wide. 667-1 & 667-2 FISH 246084 | Tannerville 1 | $11,344 |
| Tree Trimming dev wide 667-1 and 667-2 FISH 246087 | Tannerville 1 | $12,479 |
| SUST: Whole House Heat Pump Bancroft FISH 246088 | Bancroft | $442,121 |
| Water tank replacement FISH 246090 | Oakland/Waverly | $36,412 |
| New Vinyl Siding FISH 246091 | Parker/Pleasant | $97,100 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.