Plainbids · All housing authorities · Updated Sep 27, 2026
Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years. The plan also lists 3 projects paid for entirely outside formula funding (special awards, grants or other sources, about $32,049 in all) in a separate table, not shown here.
| Project | Development | Total cost | Spending planned |
|---|---|---|---|
| Bathroom upgrade and window removal FISH 128109 · Windows & doors | Hilldale Avenue Veterans 200-02 | $1,842,607 | 2026–2028 |
| Unit rehab and ADA unit conversion - Washington Sq. ARPA TAR ADA FISH 128112 · Accessibility (ADA) | Washington Square 667-04 | $1,838,399 | 2026–2027 |
| ARPA FF: Roof Repairs FISH 128116 · Roofing & gutters | Summer Street Veterans 200-01 | $431,250 | 2026 |
| Structural Integrity Repair - Vacancy FISH 128120 · Unit turnovers & renovations | Bradford Terrace 667-01 | $2,611,880 | 2026 |
| ARPA Targeted Award - Haverhill Fed Pac Panel and Fire Alarm Syst FISH 128121 · Fire alarm & sprinklers | 200-01, 689-01 | $906,625 | 2026 |
| VU2023: roof replacement FISH 128122 · Roofing & gutters | Bradford Terrace 667-01 | $368,197 | 2026 |
| Roof replacement FISH 128124 · Roofing & gutters | Julian D. Steele 667-03 | $563,597 | 2026 |
| Master Meter: Electrification of Stoves FISH 128142 · Electrical & generators | Bradford Terrace 667-01 | $832,000 | 2026 |
| Master Meter: Electrification of Stoves FISH 128143 · Electrical & generators | Kennedy Circle 667-02 | $1,354,066 | 2026 |
| Master Meter: Electrification of stoves FISH 128145 · Electrical & generators | Julian D. Steele 667-03 | $926,716 | 2026 |
| ADA Bathroom conversion - community room FISH 128146 · Kitchens & baths | Kennedy Circle 667-02 | $103,318 | 2026 |
| WSQ Office space reconfiguration study FISH 128147 · Studies & design | Washington Square 667-04 | $11,344 | 2026 |
| WSQ Rotted Structural Beam FISH 128148 · Other | Washington Square 667-04 | $670,823 | 2026 |
| Roof Replacement FISH 128149 · Roofing & gutters | Highland Avenue 689-01 | $110,900 | 2026 |
| VU 2023: 140 Summer St, unit#8; Tremont St. #s 1, 1A, 7 FISH 128152 · Other | Summer Street Veterans 200-01 and Brook, Albert Streets 705-02 | $660,950 | 2026 |
| 8J South Warren St. Roof replacement and unit renovations FISH 128157 · Roofing & gutters | South Warren Family 705-01 | $305,613 | 2026–2027 |
| Bradford Terrace Vacant unit/bath exhaust fan project FISH 128162 · Heating, boilers & HVAC | Bradford Terrace 667-01 | $419,700 | 2026–2027 |
| 8A South Warren & 202 Hilldale Vacant Unit Renovations FISH 128163 · Unit turnovers & renovations | Hilldale Avenue Veterans 200-02 | $221,594 | 2026–2027 |
| Site Fencing Replacement 667-1 & 705-1 FISH 128166 · Paving, walkways & site | Bradford Terrace 667-01 | $143,700 | 2026–2027 |
| Mt. Vernon St. Vacant Unit Initiative Project FISH 128168 · Unit turnovers & renovations | Summer Street Veterans 200-01 | $120,835 | 2026–2027 |
| Generator Installation 667-1, 667-2, 667-3 FISH — · Electrical & generators | 667-1 667-2 667-3 | $340,314 | 2030 |
| SUS - ASHP installation Dev-wide FISH — · Heating, boilers & HVAC | Bradford Terrace 667-01 | $1,556,363 | 2027–2029 |
| Sand Flooring in alll common hallways FISH — · Interiors, flooring & painting | Kennedy Circle 667-02 | $24,956 | 2026 |
| Parking spaces Line Striping FISH — · Paving, walkways & site | 667-2, 200-2 | $9,832 | 2026 |
| Common Hallways Flooring Replacement and New Paint FISH — · Interiors, flooring & painting | Julian D. Steele 667-03 | $155,880 | 2027 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.
Get every housing authority bid, every Monday. Free.