Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.

Open bids

None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.

This plan's Active Projects table is empty, so some fiscal 2027 items below (emergency, ARPA-funded or routine turnover work) may already be under way.

Proposed for fiscal 2027 (17 projects, $3,014,418)

State fiscal year: July 2026 to June 2027. Available formula funding for the year, per the plan: $296,350. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
Replace front and Back doors at 667-1
Windows & doors
Fountain Drive$498,218
Common Area Hallway Painting at 667-4
Interiors, flooring & painting
O'Connor Heights$45,375
Window Replacement - CG
Windows & doors
O'Connor Heights$294,625
Foulds Terrace Sidewalk / Curb / Apartment Stoop Upgrades / Repairs ? 667-3
Paving, walkways & site
Fould's Terrace$204,256
Bingham Way & OConnor Heights Tree Removal/Pruning-667-2 & 4
Paving, walkways & site
Bingham Way$32,370
Flagpole replacement 667 1-4 (four complexes)
Other
Fountain Drive$17,027
Foulds Window Replacement- 667-3
Windows & doors
Fould's Terrace$373,737
AIP: 667 Routine Turnovers
Unit turnovers & renovations
$32,800
Site Grading and Drainage
Paving, walkways & site
Bingham Way$174,275
Tree Removal and Replacement
Paving, walkways & site
Bingham Way$43,346
Asphalt Shingle Roof Replacement/Insulation Improvements -CG
Roofing & gutters
O'Connor Heights$215,618
Vacancy Initiative Renovation
Unit turnovers & renovations
Ashland Street$322,102
Concrete entry/stoop repairs
Windows & doors
Fountain Drive$402,402
Window Replacement
Windows & doors
Fountain Drive$111,220
Concrete Stair Repair/Replacement
Siding, masonry & exterior
Bingham Way$79,643
Common Area Painting
Interiors, flooring & painting
Bingham Way$52,517
CPC Community Generator.
Electrical & generators
Fould's Terrace$114,888

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.