Franklin Housing Authority

Open bids and capital projects

Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.

Open bids

None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.

Projects in its capital plan (22, $3,402,452 total cost)

This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.

ProjectDevelopmentTotal costSpending planned
Community Restroom Upgrades
FISH 101159 · Other
Central Park Terrace 667-03$49,587—
Main Sewer Pipe Replacement
FISH 101160 · Water, sewer & plumbing
Central Park Terrace 667-03$580,3122026
ARPA FF: Roof replacement
FISH 101161 · Roofing & gutters
Theron Metcalf School 667-04$191,5852026
Water Lines
FISH 101164 · Other
Central Park Terrace 667-03$370,0722026
ARPA Targeted: Franklin Fire Pump System
FISH 101166 · Fire alarm & sprinklers
Theron Metcalf School 667-04$145,7582026–2027
ARPA FF: Roof Replacement
FISH 101167 · Roofing & gutters
Central Park Terrace 667-02$0—
Circulator Pumps
FISH 101168 · Other
Central Park Terrace 667-01$9,1982026
Tree Trim & Removal
FISH 101170 · Paving, walkways & site
Walnut Street 705-01$3,010—
Unit Turnover
FISH 101192 · Unit turnovers & renovations
Central Park Terrace 667-01$10,738—
Wide Angle Door Viewer
FISH 101193 · Windows & doors
Central Park Terrace 667-02$1,0272026
Emergency Concrete Windowsill Repairs
FISH 101194 · Windows & doors
Central Park Terrace 667-03$116,7372026
Flooring Replacement
FISH 101195 · Interiors, flooring & painting
Brook Street 689-01$18,8652026
Emergency HVAC Replacement
FISH 101196 · Heating, boilers & HVAC
Murphy-Rosa House 689-02$350,9642026–2027
Waste Pipes And Sewer Invert Replacement
FISH — · Water, sewer & plumbing
Central Park Terrace 667-01$314,589—
Asphalt Walkways
FISH — · Paving, walkways & site
Central Park Terrace 667-01$149,0052026
Asphalt Paving - Office Area Parking
FISH — · Paving, walkways & site
Central Park Terrace 667-02$65,7942026
Fire Alarm System Upgrade
FISH — · Fire alarm & sprinklers
Central Park Terrace 667-03$418,950—
Exterior Door Replacement
FISH — · Windows & doors
Central Park Terrace 667-03$244,503—
Sewer Pipe Lining - Community Bldg.
FISH — · Water, sewer & plumbing
Central Park Terrace 667-03$19,6632026
Window Replacement
FISH — · Windows & doors
Theron Metcalf School 667-04$207,359—
HVAC Upgrades
FISH — · Heating, boilers & HVAC
Walnut Street 705-01$115,3172026
Tree Trimming & Removal
FISH — · Paving, walkways & site
Walnut Street 705-01$19,4192026

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.