Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
State fiscal year: July 2027 to June 2028. Anticipated formula funding for the year, per the plan: $152,810. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Mailbox Replacement (667-1) Security & access | Anchorage | $10,784 |
| Asphalt Walkway Replacement 667-1 Paving, walkways & site | Anchorage | $66,419 |
| Kitchen Cabinet Replacement Harold Ln. Kitchens & baths | Harold Lane | $43,548 |
State fiscal year: July 2028 to June 2029. Anticipated formula funding for the year, per the plan: $152,810. Proposals can run well past that; some depend on special awards from the state.
| Project | Development | Total project cost |
|---|---|---|
| Intercom Upgrade 667-1 Security & access | Anchorage | $183,769 |
The plan's “Years 4 and 5”: rough planning amounts, further out. State fiscal years: July 2029 to June 2031.
| Project | Development | Total project cost |
|---|---|---|
| Electric Meter Bank Replacement (Selective unit 705-1) Electrical & generators | Captains Landing | $72,698 |
| Electric Range Replacement 667- 1 Electrical & generators | Anchorage | $70,547 |
| Replace Cast Iron Drain Lines 667- 1 Water, sewer & plumbing | Anchorage | $171,273 |
The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.
| Project | Development | Total project cost |
|---|---|---|
| AIP: 667 Routine Turnovers FISH 055082 | $11,800 | |
| Repair ADA ramp and deck repairs FISH 055062 | Harold Lane | $5,700 |
| Selective Kitchen/Bathroom Finishes Replacement Project FISH 055063 | Martha Kendrick | $11,625 |
| Selective Kitchen Cabinet/Countertop Replacement Project FISH 055064 | Captains Landing | $9,375 |
| Vacant ADA Accessible Unit Rehab FISH 055070 | Captains Landing | $105,919 |
| Septic System Replacement 36 Harold Ln. FISH 055078 | Harold Lane | $10,000 |
| Exterior Door Replacement 689-2 FISH 055084 | Martha Kendrick | $38,211 |
| Window Replacement Phase 3 FISH 055086 | Anchorage | $108,000 |
| Concrete Ramp & Stoop Repairs 667- 1 FISH 055087 | Anchorage | $128,458 |
| Common Area Flooring Replacement 689-1 FISH 055088 | Harold Lane | $59,806 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.