Plainbids · All housing authorities · Updated Sep 27, 2026
Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.
| Project | Development | Total cost | Spending planned |
|---|---|---|---|
| 2008 FF Master CFA FISH 042026 · Other | Hemlock Drive 1 667-01 | $1,800 | — |
| FF: EMG - Waste Pipe Replacement FISH 042074 · Water, sewer & plumbing | Wall St 705-1G | $3,232 | — |
| ARPA Targeted Award: Fire Alarm System Upgrade 667-1,667-2,& 689-1 FISH 042104 · Fire alarm & sprinklers | 667-01, 689-01 | $1,276,789 | — |
| ARPA FF: Generator Installation 667-1 CB & 667-3 FISH 042109 · Electrical & generators | Hemlock Drive 1 667-01 | $387,914 | 2026 |
| Boiler Replacements 705-1B & 705-1D FISH 042110 · Heating, boilers & HVAC | Main Street 705-1B & Summer Street 705-1D | $8,000 | 2027 |
| Asbestos Flooring Abatement - Unit Turnovers FISH 042114 · Interiors, flooring & painting | Hemlock Drive 1 667-01 | $45,567 | — |
| New Exterior Egress Stairs FISH 042118 · Siding, masonry & exterior | 667-03 & 689-1 | $108,975 | — |
| EMG Underground Waste Pipe Repair FISH 042122 · Water, sewer & plumbing | Hemlock Drive 2 667-02 | $18,563 | 2026 |
| Water Heater Replacement FISH 042123 · Heating, boilers & HVAC | Hemlock Drive 1 667-01 | $33,016 | 2026–2027 |
| Underground Waste Line Improvements FISH 042124 · Other | Hemlock Drive 1 667-01 | $121,900 | 2026–2027 |
| Window Replacement & Exterior Repairs FISH 042125 · Windows & doors | Hemlock Drive 1 667-01 & Hemlock Drive 2 667-02 | $791,359 | 2026 |
| Bath Exhaust Fan And Kitchen Range Hood Installation SUST FISH 042126 · Heating, boilers & HVAC | Hemlock Drive 2 667-02 | $732,256 | 2026 |
| ASHP Repairs 667-1 FISH 042135 · Heating, boilers & HVAC | Hemlock Drive 1 667-01 | $12,500 | 2026 |
| Flooring at Turnover 667-1 FISH 042136 · Interiors, flooring & painting | Hemlock Drive 1 667-01 | $3,450 | 2026 |
| VU23: 667-1, 667- 2, 667-3 Multiple Units FISH 042137 · Other | Hemlock Drive 2 667-02 | $124,218 | 2026 |
| ASHP Repairs 667-2 FISH 042138 · Heating, boilers & HVAC | Hemlock Drive 2 667-02 | $12,500 | 2026 |
| Flooring at Turnover 667-2 FISH 042139 · Interiors, flooring & painting | Hemlock Drive 2 667-02 | $3,450 | 2026 |
| Flooring at Turnover 667-3 FISH 042141 · Interiors, flooring & painting | Heritage Street 667-03 | $7,071 | 2026 |
| Community Building Entrance & Sidewalk Replacement FISH 042142 · Windows & doors | Hemlock Drive 1 667-01 | $122,030 | 2026 |
| Sump Pump Installation FISH 042143 · Other | Hemlock Drive 1 667-01 | $12,634 | 2026 |
| Fixture Shut-Off Valve Replacement FISH 042144 · Other | Heritage Street 667-03 | $41,156 | 2026 |
| Cast Iron Waste Pipe Replacement FISH 042145 · Water, sewer & plumbing | Hemlock Drive 1 667-01 & Hemlock Drive 2 667-02 | $323,075 | 2026 |
| Medicine Cabinets - GFI Install (667-1 & 667-2) FISH 042146 · Kitchens & baths | Hemlock Drive 1 667-01 & Hemlock Drive 2 667-02 | $265,186 | 2026–2027 |
| SUST: Low-Flow Toilets (667-1 & 667-2) FISH 042147 · Other | Hemlock Drive 1 667-01 & Hemlock Drive 2 667-02 | $54,455 | 2026 |
| SUST: Refrigerator Replacement FISH 042148 · Other | Hemlock Drive 1 667-01 | $208,331 | 2026 |
| 19 Hemlock Roll-In Shower Reasonable Accommodation FISH 042150 · Kitchens & baths | Hemlock Drive 1 667-01 | $12,514 | 2026 |
| 217 Heritage Roll-In Shower Reasonable Accommodation FISH 042152 · Kitchens & baths | Heritage Street 667-03 | $12,514 | 2026 |
| 208 Heritage Reasonable Accommodation - ADA Auto Door Opener Install FISH 042153 · Windows & doors | Heritage Street 667-03 | $7,475 | 2026 |
| Force Account - Common Hallway Flooring - Asbestos Abatement FISH 042155 · Interiors, flooring & painting | Hemlock Drive 2 667-02 | $49,910 | 2026 |
| Common Laundry Entrance FISH — · Windows & doors | Hemlock Drive 1 667-01 | $41,128 | 2027 |
| Exterior Walkway Replacement FISH — · Paving, walkways & site | Hemlock Drive 1 667-01 | $258,752 | 2029–2030 |
| Fire Alarm System Upgrade FISH — · Fire alarm & sprinklers | Heritage Street 667-03 | $246,659 | 2028 |
| Kitchen Cabinets and Countertops (689-1) FISH — · Kitchens & baths | Heritage Circle 689-01 | $86,876 | 2027–2028 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.
Get every housing authority bid, every Monday. Free.