Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
This plan's Active Projects table is empty, so some fiscal 2027 items below (emergency, ARPA-funded or routine turnover work) may already be under way.
State fiscal year: July 2026 to June 2027. Available formula funding for the year, per the plan: $268,953. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Roof Replacement and Trim replacement-667-1 Roofing & gutters | Trestle Way 667-1 | $483,761 |
| Roof Replacement and Trim Replacement-667-2 Roofing & gutters | Trestle Way 667-2 | $631,890 |
| SUST Mini Split installation Heating, boilers & HVAC · special award requested: $1,337,050 | Trestle Way 667-1 | $1,337,050 |
| Fire Alarm Panel Replacement and Components Fire alarm & sprinklers | Jewett St | $87,500 |
| Replace Door and rekey locksets- Community Room Windows & doors | Trestle Way 667-1 | $10,164 |
| Replace Mechanical Room Doors - Developement wide Windows & doors | Jewett St | $10,350 |
| Surveillance Camera Installation Security & access | Trestle Way 667-1 | $10,350 |
| AIP: 667 Routine Turnovers Unit turnovers & renovations | $25,200 | |
| Driveway, Parking Area & Walkway Replacement and Select Concrete Step Repair Paving, walkways & site | Trestle Way 667-1 | $119,890 |
| Electric Service Study Electrical & generators | Trestle Way 667-1 | $26,409 |
| Unit repairs 3 Hemlock Other | Trestle Way 667-2 | $74,858 |
| Emergency Hazardous Tree Removal Paving, walkways & site | Trestle Way 667-1 | $17,250 |
| Dev Wide Replacement of Main water line shutoffs Other | Trestle Way 667-1 | $36,786 |
| SEPTIC SYSTEM and WWTP STUDY Water, sewer & plumbing | Trestle Way 667-1 | $31,500 |
| Window replacement Windows & doors | $696,576 | |
| DEV Wide New Tub Wall Surrounds Kitchens & baths | Jewett St | $72,263 |
| Emergency heat pump replacement Heating, boilers & HVAC | Trestle Way 667-2 | $11,241 |
| EMG ASHP Replacement- Community Area Heating, boilers & HVAC | Trestle Way 667-1 | $48,800 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.