Plainbids · All housing authorities · Updated Sep 27, 2026
Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.
| Project | Development | Total cost | Spending planned |
|---|---|---|---|
| FF: Chimney Rebuild/ Cap FISH 087067 · Siding, masonry & exterior | Gladacres 200-01 | $6,406 | 2026 |
| ARPA FF: Repair Asphalt and Drainage Bldg 3, new parking add 667-2 FISH 087085 · Paving, walkways & site | Cliffview Manor 667-02 | $358,871 | 2026 |
| Replace concrete Sidewalks FISH 087086 · Paving, walkways & site | Arlington St 705-01 | $8,074 | 2026 |
| Boiler Maintenance Program 667-1 FISH 087090 · Heating, boilers & HVAC | Sunrise Manor 667-01 | $67,319 | 2026 |
| Replace driveways 200-1 FISH 087092 · Paving, walkways & site | Gladacres 200-01 | $43,040 | — |
| Phase 4 & 5 exterior Doors 667-2 merged 087095 into FISH 087094 · Windows & doors | Cliffview Manor 667-02 | $114,533 | 2026–2027 |
| Exterior stairs and walkway upgrade FISH 087096 · Paving, walkways & site | Dickinson Court 667-04 | $9,858 | 2026 |
| ARPA Targeted Award- 667-1,667-2,& 667-3 Fire Alarm FISH 087098 · Fire alarm & sprinklers | Cliffview Manor 667-03 | $112,000 | 2026–2027 |
| Unit turnover- Tub to Shower Unit 667-1 FISH 087099 · Kitchens & baths | Sunrise Manor 667-01 | $10,743 | 2026 |
| Add Accessibility Ramp 667-1 FISH 087100 · Accessibility (ADA) | Sunrise Manor 667-01 | $10,372 | 2026 |
| Porch Repairs and Painting 667-2 FISH 087101 · Siding, masonry & exterior | Cliffview Manor 667-02 | $61,539 | 2026 |
| Unit turnover-tub replacement 667-2 FISH 087102 · Kitchens & baths | Cliffview Manor 667-02 | $10,743 | 2026 |
| Replace Hot Water Tanks 667-3 FISH 087103 · Heating, boilers & HVAC | Cliffview Manor 667-03 | $9,897 | 2026 |
| Regrade entrance walks 667-3 FISH 087104 · Windows & doors | Cliffview Manor 667-03 | $9,796 | 2026 |
| Upgrade exterior lighting 667-4 FISH 087105 · Electrical & generators | Dickinson Court 667-04 | $44,495 | 2026 |
| Replace Carpet 689-1 FISH 087106 · Interiors, flooring & painting | Holyoke Street 689-01 | $0 | — |
| New Roof 200- 50 south st. FISH 087107 · Roofing & gutters | Gladacres 200-01 | $9,336 | 2026 |
| Replace driveways Phase 2 200-1 FISH 087108 · Paving, walkways & site | Gladacres 200-01 | $38,250 | 2026 |
| Unit Turnover-Glad Acres 200-1 FISH 087109 · Unit turnovers & renovations | Gladacres 200-01 | $19,665 | 2026 |
| Remove and replace rear siding 667-3 FISH 087110 · Siding, masonry & exterior | Cliffview Manor 667-03 | $40,603 | 2026 |
| Porch repairs-painting Phase 2 667-3 FISH 087111 · Siding, masonry & exterior | Cliffview Manor 667-03 | $22,065 | 2026 |
| Tub replacement at turnover 667-4 FISH 087112 · Kitchens & baths | Dickinson Court 667-04 | $10,397 | 2026 |
| Installation of Drainage System FISH 087114 · Paving, walkways & site | Gladacres 200-01 | $13,321 | 2026 |
| Roof Replacement Building #10 FISH 087115 · Roofing & gutters | Cliffview Manor 667-03 | $92,355 | 2026 |
| VUI-Unit 1 Accessible Unit Renovation FISH 087116 · Accessibility (ADA) | Dickinson Court 667-04 | $121,071 | 2026–2027 |
| VUI-Renovation 2 Lussier Circle FISH 087117 · Unit turnovers & renovations | Cliffview Manor 667-03 | $70,634 | 2026 |
| Emergency Unit Abatement FISH 087118 · Other | Cliffview Manor 667-03 | $127,781 | — |
| Replace Driveways-Gladacres FISH — · Paving, walkways & site | Gladacres 200-01 | $72,120 | 2029 |
| Replace Selected Roof at Gladacres FISH — · Roofing & gutters | Gladacres 200-01 | $60,030 | 2029 |
| Remove and Replace rear storm doors FISH — · Windows & doors | Sunrise Manor 667-01 | $43,959 | 2029 |
| New Crawl Space Access Panels FISH — · Electrical & generators | Cliffview Manor 667-02 | $51,085 | 2029 |
| Second option Generator FISH — · Electrical & generators | Cliffview Manor 667-02 | $160,023 | 2030 |
| Installation of bathroom vents and fans FISH — · Heating, boilers & HVAC | Cliffview Manor 667-03 | $140,335 | 2028 |
| Upgrade Exterior Drainage FISH — · Paving, walkways & site | Cliffview Manor 667-03 | $84,657 | 2027 |
| Exterior Balcony Repairs and Painting FISH — · Siding, masonry & exterior | Dickinson Court 667-04 | $65,255 | 2027 |
| Remove and Replace Sidewalks FISH — · Paving, walkways & site | Dickinson Court 667-04 | $54,735 | 2028 |
| New Driveways-Arlington & Pleasant St FISH — · Paving, walkways & site | Arlington St 705-01 | $21,630 | 2028 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.