Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.
| Project | Development | Total cost | Spending planned |
|---|---|---|---|
| 2008 FF Master CFA FISH 216027 · Other | Lake Terrace 667-01 | $13,280 | — |
| Attic Space FISH 216069 · Other | 667-1,667-2 | $81,849 | 2026 |
| Emergency-ASHP - SUST- LEAN FISH 216074 · Heating, boilers & HVAC | Lake Terrace 667-01 | $673,210 | — |
| Reasonable accommodation 667 FISH 216080 · Accessibility (ADA) | Lake Terrace 667-01 | $22,000 | 2026 |
| Unit Renovation at Turnover Lake 2 FISH 216081 · Unit turnovers & renovations | Lake Terrace 667-01 | $22,196 | 2026 |
| Water Heater Replacement FISH 216082 · Heating, boilers & HVAC | Lake Terrace 667-01 | $9,958 | 2026 |
| Unit Renovation at Turnover Colonial 1 FISH 216085 · Unit turnovers & renovations | Colonial Drive 667-02 | $9,999 | 2026 |
| Colonial Drive reasonable Accomodation FISH 216086 · Other | Colonial Drive 667-02 | $9,999 | 2026 |
| ARPA Targeted Award: Northbridge Fire Alarm System FISH 216089 · Fire alarm & sprinklers | Sutton House 689-01 | $402,149 | 2026–2027 |
| Tree Removal Sutton St. FISH 216090 · Paving, walkways & site | Sutton House 689-01 | $5,175 | 2026 |
| Kitchen Counter, sinks and faucet replacement FISH 216091 · Kitchens & baths | Lake Terrace 667-01 | $159,469 | 2026–2027 |
| Electrical Upgrade FISH 216093 · Electrical & generators | Lake Terrace 667-01 | $32,609 | 2026–2027 |
| Emergency Heating system repairs FISH 216095 · Heating, boilers & HVAC | Lake Terrace 667-01 | $32,258 | 2026–2027 |
| Upgrade GFCI FISH 216096 · Other | Lake Terrace 667-01 | $9,998 | 2026 |
| Heating System Repairs Phase1 FISH 216097 · Heating, boilers & HVAC | Lake Terrace 667-01 | $9,831 | 2026 |
| Heating System Repairs Phase 2 FISH 216098 · Heating, boilers & HVAC | Lake Terrace 667-01 | $9,831 | 2026 |
| Deck Replacement FISH 216099 · Siding, masonry & exterior | Sutton House 689-01 | $14,950 | 2026 |
| Replace front concrete stairs FISH 216100 · Siding, masonry & exterior | Sutton House 689-01 | $10,588 | 2026 |
| Roof replacement FISH 216101 · Roofing & gutters | Sutton House 689-01 | $56,851 | 2026–2027 |
| Drainage System Repair FISH 216102 · Paving, walkways & site | Lake Terrace 667-01 | $9,943 | 2026 |
| Lake Terrace Roof Replacement FISH — · Roofing & gutters | Lake Terrace 667-01 | $202,675 | 2026 |
| New ADA Parking FISH — · Paving, walkways & site | Lake Terrace 667-01 | $9,983 | 2027 |
| Driveway Replacement FISH — · Paving, walkways & site | Sutton House 689-01 | $9,928 | 2027 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.