Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years. The plan also lists 1 project paid for entirely outside formula funding (special awards, grants or other sources, about $187,214 in all) in a separate table, not shown here.
| Project | Development | Total cost | Spending planned |
|---|---|---|---|
| 2008 FF Master CFA FISH 097048 · Other | Canton Valley 705-02 | $10,300 | — |
| ER: Green Acres Basements FISH 097076 · Other | Green Acres Village 200-01 | $5,367,005 | — |
| FF: Parking lot paving, curb replacement FISH 097120 · Paving, walkways & site | Daniel Heights 667-02 | $419,016 | 2026–2027 |
| SUST -CSI 2019: Envelope and Lighting. FISH 097124 · Electrical & generators | Canton Valley 705-02\ Canton Valley 705-02 | $8,800,813 | — |
| Accessible Units 2020 - Update 9 Units to Full Accessibility FISH 097127 · Accessibility (ADA) | CJ Durkin Apts 667-05 | $1,645,261 | — |
| ModPhase 2020: Exterior portion FISH 097131 · Siding, masonry & exterior | Wallace Tower 667-03 | $713,420 | — |
| ModPhase 2020: Interior Renovations FISH 097132 · Interiors, flooring & painting | Wallace Tower 667-03 | $46,368,152 | 2026 |
| Federal Conversion FISH 097136 · Other | Taft St 705-1I | $1,050,893 | — |
| Creative Placemaking FISH 097156 · Other | CJ Durkin Apts 667-05 | $0 | — |
| DMH Project - TBD FISH 097160 · Other | Alternatives, Inc. 689-03 | $75,860 | 2026 |
| Exterior Repairs, Kitchen Modernization and Asphalt Pavement Replacement FISH 097161 · Kitchens & baths | Community Residence 689-01 | $1,057,075 | 2026 |
| 667-5 Fire alarm upgrades FISH 097162 · Fire alarm & sprinklers | CJ Durkin Apts 667-05 | $28,330 | 2026 |
| ARPA FF: ModPhase Ph III - SUST FY22 & Unitil - Air-Source Heat Pumps FISH 097165 · Heating, boilers & HVAC | Wallace Tower 667-03 | $3,798,014 | — |
| Asphalt/Walkway /Curb repairs FISH 097167 · Paving, walkways & site | Canton Valley 705-02 | $57,221 | 2026 |
| Vacancy Turnover - 15 Units (Force Account) FISH 097168 · Unit turnovers & renovations | Green Acres Village 200-01 | $343,923 | — |
| Reasonable Accommodation Request to Install Handicapped Ramp FISH 097171 · Accessibility (ADA) | Daniel Heights 667-02 | $27,653 | — |
| ARPA Targeted- Fitchburg Fed Pacific Panels and Fire Alarm Upgrades FISH 097173 · Fire alarm & sprinklers | 2001-01, 667-03, 689-03, 705-02 | $498,509 | 2026 |
| Emergency Elevator Repair for Compliance DHCD CR Request FISH 097174 · Elevators | CJ Durkin Apts 667-05 | $135,911 | 2026 |
| Emergency Repair to Water Main - DHCD ER Request FISH 097175 · Water, sewer & plumbing | Canton Valley 705-02 | $11,607 | 2026 |
| Boiler/Furnace/H WH - Replacement DHCD ER/SUST Request - Phase 3 FISH 097176 · Heating, boilers & HVAC | Green Acres Village 200-01 | $2,520,994 | 2026 |
| Underground Heat Piping Repair-ASHP Install -DHCD ER Request FISH 097179 · Water, sewer & plumbing | Daniel Heights 667-02 | $546,639 | — |
| Reconfiguration of Gas Meters - Canton Valley FISH 097180 · Other | Canton Valley 705-02 | $92,901 | 2026 |
| Storm Door Replacement - Forced Account FISH 097181 · Windows & doors | Green Acres Village 200-01 | $227,798 | 2026–2027 |
| Mold Remediation – Green Acres – 4 Units FISH 097182 · Other | Green Acres Village 200-01 | $65,325 | 2026 |
