Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.

Open bids

None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.

Projects in its capital plan (12, $3,920,267 total cost)

This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.

ProjectDevelopmentTotal costSpending planned
2008 Master CFA
FISH 168037 · Other
Powder House 667-01$4,900—
ARPA Targeted Award: Marblehead Fed Panels
FISH 168120 · Electrical & generators
667-01, 667-05$736,9822026
ARPA FF: Paving Dev-Wide-Fence
FISH 168121 · Paving, walkways & site
Barnard Hawkes 200-01$261,2822026
Feasibility study for additional parking 667-3,4,and 5
FISH 168122 · Paving, walkways & site
Roads School 667-05$841,0002026–2027
ARPA FF: New Locks Dev-Wide
FISH 168124 · Security & access
667-2,667-3,667-4, 667-5$128,1012026
ARPA FF: Roads St Boiler Replacement
FISH 168126 · Heating, boilers & HVAC
Roads School 667-05$99,0002026–2027
New potable water system 667-3 and 667-4
FISH 168127 · Other
667-3, 667-4$625,8002026–2028
ARPA FF: Fire Escape Repaint/Walkway site work
FISH 168128 · Paving, walkways & site
Old Farrell Court 667-03$260,2002026–2027
Mechanical Room Door Replacement/Crawlspace Vent 667-1 & 667-2
FISH — · Windows & doors
Powder House 667-01$52,030—
Stoop, Stair and railing repair/replace. Walkway replacement
FISH — · Paving, walkways & site
Powder House 667-01$595,0752027–2029
Ventilation of Attics & Basements
FISH — · Heating, boilers & HVAC
New Farrell Court 667-04$182,0412026–2027
Dry system sprinkler renovations
FISH — · Fire alarm & sprinklers
Roads School 667-05$133,8562026

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.