Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.
| Project | Development | Total cost | Spending planned |
|---|---|---|---|
| 2008 FF Master CFA FISH 134008 · Other | Checkerberry Village 667-01 | $4,365 | — |
| Garage roof replacement FISH 134055 · Roofing & gutters | Checkerberry Village 667-01 | $8,280 | 2026 |
| Sust Electric baseboard to ASHP FISH 134062 · Heating, boilers & HVAC | Checkerberry Village 667-01 | $558,391 | — |
| Greenhouse Glass Repair/Replace FISH 134065 · Other | Checkerberry Village 667-01 | $9,983 | 2026 |
| Mold Remediation FISH 134066 · Other | Checkerberry Village 667-01 | $9,350 | 2026 |
| Bench replacements/Additions FISH 134069 · Other | Checkerberry Village 667-01 | $11,984 | 2026 |
| DHCD ER Fire Alarm System Replacement FISH 134071 · Fire alarm & sprinklers | Checkerberry Village 667-01 | $467,170 | 2026 |
| ARPA FF: Exterior Lighting Additions FISH 134073 · Electrical & generators | Checkerberry Village 667-01 | $5,597 | 2026 |
| Asphalt Repairs FISH 134074 · Paving, walkways & site | Checkerberry Village 667-01 | $14,067 | 2026 |
| Unit Rehab Phase 2 (force account) FISH 134075 · Unit turnovers & renovations | Holden Commons Condominiums 705-01 | $33,744 | 2026–2027 |
| Comm Rm Upgrades FISH 134077 · Other | Checkerberry Village 667-01 | $9,983 | 2026 |
| ARPA FF: Window Replacement, Phase 3 FISH 134078 · Windows & doors | Checkerberry Village 667-01 | $110,435 | 2026 |
| Sustainability Electric Baseboard to ASHP Phase 2 FISH 134079 · Heating, boilers & HVAC | Checkerberry Village 667-01 | $2,116,030 | 2026 |
| Component Replacement on Turnover FISH 134080 · Unit turnovers & renovations | Checkerberry Village 667-01 | $12,268 | 2026 |
| Site Improvements FISH 134081 · Paving, walkways & site | Checkerberry Village 667-01 | $11,495 | 2026 |
| Parking lot line painting FISH 134082 · Paving, walkways & site | Checkerberry Village 667-01 | $1,250 | — |
| Tree Trimming/Removal FISH 134083 · Paving, walkways & site | Checkerberry Village 667-01 | $38,205 | 2026–2027 |
| SUST Heating System Electrification FISH 134084 · Heating, boilers & HVAC | Holden Commons Condominiums 705-01 | $160,000 | 2027 |
| Paving Repairs FISH 134085 · Paving, walkways & site | Checkerberry Village 667-01 | $26,310 | 2026 |
| Lock Replacement FISH 134086 · Security & access | Checkerberry Village 667-01 | $9,938 | 2026 |
| Component replacement on turn over FISH 134087 · Other | Checkerberry Village 667-01 | $9,953 | 2026 |
| FA Unit Rehab Phase 3 FISH 134088 · Unit turnovers & renovations | Holden Commons Condominiums 705-01 | $27,225 | 2026–2027 |
| Door Repairs/Replacement FISH 134089 · Windows & doors | Holden Commons Condominiums 705-01 | $9,960 | 2026 |
| Component Replacement Upon Unit Turnover FISH — · Unit turnovers & renovations | Checkerberry Village 667-01 | $9,904 | 2026 |
| Site Improvements FISH — · Paving, walkways & site | Checkerberry Village 667-01 | $9,850 | 2026 |
| Paving Repair Phase 3 FISH — · Paving, walkways & site | Checkerberry Village 667-01 | $12,100 | 2026 |
| Emergency generator installation FISH — · Electrical & generators | Checkerberry Village 667-01 | $121,756 | 2026 |
| FA Unit Turnover PH 4 FISH — · Unit turnovers & renovations | Holden Commons Condominiums 705-01 | $27,225 | 2026 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.