Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years. The plan also lists 1 project paid for entirely outside formula funding (special awards, grants or other sources, about $64,405 in all) in a separate table, not shown here.
| Project | Development | Total cost | Spending planned |
|---|---|---|---|
| Walkway, parking area repaving FISH 030095 · Paving, walkways & site | Courtney Drive 200-02 | $586,297 | 2026 |
| Master Meter - Beverly Stove Conversion 667-3 FISH 030117 · Other | Kelleher Road Apts 667-03 | $1,165,119 | 2026 |
| MM - Beverly Stove Conversions 667-4 FISH 030118 · Other | Cedar St Apts 667-04 | $1,042,433 | 2026 |
| Master Meter - Beverly Stove Conversions 667-5 FISH 030119 · Other | Essex Apts 667-05 | $1,317,637 | 2026 |
| Walkway, roadway, parking lot repaving FISH 030120 · Paving, walkways & site | Essex Apts 667-05 | $620,288 | 2026 |
| ARPA Targeted : Roger Conant FA Upgrade FISH 030121 · Other | Roger Conant Apts 667-06 | $917,440 | 2026 |
| Drainage Project at 45 Balch Street in Beverly, 667-2 FISH 030122 · Paving, walkways & site | Balch Apts 667-02 | $500,250 | 2026–2027 |
| Roger Conant Paving FISH 030128 · Paving, walkways & site | Roger Conant Apts 667-06 | $467,253 | 2026–2027 |
| Parking Lot Fence Replacement-An d Paving FISH 030129 · Paving, walkways & site | Federal St Apts 667-07 | $52,629 | 2026 |
| 689 AC/Mechanical Replacements FISH 030130 · Heating, boilers & HVAC | Upton Place Apts 667-08 | $94,944 | 2026 |
| Cedar St Driveway and walkway repaving FISH 030131 · Paving, walkways & site | Cedar St Apts 667-04 | $528,538 | 2026–2027 |
| New Generator FISH 030132 · Electrical & generators | Upton Place Apts 667-08 | $314,600 | 2026–2027 |
| *EMG* DCAMM Water main break FISH 030134 · Water, sewer & plumbing | Courtney Drive 200-02 | $12,053 | — |
| *Reasonable Accommodation* -Unit #306 Walk-in Shower- FISH 030135 · Kitchens & baths | Upton Place Apts 667-08 | $19,884 | 2026 |
| Unit 49 Modernization Project **Force Account** FISH 030136 · Unit turnovers & renovations | Family Apts 200-01 | $74,113 | 2026–2027 |
| Vacant Unit Modernization project **Force Account** FISH 030137 · Unit turnovers & renovations | 705 Family Apts 705-01 | $74,113 | 2026–2027 |
| Bresnahan and Dearborn Bathroom Rehab Dev-wide FISH — · Kitchens & baths | Family Apts 200-01 | $412,288 | 2026 |
| Rehab Kitchens FISH — · Kitchens & baths | Kelleher Road Apts 667-03 | $10,285 | 2026 |
| SUS - Installation of Bath Fans FISH — · Heating, boilers & HVAC | Cedar St Apts 667-04 | $128,563 | 2027 |
| Cedar St Driveway and walkway repaving FISH — · Paving, walkways & site | Cedar St Apts 667-04 | $549,652 | 2026 |
| SUS - Installation of Bath Fans FISH — · Heating, boilers & HVAC | Essex Apts 667-05 | $128,563 | 2027 |
| Power wash Buildings FISH — · Other | Essex Apts 667-05 | $10,285 | 2026 |
| Kitchen Upgrades FISH — · Kitchens & baths | Federal St Apts 667-07 | $10,285 | 2026 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.