Plainbids · All housing authorities · Updated Sep 27, 2026
Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.
| Project | Development | Total cost | Spending planned |
|---|---|---|---|
| 2008 FF Master CFA FISH 244028 · Other | Walter Lyon 667-01 | $2,223 | — |
| Windows Replacement Phase 1 667-1 FISH 244068 · Windows & doors | Walter Lyon 667-01 | $5,500 | — |
| ARPA FF: Driveway Repairs,Resurfacing 667-3 Sidewalks 667-1 244086 FISH 244085 · Paving, walkways & site | McCauley Murray Lewis 667-03 | $626,170 | 2026 |
| Roofing System Replacement 667-1 FISH 244087 · Roofing & gutters | Walter Lyon 667-01 | $531,483 | 2026 |
| Extra-Ordinary Maintenance Doors FISH 244090 · Windows & doors | Fencourt 689-01 | $22,118 | 2026 |
| M_Meter: Electrification Conversion - 667-2 FISH 244091 · Electrical & generators | George Welch (Sunshine) 667-02 | $913,540 | 2026–2027 |
| Select Interior upgrades 689-1 FISH 244092 · Interiors, flooring & painting | Fencourt 689-01 | $20,424 | 2026 |
| Replace Exterior Doors and Rotten Thresholds FISH 244093 · Windows & doors | George Welch (Sunshine) 667-02 | $64,116 | 2026–2027 |
| Replace Round Doorknobs to Lever Locksets FISH 244094 · Other | McCauley Murray Lewis 667-03 | $165,617 | 2026–2027 |
| Interior Automatic Door Openers FISH 244095 · Windows & doors | McCauley Murray Lewis 667-03 | $160,823 | 2026–2027 |
| Common Hallway Flooring Replacement FISH 244096 · Interiors, flooring & painting | McCauley Murray Lewis 667-03 | $330,320 | 2026–2027 |
| Kitchen Mordernization FISH — · Kitchens & baths | Walter Lyon 667-01 | $1,327,831 | 2030 |
| Site Wall Replacement - Community Bldg. FISH — · Other | George Welch (Sunshine) 667-02 | $19,663 | 2026 |
| Replace Cold Water Pipes FISH — · Water, sewer & plumbing | McCauley Murray Lewis 667-03 | $134,765 | 2028 |
| Elevator Upgrade (Elevator #1) FISH — · Elevators | McCauley Murray Lewis 667-03 | $3,457,860 | 2030 |
| Replace Fire Exit & Main Entry Doors FISH — · Windows & doors | McCauley Murray Lewis 667-03 | $89,843 | 2026 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.
Get every housing authority bid, every Monday. Free.