Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.
| Project | Development | Total cost | Spending planned |
|---|---|---|---|
| Drainage connection to existing wells FISH 025062 · Paving, walkways & site | Depot Court 667-01 | $9,925 | 2026 |
| Balcony bracing FISH 025064 · Siding, masonry & exterior | Depot Court 667-01 | $38,790 | — |
| ARPA FF: balcony & interior hallway flooring 667-2 FISH 025065 · Siding, masonry & exterior | Wrentham Manor 667-02 | $209,880 | 2026 |
| Septic System Replacement (Now Sewer Connection) FISH 025067 · Water, sewer & plumbing | Arthur Street 705-B | $59,514 | 2026 |
| Bathroom Exhaust fan installation FISH 025068 · Heating, boilers & HVAC | Depot Court 667-01 | $763,039 | 2026–2027 |
| Sewer Pipes Replacement FISH 025070 · Water, sewer & plumbing | Wrentham Manor 667-02 | $276,000 | 2026–2027 |
| Concrete Walkway Replacement - Phase 3 FISH 025071 · Paving, walkways & site | Depot Court 667-01 | $110,825 | 2026 |
| Rear Entry Door Lock FISH 025072 · Windows & doors | Wrentham Manor 667-02 | $11,011 | — |
| ADA accessible shower conversion FISH — · Kitchens & baths | Depot Court 667-01 | $503,580 | — |
| Exterior Door Replacement FISH — · Windows & doors | Depot Court 667-01 | $205,906 | 2026–2027 |
| Driveway & Parking lot Asphalt Paving FISH — · Paving, walkways & site | Depot Court 667-01 | $560,651 | — |
| Exterior Door Replacement FISH — · Windows & doors | Wrentham Manor 667-02 | $233,530 | — |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.