Nantucket Housing Authority

Open bids and capital projects

Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.

Open bids

None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.

Projects in its capital plan (11, $3,240,665 total cost)

This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.

ProjectDevelopmentTotal costSpending planned
2008 Master CFA
FISH 201004 · Other
Miacomet Village 667-01$5,950—
Building Envelope Upgrades and Roofs F6, F7, F8, E10
FISH 201043 · Roofing & gutters
Miacomet Village 705-01$2,203,4832026
Automatic Door Operator
FISH 201045 · Windows & doors
Miacomet Village 667-01$8,0162026
Landscaping Upgrades 667-1
FISH 201048 · Paving, walkways & site
Miacomet Village 667-01$11,4102026
Tree Trimming & Removal 667-1/705-1
FISH 201049 · Paving, walkways & site
Miacomet Village 667-01$10,9722026
Vacant Unit Rehab 6A Benjamin Dr.
FISH 201051 · Unit turnovers & renovations
Miacomet Village 705-01$181,1032026–2027
Bathroom Exhaust Fans 667-1-705-1
FISH — · Heating, boilers & HVAC
Miacomet Village 667-01$93,7602026–2027
Laundry Room & Office Bathroom Upgrade
FISH — · Kitchens & baths
Miacomet Village 667-01$111,9562030
Asphalt Walkway Replacement 667 -1/705-1
FISH — · Paving, walkways & site
Miacomet Village 667-01 705-01$76,2572026
Electrical Panel Replacement 705-1/667-1
FISH — · Electrical & generators
Miacomet Village 705-01 667-01$196,7282030
Building Envelope: Siding, Windows & Doors 8A/8B
FISH — · Windows & doors
Miacomet Village 705-01$341,030—

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.