Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.
| Project | Development | Total cost | Spending planned |
|---|---|---|---|
| 2008 FF Master CFA FISH 020044 · Other | Adams Court 667-01 | $1,500 | — |
| FF: Accessible ramps FISH 020061 · Accessibility (ADA) | Adams Court 667-01 | $29,500 | — |
| ARPA Targeted- Barnstable Fire Alarm Syst Upgrade FISH 020127 · Fire alarm & sprinklers | 667-01, 667-03, 689-01, 689-02, 689-03, 689-04 | $591,880 | 2026 |
| Unit Rehabs 84 Old Phinney & 44 Kelley FISH 020131 · Unit turnovers & renovations | Scattered Site 705-01 | $674,744 | — |
| ADA Ramp and Porch Repair Project FISH 020145 · Siding, masonry & exterior | Captain Eldredge House **Hist 667-03 | $87,228 | — |
| Replace exterior doors FISH 020146 · Windows & doors | Adams Court 667-01 | $142,760 | — |
| ARPA FF: Replace Roofs FISH 020147 · Roofing & gutters | Barnstable and Hyannis House 667-02 | $859,810 | — |
| EMG Septic System Repair FISH 020148 · Water, sewer & plumbing | Adams Court 667-01 | $59,294 | — |
| Community room siding replacement, kitchen upgrades FISH 020150 · Kitchens & baths | Adams Court 667-01 | $154,102 | — |
| 705 Driveway Replacement FISH 020151 · Paving, walkways & site | Scattered Site 705-01 | $12,308 | 2026 |
| Selective Siding, Trim & Window Replacement (29 Moss Place) FISH 020152 · Windows & doors | Scattered Site 705-04 | $48,261 | — |
| EMG Drain Line Repair 667-2 Unit 1 FISH 020153 · Water, sewer & plumbing | Barnstable and Hyannis House 667-02 | $19,663 | — |
| Front Walkway Replacement 950 Falmouth Rd. FISH 020155 · Paving, walkways & site | Scattered Site 705-01 | $12,439 | 2026 |
| Flooring Replacement 78 Pleasent St. FISH 020156 · Interiors, flooring & painting | Larry Doughty House **Hist 689-04 | $50,375 | — |
| Vacant Unit Turnover 667-1 Unit C14 FISH 020157 · Unit turnovers & renovations | Adams Court 667-01 | $68,481 | 2026 |
| Sust: Install Bathroom Exhaust Fans 667-1 FISH 020158 · Heating, boilers & HVAC | Adams Court 667-01 | $366,932 | 2026–2027 |
| Roofing Replacement FISH 020159 · Roofing & gutters | Arthur Scott Williams House 689-03 | $132,026 | 2026 |
| Accessible Bathroom Remodel 78 Pleasent St. FISH 020160 · Kitchens & baths | Larry Doughty House **Hist 689-04 | $87,823 | 2026 |
| Main Exterior Door Replacement 78 Pleasent St. FISH 020161 · Windows & doors | Larry Doughty House **Hist 689-04 | $18,000 | 2026 |
| Exterior Unit Storm Screen and Non Unit Entrance Door Replacement FISH 020162 · Windows & doors | Scattered Site 705-01 | $105,990 | 2026–2027 |
| Bulkhead/Foundation Wall Repairs 57 Woodland Ave FISH 020163 · Siding, masonry & exterior | Scattered Site 705-02 | $11,410 | 2026 |
| EMG Boiler Replacement 20 Louis St. FISH 020164 · Heating, boilers & HVAC | Scattered Site 705-01 | $16,629 | 2026 |
| Vacant Unit Rehab 436 Bishops Terrace FISH 020166 · Unit turnovers & renovations | Scattered Site 705-04 | $113,509 | 2026–2027 |
| Upgrade Wood Deck Walkways to Concrete 667-1 FISH — · Paving, walkways & site | Adams Court 667-01 | $272,824 | 2026–2027 |
| Cast Iron Drain Line Replacement 667-1 BLDG 2 FISH — · Water, sewer & plumbing | Adams Court 667-01 | $266,503 | 2028–2029 |
| Intercom/Door Access System Upgrade 667-1 FISH — · Windows & doors | Adams Court 667-01 | $242,000 | 2029 |
| Sewage Pump Station Upgrades 667-1 FISH — · Other | Adams Court 667-01 | $478,101 | 2027–2028 |
| Unit Kitchen/Bathroom Upgrades Dot Bearse House FISH — · Kitchens & baths | Dot Bearse House **Hist 689-01 | $111,865 | 2026–2027 |
| Kitchen Cabinets and Countertop Replacement FISH — · Kitchens & baths | Newtown Rd & Race Lane 689-02 | $91,330 | 2026–2027 |
| Install emergency generator FISH — · Electrical & generators | Newtown Rd & Race Lane 689-02 | $128,563 | 2026 |
| Tanbark Rd. Siding, Trim, Windows & Door Replacement FISH — · Windows & doors | Scattered Site 705-04 | $242,842 | 2027 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.