Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
State fiscal year: July 2026 to June 2027. Available formula funding for the year, per the plan: $278,709. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Vacant Unit Turnover OBR #214 Unit turnovers & renovations · special award requested: $23,152 | Old Bass River Village | $23,152 |
| Vacant Unit Turnover WMV A Side #2-10 Unit turnovers & renovations · special award requested: $27,907 | Windmill Village | $27,907 |
| ADA Vacant Unit Rehab Bldg. 2 Unit 12 Accessibility (ADA) · special award requested: $182,866 | Center St Village | $281,416 |
State fiscal year: July 2027 to June 2028. Anticipated formula funding for the year, per the plan: $278,709. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Tree Trimming and Removal 667- /705 Paving, walkways & site | Center St Village | $11,271 |
| Building Envelope Upgrades Grassy Pond Dr. and Bayridge Dr. Siding, masonry & exterior | $231,790 |
State fiscal year: July 2028 to June 2029. Anticipated formula funding for the year, per the plan: $278,709. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Parking area repairs Paving, walkways & site | Windmill Village | $121,626 |
| Crawlspace Access Hatch Other | Special Needs Housing | $11,720 |
| Stormwater Drainage Mulhern Dr. Paving, walkways & site | Mulhern Drive Family Housing | $104,877 |
| Storage Shed WMV Other | Windmill Village | $16,615 |
The plan's “Years 4 and 5”: rough planning amounts, further out. State fiscal years: July 2029 to June 2031.
| Project | Development | Total project cost |
|---|---|---|
| Egress Balcony Replacement O.B.R. Siding, masonry & exterior | Old Bass River Village | $459,830 |
| Siding & Window Replacement O.B.R. CPA Windows & doors | Old Bass River Village | $1,913,005 |
The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.
| Project | Development | Total project cost |
|---|---|---|
| ARPA FF: Landscape Designing FISH 075098 | $14,572 | |
| AIP: 667 Routine Turnovers FISH 075113 | $24,800 | |
| New Septic System Center Street FISH 075085 | Center St Village | $1,094,380 |
| Install ADA automatic door FISH 075086 | Special Needs Housing | $20,701 |
| ARPA Targeted Award: Dennis Fed- Pac Panel and Fire Alarm Systems FISH 075097 | Center St Village | $684,866 |
| Mini-Split/ASHP for Community Room FISH 075103 | Old Bass River Village | $12,886 |
| Ellis Dr. Deck Replacement FISH 075104 | Scattered Site | $71,763 |
| Select Tree Trimming & Pruning 705/667 FISH 075106 | Windmill Village | $9,800 |
| Common Area Flooring Replacement Clipper Ln. FISH 075107 | Special Needs Housing | $74,563 |
| Cast Iron Drain Line Replacement BLDG. 2 FISH 075109 | Center St Village | $39,027 |
| Remaining Siding & Windows (Rear Upper Level) FISH 075110 | Windmill Village | $102,382 |
| Accessible unit conversion #9 FISH 075111 | Center St Village | $226,545 |
| ADA Vacant Unit Rehab Unit #114 667-2 FISH 075114 | Old Bass River Village | $101,158 |
| Siding, Windows & Door Replacement Crestwood Dr. and Ellis Dr. FISH 075115 | Scattered Site | $289,985 |
| Install Exit Signage - Center Street Village FISH 075116 | Center St Village | $110,225 |
| Door Closer Upgrade - Center Street Village FISH 075117 | Center St Village | $81,394 |
| EMG Air Conditioner Replacement Clipper Ln. FISH 075118 | Special Needs Housing | $7,488 |
| Mold Remediation & Plumbing Repairs FISH 075119 | Center St Village | $6,869 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.