Clinton Housing Authority

Open bids and capital projects

Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.

Open bids

None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.

Proposed for fiscal 2027 (1 project, $523,718)

State fiscal year: July 2026 to June 2027. Available formula funding for the year, per the plan: $288,130. Proposals can run well past that; some depend on special awards from the state.

ProjectDevelopmentTotal project cost
Window replacement, Mid-rise
Windows & doors
Presentation Apts$523,718

Further out: fiscal 2030–2031 (2 projects, $512,818)

The plan's “Years 4 and 5”: rough planning amounts, further out. State fiscal years: July 2029 to June 2031.

ProjectDevelopmentTotal project cost
VAT replacement
Other
367 Water$167,818
2nd Elevator for Mid Rise 667-3
Elevators
Presentation Apts$345,000

Active projects (33)

The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.

ProjectDevelopmentTotal project cost
Mailbox Replacement
FISH 064120
Shaughnessy Apts$5,041
AIP: 667 Routine Turnovers
FISH 064129
$27,000
667-1 Component Replacement on Turnover Ph 2
FISH 064133
367 Water$9,730
667-2 Component Replacement on Turnover Ph 2
FISH 064134
Shaughnessy Apts$9,881
667-3 Component Replacement on Turnover Ph 2
FISH 064135
Presentation Apts$9,915
ARPA FF: Mid-rise Sprinkler retro-fit 667-3
FISH 064074
Presentation Apts$582,347
FF: 689-1 1st Floor Bathroom upgrades and windows
FISH 064075
Pleasant Terrace$10,230
689-1 Window Replacement Phase 1 and storm door replacement
FISH 064088
Pleasant Terrace$10,200
200-1 vinyl siding repairs
FISH 064091
Woodlawn and Fitch$4,041
Victoria 2nd egress stairway rplcmt 667-3
FISH 064096
Presentation Apts$245,158
Gutter & Siding Repairs
FISH 064099
Woodlawn and Fitch$51,135
200-1 Component replacement during turnover #4
FISH 064100
Woodlawn and Fitch$9,200
Countertop Repair/Replacement of floors
FISH 064106
367 Water$5,294
Shed Repairs
FISH 064107
367 Water$3,781
Kitchen & Bath Improvements
FISH 064108
Shaughnessy Apts$9,983
Interior Common Area Painting
FISH 064111
Presentation Apts$25,713
689-1 Component Upgrades
FISH 064113
Pleasant Terrace$13,467
ARPA Targeted Award: FedPac Panel and F.A. 200-1
FISH 064114
Woodlawn and Fitch$1,248,484
ARPA Targeted Award: Fire Alarm System 667-3
FISH 064116
Presentation Apts$456,075
ARPA Targeted : Fire Alarm Panel & devices 689-1
FISH 064117
Pleasant Terrace$16,880
Handrail/Stair Repairs
FISH 064118
Woodlawn and Fitch$9,999
Fence Replacements
FISH 064119
Woodlawn and Fitch$9,460
Shaughnessy Component Replacement on turn over
FISH 064121
Shaughnessy Apts$9,998
Shaughnessy Handrail/Stair Repairs
FISH 064122
Shaughnessy Apts$10,262
HVAC/lighting/repairs/flooring
FISH 064123
Pleasant Terrace$9,428
667-2 Gas range to electric conversion
FISH 064124
Shaughnessy Apts$85,000
667-3 Gas range to electric conversion
FISH 064125
Presentation Apts$92,000
Elevator - major upgrade
FISH 064127
$346,036
689 Roof/Door Replacement
FISH 064128
Pleasant Terrace$14,025
Window Replacement
FISH 064130
Pleasant Terrace$93,775
689 Decking Repairs
FISH 064131
Pleasant Terrace$9,911
689 Paving
FISH 064132
Pleasant Terrace$81,109
689-1 Component Replacement on Turnover Ph2
FISH 064136
Pleasant Terrace$9,983

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.