Chelsea Housing Authority

Open bids and capital projects

Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.

Open bids (2)

Projects in its capital plan (29, $55,946,331 total cost)

This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.

ProjectDevelopmentTotal costSpending planned
Innes PEHO Grant
FISH 057092 · Other
Innes Apts 200-03$41,633,5932027
Camera system replacement
FISH 057108 · Security & access
Prattville Apts 200-02$372,8552026
Security Camera replacement
FISH 057109 · Security & access
Buckley 667-02$251,1942026
SUST-R -- Floodproofing
FISH 057110 · Roofing & gutters
Prattville Apts 200-02$1,015,6582026
Structural study
FISH 057113 · Studies & design
Fitzpatrick 200-01$0—
ARPA Targeted Award - FA Upgrade and Smoke Detector Replacement - Pratville
FISH 057115 · Fire alarm & sprinklers
Prattville Apts 200-02$815,0002026–2027
façade study Bloomingdale
FISH 057116 · Siding, masonry & exterior
Buckley 667-02$25,000—
ARPA Targeted Award: 667-02 fire alarm replacement - Buckley
FISH 057117 · Fire alarm & sprinklers
Buckley 667-02$2,075,5922026
Replace common area and electric baseboard heating
FISH 057120 · Heating, boilers & HVAC
Buckley 667-02$769,0902026–2028
Laundry facility upgrades
FISH 057122 · Other
Buckley 667-02$13,9422026
Rewire main feed and replace main panels
FISH 057124 · Electrical & generators
Buckley 667-02$73,4152026
Replace roof, fascia, and gutters - Priority Project
FISH 057127 · Roofing & gutters
Union Park 667-01$381,0152026–2027
Resiliency Feasibility Study Union Park
FISH 057128 · Paving, walkways & site
Union Park 667-01$20,0002026
Replace fencing and extend fencing
FISH 057129 · Paving, walkways & site
Union Park 667-01$83,5662026
Facade repair
FISH 057131 · Siding, masonry & exterior
Buckley 667-02$262,5882026–2027
Valve replacement (kitchen/hallway)
FISH 057132 · Kitchens & baths
Buckley 667-02$470,8292026–2027
Entryway improvements (canopy, seating area)
FISH 057133 · Other
Buckley 667-02$128,5632026–2027
DHW relocation
FISH 057134 · Heating, boilers & HVAC
Buckley 667-02$1,406,8412027–2028
Replace intercom / security system
FISH 057135 · Security & access
Buckley 667-02$225,0602026–2027
Electrical system upgrades
FISH 057136 · Electrical & generators
Buckley 667-02$27,2252026–2027
61 Exeter St emergency sewer pipe lining
FISH 057138 · Water, sewer & plumbing
Prattville Apts 200-02$12,7732026
Install sump pumps in elevator pit
FISH 057139 · Elevators
Buckley 667-02$50,4232026–2027
AIP: 667 Routine Turnovers (057137)
FISH — · Unit turnovers & renovations
Union Park 667-01$0—
Replace Unit Doors
FISH — · Windows & doors
Union Park 667-01$207,0612026
Replace 75 gal. DHW heaters with electric tankless heaters
FISH — · Heating, boilers & HVAC
Union Park 667-01$114,1532026
Replace DHW tanks with tankless units
FISH — · Heating, boilers & HVAC
Buckley 667-02$136,0452026
AIP: 667 Routine Turnovers (057137)
FISH — · Unit turnovers & renovations
Buckley 667-02$0—
carport/first floor waste line replacement
FISH — · Interiors, flooring & painting
Buckley 667-02$587,3182027–2029
Bathroom modernization
FISH — · Kitchens & baths
Buckley 667-02$4,787,5322029–2030

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.