| Emergency Roof Repair FISH 097183 · Roofing & gutters | Wallace Tower 667-03 | $13,770 | — |
| Emergency Elevator Repair - Wallace FISH 097184 · Elevators | Wallace Tower 667-03 | $61,469 | 2026 |
| Emergency Generator Repairs FISH 097185 · Electrical & generators | CJ Durkin Apts 667-05 | $52,047 | 2026 |
| Hot Water Heater Replacements-Durkin FISH 097186 · Heating, boilers & HVAC | CJ Durkin Apts 667-05 | $6,610 | — |
| Green Acres Basements - Water Infiltration FISH 097187 · Other | Green Acres Village 200-01 | $120,000 | 2027–2028 |
| Rooftop Ventilation Unit Repairs - Durkin FISH 097188 · Heating, boilers & HVAC | CJ Durkin Apts 667-05 | $35,015 | — |
| Kitchen, Bath, and Plumbing Renovation FISH 097189 · Water, sewer & plumbing | CJ Durkin Apts 667-05 | $536,044 | 2026 |
| VU23: Interior Remodel and Structural Repairs FISH 097190 · Interiors, flooring & painting | Sheridan St 705-1A | $658,069 | 2026 |
| Interior lighting replacement FISH 097191 · Electrical & generators | Alternatives, Inc. 689-03 | $0 | — |
| VU2023: Vacancy Turnover - Additional 22 Units - Force acct. FISH 097193 · Unit turnovers & renovations | Green Acres Village 200-01 | $626,146 | 2026–2027 |
| VU23 - Unit turnovers Additional Units - Daniel Heights (#10 & #18) FISH 097194 · Unit turnovers & renovations | Daniel Heights 667-02 | $137,981 | 2026 |
| VU23: Unit Turnovers - Force Acct.- CJ-Durkin FISH 097195 · Unit turnovers & renovations | CJ Durkin Apts 667-05 | $265,466 | 2026 |
| VU23 Unit Turnover - Additional Units - Canton Valley FISH 097196 · Unit turnovers & renovations | Canton Valley 705-02 | $153,850 | 2026 |
| VU23 Unit Turnovers - Additional Units - Mayland FISH 097197 · Unit turnovers & renovations | Mayland St 705-1B | $13,769 | — |
| VU23 Ashburnham St - Mildew - Rehab – EMG FISH 097198 · Unit turnovers & renovations | Ashburnham St 705-1E | $781,786 | 2026 |
| Community Center and Admin Offices - Green Acres FISH 097200 · Other | Green Acres Village 200-01 | $9,990,620 | 2026–2027 |
| Fitchburg-Wallace-Asbestos Phase 5 - CR Request-1 FISH 097201 · Other | Wallace Tower 667-03 | $506,861 | 2026 |
| Emergency Roof Replacement & Rooftop Ventilation repairs FISH 097202 · Roofing & gutters | CJ Durkin Apts 667-05 | $3,361,104 | 2026–2027 |
| RA Request for Automatic ADA Doors FISH 097203 · Windows & doors | CJ Durkin Apts 667-05 | $16,602 | 2026 |
| Maintenance Slop Sinks FISH 097204 · Other | Green Acres Village 200-01 | $17,687 | 2026 |
| Interior Remodel and Renovations FISH 097205 · Interiors, flooring & painting | Overland St 705-1K | $637,914 | 2026–2027 |
| RA Request to Install Stairlift FISH 097207 · Other | Green Acres Village 200-01 | $22,688 | 2026 |
| Storm Door Replacement FISH — · Windows & doors | Wallace Tower 667-03 | $65,945 | — |
| Replace Windows - Durkin Apts FISH — · Windows & doors | CJ Durkin Apts 667-05 | $805,836 | 2026–2028 |
| Replace Windows Phase 2 Durkin Apts. FISH — · Windows & doors | CJ Durkin Apts 667-05 | $151,250 | 2027 |
| Window Replacement - CJD - Phase 3 FISH — · Windows & doors | CJ Durkin Apts 667-05 | $718,438 | 2028–2029 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.