Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.

Open bids

None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.

Proposed for fiscal 2028 (2 projects, $242,916)

State fiscal year: July 2027 to June 2028. Anticipated formula funding for the year, per the plan: $242,380. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
Building Identification Signage 667-1 and 667-2
Other
Tonset Woods - 667-1$17,152
Front Entry Upgrades 667-1
Windows & doors
Tonset Woods - 667-1$225,764

Proposed for fiscal 2029 (1 project, $288,434)

State fiscal year: July 2028 to June 2029. Anticipated formula funding for the year, per the plan: $242,380. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
Unit Door Replacement 667-2
Windows & doors
Tonset Woods - 667-2$288,434

Further out: fiscal 2030–2031 (5 projects, $1,941,517)

The plan's “Years 4 and 5”: rough planning amounts, further out. State fiscal years: July 2029 to June 2031.

ProjectDevelopmentTotal project cost
Community Building Generator
Electrical & generators
Tonset Woods - 667-1$168,644
Siding Replacement (667-2)
Siding, masonry & exterior
Tonset Woods - 667-2$1,640,911
Exterior Trim, Soffit & Corner Board Replacement 181 Main St.
Siding, masonry & exterior
181 Main Street$50,590
Catch Basin Repair
Water, sewer & plumbing
53 Meetinghouse Road$7,260
Accessible Ramp Improvements
Accessibility (ADA)
53 Meetinghouse Road$74,112

Active projects (18)

The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.

ProjectDevelopmentTotal project cost
AIP: 667 Routine Turnovers
FISH 224085
$20,000
ARPA FF: Window replacement (John Avellar)
FISH 224067
John Avellar Circle and 15 Oak Ridge Ln.$115,190
ARPA Targeted Award: 667.01,667.02, 689.02,Fire Alarm System Replacement
FISH 224069
Tonset Woods - 667-1$861,350
53 Meetinghouse Road Roof Replacement
FISH 224071
53 Meetinghouse Road$60,000
ADA Unit Bathroom Upgrades
FISH 224072
Tonset Woods - 667-2$61,186
Laundry Room Flooring Replacement
FISH 224073
Tonset Woods - 667-1$9,455
Meeting House Rd Septic System Replacement
FISH 224074
53 Meetinghouse Road$127,525
ADA Vacant Unit Turn Over 667-2
FISH 224076
Tonset Woods - 667-2$179,972
ARPA FF: Landscape Timber Stair, Railing and Asphalt Walkway
FISH 224077
Tonset Woods - 667-2$132,310
Electric Meter - Service Feeder Replacement Oak Ridge Ln.
FISH 224078
John Avellar Circle and 15 Oak Ridge Ln.$12,403
Oil Tank Replacement
FISH 224079
John Avellar Circle and 15 Oak Ridge Ln.$99,966
Tree Trimming and Removal
FISH 224080
181 Main Street$11,480
Sewer Service Connection 181 Main Street
FISH 224081
181 Main Street$101,700
SUST: Install Bathroom Fans with Exterior Ventilation 667-1 & 667-2
FISH 224083
Tonset Woods - 667-1$279,621
Egress Stair Assembly Replacement 181 Main St.
FISH 224084
181 Main Street$38,550
Driveway, Parking Area & Walkway Replacement
FISH 224086
Tonset Woods - 667-1$96,100
Vacant Unit Rehab 667-1 Elms #2 - task force
FISH 224087
Tonset Woods - 667-1$41,623
Vacant Unit Turnover 705-1 #6 - task force
FISH 224088
John Avellar Circle and 15 Oak Ridge Ln.$60,107

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.