Holliston Housing Authority

Open bids and capital projects

Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.

Open bids (1)

Proposed for fiscal 2027 (4 projects, $414,984)

State fiscal year: July 2026 to June 2027. Available formula funding for the year, per the plan: $164,649. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
Kitchen Reno 8 units
Kitchens & baths
Cole Court 667-1$277,483
Energy Efficient Lighting Upgrade to LED fixture
Electrical & generators · special award requested: $10,000
Cole Court 667-1$43,388
Misc Maintenance as needed 667-1
Other
Cole Court 667-1$10,925
667-1 New Paving at Garage
Paving, walkways & site
Cole Court 667-1$83,188

Proposed for fiscal 2028 (1 project, $279,537)

State fiscal year: July 2027 to June 2028. Anticipated formula funding for the year, per the plan: $164,649. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
New Windows
Windows & doors
Cutler Buildings$279,537

Proposed for fiscal 2029 (4 projects, $629,971)

State fiscal year: July 2028 to June 2029. Anticipated formula funding for the year, per the plan: $164,649. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
French Drains and new pumps
Water, sewer & plumbing
Cutler Buildings$52,938
Security Cameras site wide
Security & access
Cole Court 667-1$33,275
667-1 New shutters and power wash brick
Siding, masonry & exterior
Cole Court 667-1$50,665
New Kitchens(16) 667-2
Kitchens & baths
Cole Court 667-2$493,093

Further out: fiscal 2030–2031 (2 projects, $379,846)

The plan's “Years 4 and 5”: rough planning amounts, further out. State fiscal years: July 2029 to June 2031.

ProjectDevelopmentTotal project cost
Kitchen Upgrades
Kitchens & baths
Cole Court 667-1$334,471
Hallway Painting 667-01 & 02
Interiors, flooring & painting
Cole Court 667-1$45,375

Active projects (6)

The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.

ProjectDevelopmentTotal project cost
AIP: 667 Routine Turnovers
FISH 136069
$14,400
parking lot repaving, handicap ramp and curbing
FISH 136068
Cutler Buildings$142,715
Emergency Sewer Line Repair 705-01
FISH 136070
Cutler Buildings$9,800
Vacant Unit Rehabs
FISH 136071
$20,000
Kitchen Upgrades
FISH 136059
Cole Court 667-2$189,003
Septic Replacement- Per DHCD Study
FISH 136064
Cutler Buildings$31,000

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.