Plainbids · All housing authorities · Updated Sep 27, 2026

Framingham Housing Authority

Open bids and capital projects

Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.

Open bids (1)

Proposed for fiscal 2026 (1 project, $151,250)

State fiscal year: July 2025 to June 2026. That year has already ended. Available formula funding for the year, per the plan: $811,242. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
Basement Drainage Assesment
Paving, walkways & site
Rose Kennedy Lane$151,250

Further out: fiscal 2029–2030 (24 projects, $2,210,731)

The plan's “Years 4 and 5”: rough planning amounts, further out. State fiscal years: July 2028 to June 2030.

ProjectDevelopmentTotal project cost
RKL site lighting upgrades Phase 2 667-5
Electrical & generators
Rose Kennedy Lane$40,838
RKL Site Lights P2 667-6
Electrical & generators
Rose Kennedy$40,838
667-5 Floors/Kitchen/Baths
Kitchens & baths
Rose Kennedy Lane$51,750
667-4 kitchens/Bathroom/Floors
Kitchens & baths
Arsenal$121,000
(2020) Site Paving 667-2
Paving, walkways & site
Everett, Gallagher, and Grant Streets$6,806
(2022) Interior Renovations St Lo
Interiors, flooring & painting
St. Lo Rd$151,250
interior Unit door replacement
Windows & doors
Rose Kennedy$37,812
Vacant unit improvements
Unit turnovers & renovations
St. Lo Rd$30,250
security cameras
Security & access
St. Lo Rd$75,625
Bathroom Upgrades 667-3
Kitchens & baths
Guadacanal, Normandy, and Arsenal Road$25,300
Vacant Units 667-3
Unit turnovers & renovations
Guadacanal, Normandy, and Arsenal Road$57,500
Vacant Units 667-5
Unit turnovers & renovations
Rose Kennedy Lane$14,950
Repointing Phase 2
Siding, masonry & exterior
Hastings House$412,500
Accessible Unit Renovations
Accessibility (ADA)
Rose Kennedy Lane$181,500
HCAP unit renovations
Unit turnovers & renovations
Rose Kennedy$75,625
Vacant Unit Kitchens
Kitchens & baths
Rose Kennedy Lane$0
Emergency Heat/Hot water Repair
Heating, boilers & HVAC
Memorial House$20,125
Bathroom renovations
Kitchens & baths
Hastings House$151,250
Common Area Hallway Upgrades RKL-5
Interiors, flooring & painting
Rose Kennedy Lane$86,250
Common Area Hallway Upgrades RKL-6
Interiors, flooring & painting
Rose Kennedy$86,250
Ars-3 Vacant Units Upgrades
Unit turnovers & renovations
Guadacanal, Normandy, and Arsenal Road$37,812
Arsenal -4 Vacant unit upgrades
Unit turnovers & renovations
Arsenal$75,625
RKL -6 vacant unit upgrades
Unit turnovers & renovations
Rose Kennedy$51,750
Bathroom Renovations Phase 2
Kitchens & baths
Hastings House$378,125

Active projects (45)

The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.

ProjectDevelopmentTotal project cost
ARPA FF: 667-3 Maint BLDG Renov Study
FISH 100267
Guadacanal, Normandy, and Arsenal Road$137,506
ARPA FF: Entryway Railings and Columns
FISH 100270
Arsenal$61,863
ARPA FF: Kitchen Reno 667-5 & 667-6 RKL
FISH 100271
Rose Kennedy Lane$296,326
ARPA FF: Masonry Repairs 667-5
FISH 100272
Rose Kennedy Lane$20,000
ARPA FF: Masonry Repairs 667-6
FISH 100274
Rose Kennedy$27,183
Repaving Parking lot (9RKL) 667--5 & 667-6
FISH 100275
Rose Kennedy$51,934
AIP: 667 Routine Turnovers
FISH 100339
$107,200
HILAPP St Lo Windows, Siding, Ext Doors - force account
FISH 100132
St. Lo Rd$1,225,522
Roof for community building
FISH 100215
Arsenal$16,589
Site Fence Replacement Temple
FISH 100222
Temple Place$12,000
Bathroom Plumbing Fixture Replacement
FISH 100225
$16,370
Sewer pipe replacement
FISH 100298
St. Lo Rd$23,000
Common Hallway 667-4 Painting Phase 3
FISH 100299
Arsenal$71,872
Heat Detector Replacement 705-3
FISH 100304
Oran Road$2,268
Security Cameras 667-4
FISH 100305
Arsenal$23,000
Fire Alarm Repairs- Basement flooding
FISH 100309
Guadacanal, Normandy, and Arsenal Road$23,000
Heat Detector Replacement (7942)
FISH 100313
Everett, Gallagher, and Grant Streets$3,968
Heat Detector Replacement (7938)
FISH 100314
Arsenal$21,000
Replace Heat Detectors 54 Arsenal (7941)
FISH 100315
Arsenal$28,000
Heat Detector Replacement (7940)
FISH 100317
Rose Kennedy$12,000
Roof Replacements
FISH 100321
St. Lo Rd$181,345
Decks St Lo 200-2
FISH 100322
St. Lo Rd$85,000
Trash Corral Replacements Phase 2
FISH 100323
St. Lo Rd$76,338
Site Paving
FISH 100324
St. Lo Rd$100,000
Unit Turnover - Force Account
FISH 100328
Guadacanal, Normandy, and Arsenal Road$330,000
Fire door and bulkhead stair replacement
FISH 100333
Underwood$18,000
Mini Split Installation- 85 Alexander
FISH 100334
Alexander St$10,000
Deck Replacement
FISH 100335
Alexander St$33,300
Roofing Replacement
FISH 100336
$57,100
security, lighting and life safety upgrades Memorial House
FISH 100340
Memorial House$70,150
site paving, walkways and side walk improvements
FISH 100341
Rose Kennedy Lane$86,250
Trash Corrals and Site Fencing Upgrades
FISH 100342
Rose Kennedy Lane$11,500
site paving, walkways & sidewalk imprvmts 667-6
FISH 100343
Rose Kennedy$60,500
Trash Corrals and Site Fencing Upgrades
FISH 100344
Rose Kennedy$15,125
intercom replacement
FISH 100345
Hastings House$145,100
Door Replacement
FISH 100346
Temple Place$9,200
Lift repair or replacement
FISH 100347
Underwood$13,455
Hastings Emerg.boilers rplcmt 667-5
FISH 100348
Hastings House$68,992
Circulator Pump Replacement (Emergency)
FISH 100349
Oran Road$14,950
Window Replacement Bethany
FISH 100252
Scattered Site$15,000
ARPA Targeted Fire Alarm Syst. Upgrade 667- 2, -7 &-8, 689-1 &2
FISH 100263
Everett, Gallagher, and Grant Streets$1,320,586
- Entry Doors RKL (2)
FISH 100279
Rose Kennedy$313,217
Cracks and lintel separation
FISH 100283
$34,000
Replace Failed Heat Detectors/Bases
FISH 100290
Guadacanal, Normandy, and Arsenal Road$8,000
ARPA TAR: Fed Pac & Master Meter 667-6 Compliance - Stoves
FISH 100292
Rose Kennedy$1,038,892

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.

Get every housing authority bid, every Monday. Free.