Plainbids · All housing authorities · Updated Sep 27, 2026
Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.
| Project | Development | Total cost | Spending planned |
|---|---|---|---|
| Heating System Repairs FISH 082059 · Heating, boilers & HVAC | Duxborough Village 667-01 | $9,900 | 2026–2027 |
| Snow Guards & Heat Cables, Bldgs 1 & 3 FISH 082065 · Heating, boilers & HVAC | Duxborough Village 667-01 | $5,751 | 2026 |
| Electrical Repairs FISH 082067 · Electrical & generators | Cordwood Path 689-02 | $12,956 | 2026 |
| Side Porch Repairs 689-2 & Portico Repairs 689-1 FISH 082068 · Siding, masonry & exterior | Cordwood Path 689-02 | $102,249 | 2026 |
| Asphalt Shingle Roofing Replacement 705-1C FISH 082069 · Roofing & gutters | Bay Road 705-1C | $47,380 | 2026 |
| Exterior Egress Stair Replacement 705-1C FISH 082070 · Siding, masonry & exterior | Bay Road 705-1C | $35,453 | 2026 |
| CCTV Security Cameras 667-1 FISH 082071 · Security & access | Duxborough Village 667-01 | $15,114 | 2026 |
| Unit A Cabinet & Countertop Replacement 705-1B U #A FISH 082072 · Kitchens & baths | Chestnut Street 705-1B | $39,200 | 2027–2028 |
| Various Safety Improvements 689-1 705-1A & 1B FISH 082073 · Other | 689-01, 705-1A, 705-1B | $14,162 | 2026 |
| Building 4 Unit Entry Door Replacement 667-1 FISH 082074 · Windows & doors | Duxborough Village 667-01 | $14,408 | 2026 |
| Entry Door Hardware Rplcmt 667-1 CR FISH 082075 · Windows & doors | Duxborough Village 667-01 | $93,090 | 2026–2027 |
| Bathroom Renovations FISH 082077 · Kitchens & baths | Merry Ave 689-01 | $108,956 | 2026–2027 |
| Common Area Interior Painting FISH 082081 · Interiors, flooring & painting | Duxborough Village 667-01 | $43,548 | 2026–2027 |
| Exterior Walkway Replacement FISH 082082 · Paving, walkways & site | Merry Ave 689-01 | $45,330 | 2026–2027 |
| Smoke Detector Replacement FISH — · Fire alarm & sprinklers | Duxborough Village 667-01 & Merry Ave 689-01 | $116,859 | 2028 |
| Wood Dwelling Unit Door Replacement FISH — · Windows & doors | Duxborough Village 667-01 | $199,343 | 2026 |
| Common Area Flooring Replacement, Phase 2 FISH — · Interiors, flooring & painting | Duxborough Village 667-01 | $67,844 | 2026 |
| Brick Repointing Study FISH — · Siding, masonry & exterior | Duxborough Village 667-01 | $15,525 | 2026 |
| AIP: 667 Routine Turnovers (082080) FISH — · Unit turnovers & renovations | Duxborough Village 667-01 | $0 | — |
| Walkway Replacement FISH — · Paving, walkways & site | Duxborough Village 667-01 | $152,067 | 2026 |
| Exterior GFCI Upgrades FISH — · Siding, masonry & exterior | Duxborough Village 667-01 | $44,075 | 2030 |
| Basement Cleanout and Repairs FISH — · Other | Union Street 705-1A | $9,200 | 2030 |
| Chimney Brick Repointing FISH — · Siding, masonry & exterior | Union Street 705-1A | $7,060 | 2030 |
| Exterior Siding Replacement FISH — · Siding, masonry & exterior | Chestnut Street 705-1B | $75,236 | 2030 |
| Roofing Replacement FISH — · Roofing & gutters | Old Cordwood Path 705-1D | $30,743 | 2030 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.
Get every housing authority bid, every Monday. Free.