Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.
| Project | Development | Total cost | Spending planned |
|---|---|---|---|
| VU23: Unit improvements at 667s - on turnover (Phase 2) FISH 113091 · Unit turnovers & renovations | Elm Terrace 667-01 | $52,554 | 2026 |
| Exterior Envelope Component Repairs FISH 113092 · Siding, masonry & exterior | George Street 689-01 | $16,423 | 2026 |
| Oak Court Boiler replacement - ASHP FISH 113108 · Heating, boilers & HVAC | Oak Courts 200-01 | $1,143,000 | 2026–2027 |
| Convert Tubs in units to ADA walk-in showers FISH 113111 · Kitchens & baths | Elm Terrace 667-02 | $29,000 | 2027–2028 |
| Boiler Replacement FISH 113113 · Heating, boilers & HVAC | George Street 689-01 | $40,070 | 2027 |
| Interior components replacement FISH 113114 · Interiors, flooring & painting | George Street 689-01 | $34,073 | 2026 |
| Bathroom Exhaust Upgrade FISH 113120 · Heating, boilers & HVAC | Elm Terrace 667-02 | $46,920 | 2028 |
| Roof Replacement 667-1 and 667-2 FISH 113121 · Roofing & gutters | Elm Terrace 667-01 | $209,928 | — |
| VU23: Unit improvements at 667s - on turnover (Phase 3) FISH 113123 · Unit turnovers & renovations | Elm Terrace 667-02 | $50,000 | 2027 |
| Elm Terrace Sidewalk Drainage FISH 113125 · Paving, walkways & site | Elm Terrace 667-01 | $87,806 | — |
| Emergency Boiler Replacement -Bld 10 Units 36-39 FISH 113126 · Heating, boilers & HVAC | Oak Courts 200-01 | $66,792 | 2026 |
| 25-31 Sullivan Lane Drainage FISH 113127 · Paving, walkways & site | Sullivan Lane 705-03 | $60,500 | 2027–2028 |
| Elm Terrace Parking Lot Pipe Repair FISH 113128 · Water, sewer & plumbing | Elm Terrace 667-01 | $113,279 | — |
| Building 5 Water Mitigation FISH 113129 · Other | Oak Courts 200-01 | $0 | — |
| MAH VCT Replacement - Common Areas FISH 113131 · Other | Morgan-Allen House 667-03 | $10,233 | 2026 |
| AIP: 667 Routine Turnovers (113130) FISH 113132 · Unit turnovers & renovations | Elm Terrace 667-01 | $0 | — |
| Vacant Unit Turnovers - Force Account FISH 113134 · Unit turnovers & renovations | Elm Terrace 667-02 | $80,500 | 2026–2027 |
| Maintenance Garage FISH — · Other | Oak Courts 200-01 | $106,572 | 2026 |
| Elm Terrace Sust Toilet Replacement FISH — · Other | Elm Terrace 667-01 | $52,856 | 2026 |
| Conway-Wells Boiler Replacement FISH — · Heating, boilers & HVAC | Conway-Wells 705-02 | $235,255 | — |
| Kitchens/Baths - 118A/B Wells St FISH — · Kitchens & baths | Conway-Wells 705-02 | $112,408 | — |
| Sullivan Lane Roof Replacement FISH — · Roofing & gutters | Sullivan Lane 705-03 | $112,138 | 2026–2027 |
| Sullivan Lane Boiler Replacement FISH — · Heating, boilers & HVAC | Sullivan Lane 705-03 | $272,269 | — |
| Window Replacement - Mill Street FISH — · Windows & doors | Mill Street 705-1F | $22,439 | 2027 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.