Duxbury Housing Authority

Open bids and capital projects

Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.

Open bids

None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.

Projects in its capital plan (25, $1,305,449 total cost)

This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.

ProjectDevelopmentTotal costSpending planned
Heating System Repairs
FISH 082059 · Heating, boilers & HVAC
Duxborough Village 667-01$9,9002026–2027
Snow Guards & Heat Cables, Bldgs 1 & 3
FISH 082065 · Heating, boilers & HVAC
Duxborough Village 667-01$5,7512026
Electrical Repairs
FISH 082067 · Electrical & generators
Cordwood Path 689-02$12,9562026
Side Porch Repairs 689-2 & Portico Repairs 689-1
FISH 082068 · Siding, masonry & exterior
Cordwood Path 689-02$102,2492026
Asphalt Shingle Roofing Replacement 705-1C
FISH 082069 · Roofing & gutters
Bay Road 705-1C$47,3802026
Exterior Egress Stair Replacement 705-1C
FISH 082070 · Siding, masonry & exterior
Bay Road 705-1C$35,4532026
CCTV Security Cameras 667-1
FISH 082071 · Security & access
Duxborough Village 667-01$15,1142026
Unit A Cabinet & Countertop Replacement 705-1B U #A
FISH 082072 · Kitchens & baths
Chestnut Street 705-1B$39,2002027–2028
Various Safety Improvements 689-1 705-1A & 1B
FISH 082073 · Other
689-01, 705-1A, 705-1B$14,1622026
Building 4 Unit Entry Door Replacement 667-1
FISH 082074 · Windows & doors
Duxborough Village 667-01$14,4082026
Entry Door Hardware Rplcmt 667-1 CR
FISH 082075 · Windows & doors
Duxborough Village 667-01$93,0902026–2027
Bathroom Renovations
FISH 082077 · Kitchens & baths
Merry Ave 689-01$108,9562026–2027
Common Area Interior Painting
FISH 082081 · Interiors, flooring & painting
Duxborough Village 667-01$43,5482026–2027
Exterior Walkway Replacement
FISH 082082 · Paving, walkways & site
Merry Ave 689-01$45,3302026–2027
Smoke Detector Replacement
FISH — · Fire alarm & sprinklers
Duxborough Village 667-01 & Merry Ave 689-01$116,8592028
Wood Dwelling Unit Door Replacement
FISH — · Windows & doors
Duxborough Village 667-01$199,3432026
Common Area Flooring Replacement, Phase 2
FISH — · Interiors, flooring & painting
Duxborough Village 667-01$67,8442026
Brick Repointing Study
FISH — · Siding, masonry & exterior
Duxborough Village 667-01$15,5252026
AIP: 667 Routine Turnovers (082080)
FISH — · Unit turnovers & renovations
Duxborough Village 667-01$0—
Walkway Replacement
FISH — · Paving, walkways & site
Duxborough Village 667-01$152,0672026
Exterior GFCI Upgrades
FISH — · Siding, masonry & exterior
Duxborough Village 667-01$44,0752030
Basement Cleanout and Repairs
FISH — · Other
Union Street 705-1A$9,2002030
Chimney Brick Repointing
FISH — · Siding, masonry & exterior
Union Street 705-1A$7,0602030
Exterior Siding Replacement
FISH — · Siding, masonry & exterior
Chestnut Street 705-1B$75,2362030
Roofing Replacement
FISH — · Roofing & gutters
Old Cordwood Path 705-1D$30,7432030

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.