Bellingham Housing Authority

Open bids and capital projects

Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.

Open bids

None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.

Projects in its capital plan (12, $2,982,651 total cost)

This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.

ProjectDevelopmentTotal costSpending planned
Drainage connection to existing wells
FISH 025062 · Paving, walkways & site
Depot Court 667-01$9,9252026
Balcony bracing
FISH 025064 · Siding, masonry & exterior
Depot Court 667-01$38,790—
ARPA FF: balcony & interior hallway flooring 667-2
FISH 025065 · Siding, masonry & exterior
Wrentham Manor 667-02$209,8802026
Septic System Replacement (Now Sewer Connection)
FISH 025067 · Water, sewer & plumbing
Arthur Street 705-B$59,5142026
Bathroom Exhaust fan installation
FISH 025068 · Heating, boilers & HVAC
Depot Court 667-01$763,0392026–2027
Sewer Pipes Replacement
FISH 025070 · Water, sewer & plumbing
Wrentham Manor 667-02$276,0002026–2027
Concrete Walkway Replacement - Phase 3
FISH 025071 · Paving, walkways & site
Depot Court 667-01$110,8252026
Rear Entry Door Lock
FISH 025072 · Windows & doors
Wrentham Manor 667-02$11,011—
ADA accessible shower conversion
FISH — · Kitchens & baths
Depot Court 667-01$503,580—
Exterior Door Replacement
FISH — · Windows & doors
Depot Court 667-01$205,9062026–2027
Driveway & Parking lot Asphalt Paving
FISH — · Paving, walkways & site
Depot Court 667-01$560,651—
Exterior Door Replacement
FISH — · Windows & doors
Wrentham Manor 667-02$233,530—

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.