Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
State fiscal year: July 2027 to June 2028. Anticipated formula funding for the year, per the plan: $303,365. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Repair Columns Bldgs 2, 4, 6, 8, 12 Other | Colonial Drive | $201,069 |
| Surveillance Cameras (Phase 2) Security & access | Linden Apartment | $9,544 |
| Bulkhead Doors Phase 1 Windows & doors | Memorial Drive | $62,654 |
| Paving Repairs 667-2 Paving, walkways & site | Colonial Drive | $9,982 |
| 667-2 Tree Trimming FY28 - Merged Paving, walkways & site | $10,166 | |
| Flooring FY28 667-1 & 667-2 Interiors, flooring & painting | $9,982 | |
| New Cabinets FY28 667-1 & 667- 2 Kitchens & baths | $9,982 | |
| Walk-in Tubs FY28 667-2 & 667-3 Kitchens & baths | $9,982 |
State fiscal year: July 2028 to June 2029. Anticipated formula funding for the year, per the plan: $303,365. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Bulkhead Doors Phase 2 Windows & doors | Memorial Drive | $68,246 |
| Tree Trimming FY29 200-1, 667-2, 667-1, 667-3, 705 Paving, walkways & site | $10,590 | |
| Flooring FY29 -667-1, 667-2 Interiors, flooring & painting | $9,982 | |
| Walk-in Tubs FY29 - 667-2, 667-3 Kitchens & baths | $9,982 | |
| New Cabinets FY29 -667-1, 667-2 Kitchens & baths | $9,982 |
The plan's “Years 4 and 5”: rough planning amounts, further out. State fiscal years: July 2029 to June 2031.
| Project | Development | Total project cost |
|---|---|---|
| Replacement of parking lot Paving, walkways & site | Burbank | $79,052 |
| Installation of Heat pumps (minisplits) Heating, boilers & HVAC | Centerview | $350,000 |
| Painting Porches Siding, masonry & exterior | Burbank | $7,662 |
| Replacement of buzzer system (Entry Door) Windows & doors | Centerview | $172,145 |
| Sidewalk Replacement Paving, walkways & site | Memorial Drive | $59,179 |
| Kitchen Update at Turnover Kitchens & baths | Colonial Drive | $9,831 |
| Centerview Walk-in Tubs at Turnover Kitchens & baths | Colonial Drive | $9,831 |
| Window Replacement Phase 2 Windows & doors | Centerview | $339,841 |
| Elevator Repairs Elevators | Centerview | $210,454 |
The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.
| Project | Development | Total project cost |
|---|---|---|
| ARPA FF: Window Replacement Centerview FISH 186114 | $399,836 | |
| AIP: 667 Routine Turnovers FISH 186131 | $33,800 | |
| Sewer Service Replacement FISH 186125 | Memorial Drive | $84,140 |
| Roll-in Showers Congregate 667-4 CR FISH 186128 | Congregate | $388,350 |
| 230 Force Account - W Main Vacancy Turnover FISH 186129 | Scattered Site | $85,315 |
| Repair New Elevator FISH 186130 | Centerview | $228,693 |
| Driveways and Parking Spaces/lot Walkway Resurface FISH 186132 | Memorial Drive | $0 |
| Tree Trimming FISH 186133 | Memorial Drive | $9,983 |
| Linden Replace Tub Surrounds 667-1 FISH 186134 | Linden Apartment | $404,700 |
| Upgrade Exterior Lighting FISH 186135 | Colonial Drive | $10,900 |
| 667-2 Surveillance Cameras (Phase 1) FISH 186136 | Colonial Drive | $10,069 |
| Repair Intercom System FISH 186137 | Centerview | $9,697 |
| 667-3 Surveillance Cameras (Phase 1) FISH 186138 | Centerview | $10,588 |
| Call Box Repair FISH 186139 | Colonial Drive | $13,915 |
| 2008 Master CFA FISH 186042 | $0 | |
| FY16 2nd Elevator Initiative FISH 186079 | $1,982,456 | |
| Interior Sanitary Pipe Relining FISH 186103 | Congregate | $80,202 |
| ASHP - LEAN FISH 186104 | Memorial Drive | $0 |
| ARPA Targeted Award: Millbury Fire Alarm System FISH 186107 | Memorial Drive | $765,845 |
| Hot Water Heater Replacement 667-3 FISH 186113 | Centerview | $142,500 |
| Linden Street - Infrastructure Upgrade (by Town)- CDBG FISH 186115 | Linden Apartment | $622,040 |
| Total rehab of 7 Water Street FISH 186116 | Scattered Site | $345,781 |
| Roll-in Shower and kitchen Upgrade (#215) FISH 186121 | Linden Apartment | $79,905 |
| Fire Alarm Upgrade 667-3 Phase II FISH 186122 | Centerview | $329,426 |
| 230 W. Main Driveway FISH 186123 | Scattered Site | $84,963 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.