Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
State fiscal year: July 2026 to June 2027. Available formula funding for the year, per the plan: $159,349. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Back entrance canopy Windows & doors | Peter Bulkeley Terrace | $9,234 |
| Roof Replacement dev wide Roofing & gutters | Thoreau Street | $73,520 |
| Office flooring replacement Interiors, flooring & painting | Everett Gardens | $13,991 |
| A/C replacement Other | Peter Bulkeley Terrace | $24,200 |
| Front porch and garage door replacement Windows & doors | Scattered Site Condos | $34,788 |
State fiscal year: July 2027 to June 2028. Anticipated formula funding for the year, per the plan: $159,349. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| SUS-Air Source Heat Pumps Heating, boilers & HVAC | Everett Gardens Expansion | $514,250 |
| everett exp window replacement Windows & doors | Everett Gardens Expansion | $147,461 |
State fiscal year: July 2028 to June 2029. Anticipated formula funding for the year, per the plan: $159,349. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Typical Kitchen Replacement- Everett Gardens Kitchens & baths | Everett Gardens | $50,895 |
| Air Source Heat Pump-SUST Heating, boilers & HVAC | Everett Gardens | $617,100 |
The plan's “Years 4 and 5”: rough planning amounts, further out. State fiscal years: July 2029 to June 2031.
| Project | Development | Total project cost |
|---|---|---|
| Fencing Installation & Replacement Paving, walkways & site | Strawberry Hill Road / Bedford St | $21,300 |
| Storm drain repairs w/paving Water, sewer & plumbing | Peter Bulkeley Terrace | $56,930 |
The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.
| Project | Development | Total project cost |
|---|---|---|
| AIP: 667 Routine Turnovers FISH 067138 | $16,000 | |
| SUS ASHP 667-1,3 FISH 067133 | Everett Gardens | $2,753,540 |
| 667-1 Camera/Surveillance Installation FISH 067135 | Everett Gardens | $133,580 |
| *EMG* DCAMM Septic System Replacement FISH 067136 | Strawberry Hill Road / Bedford St | $626,109 |
| Fire Alarm Panel Upgrade & Fire Suppression System FISH 067137 | Everett Gardens | $1,252,042 |
| Common Back door replacement & Exterior Porches need Refinishing FISH 067140 | Everett Gardens | $495,015 |
| Driveway and Walkway Reconstruction FISH 067141 | 282 Thoreau Street | $34,800 |
| Roadway/Driveway Paving FISH 067142 | Grove Street / Walden Street | $69,100 |
| Fire Suppression System FISH 067144 | $0 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.