Pittsfield Housing Authority

Open bids and capital projects

Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.

Open bids

None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.

Proposed for fiscal 2027 (8 projects, $466,821)

State fiscal year: July 2026 to June 2027. Available formula funding for the year, per the plan: $752,551. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
Exterior Lighting Upgrades- Women's Shelter
Electrical & generators
Women's Shelter$19,819
Vacant Unit Rehab for 18 Units Multiple Developments - task force
Unit turnovers & renovations
$364,782
Retaining Walls Rehabilitation- Wahconah
Paving, walkways & site
Wahconah Heights$19,031
ADA Ramp, Stairs, Porch Post and Railings Rehabilitation-Women's Shelter
Siding, masonry & exterior
Women's Shelter$31,114
Wilson Park Unit Lead Abatement & Providence Boiler System Improvements
Heating, boilers & HVAC
Wilson Park$25,775
Stair and Deck Structural Certification - 29 Pecks Road
Siding, masonry & exterior
Pecks Road$1,400
Stair and Deck Structural Certification - Elm House
Siding, masonry & exterior
Elm House$1,400
ADA Ramp, Stairs and Railings Structural Certification - Women's Shelter
Siding, masonry & exterior
Women's Shelter$3,500

Proposed for fiscal 2028 (10 projects, $1,004,211)

State fiscal year: July 2027 to June 2028. Anticipated formula funding for the year, per the plan: $752,551. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
Paving Parking Lot & Walkway - Francis Plaza
Paving, walkways & site
Francis Plaza$217,912
Paving Driveways Rehabilitation- Christopher A
Paving, walkways & site
Christopher Arms$149,972
Site Drainage and ADA Ramp Improvements-Christopher A
Paving, walkways & site
Christopher Arms$68,244
Paving Driveway and Parking Lot Rehabilitation-Elm H
Paving, walkways & site
Elm House$65,498
Paving Driveway and Parking spots Rehabilitation-Elm St
Paving, walkways & site
275-277 Elm Street$31,953
Paving Parking Lot Rehabilitation- Pecks Rd
Paving, walkways & site
Pecks Road$58,995
Paving and Walkways Rehabilitation-Providence Ct
Paving, walkways & site
Providence Court$150,000
Paving Rehabilitation-Roberts St
Paving, walkways & site
Roberts Street$31,636
Paving Rehabilitation-Wilson Prk
Paving, walkways & site
Wilson Park$163,516
Paving Rehabilitation-Women's Shelter
Paving, walkways & site
Women's Shelter$66,484

Proposed for fiscal 2029 (5 projects, $715,728)

State fiscal year: July 2028 to June 2029. Anticipated formula funding for the year, per the plan: $752,551. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
Exterior Wood Stairs and Stoops Rehabilitation-Christopher A
Siding, masonry & exterior
Christopher Arms$144,352
ADA Ramp and Rear Wood Stairs Rehabilitation-Elm H
Siding, masonry & exterior
Elm House$47,036
Masonry Repointing-Providence Ct
Siding, masonry & exterior
Providence Court$158,480
Roof Replacements-McGill Ct
Roofing & gutters
McGill Court$290,860
Roof and Gutter System Replacement-Meadowview
Roofing & gutters
Meadowview Drive$75,000

Further out: fiscal 2030–2031 (2 projects, $110,900)

The plan's “Years 4 and 5”: rough planning amounts, further out. State fiscal years: July 2029 to June 2031.

ProjectDevelopmentTotal project cost
Building Envelope Rehabilitation- Atlantic Av
Siding, masonry & exterior
13 Atlantic Avenue$64,088
Exterior Painting - Peck Road - Building
Siding, masonry & exterior
Pecks Road$46,812

Active projects (15)

The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.

ProjectDevelopmentTotal project cost
ARPA FF: Outdoor Stair Replacement
FISH 236090
Wilson Park$569,843
AIP: 667 Routine Turnovers
FISH 236108
$10,000
Site upgrades Rose Manor - Phase 1
FISH 236089
Rose Manor$815,387
Roof Replacement - c. 200-1, 689-3 & 705-2A
FISH 236094
Wilson Park$79,903
Replace Windows 689-01
FISH 236096
Elm House$195,600
VUI Replace Roof and Siding 26 Essex St
FISH 236097
26 Essex$117,211
Install & Repair Fire Doors- Phase 1
FISH 236099
Providence Court$163,346
Install & Repair Fire Doors - Phase 2
FISH 236101
Francis Plaza$200,825
Christopher Arms Vacant Unit Turnover
FISH 236103
Christopher Arms$1,126,341
Driveway and Parking Lot Repair
FISH 236105
Wahconah Heights$93,500
Driveway Replacement
FISH 236106
Third Street$27,590
Replace Retaining Wall - Christopher Arms
FISH 236107
$29,200
Vacant Unit - Force Accounts
FISH 236109
Wilson Park$325,000
Rose Manor Vacant Unit Turnover
FISH 236110
Rose Manor$1,077,575
ASHP - Emergency Replacement
FISH 236111
Providence Court$17,394

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.