Plainbids · All housing authorities · Updated Sep 27, 2026
Open bids and capital projects
Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.
None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.
This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.
| Project | Development | Total cost | Spending planned |
|---|---|---|---|
| 2008 FF Master CFA FISH 017014 · Other | Pakachoag Village 667-01 | $1,500 | — |
| ARPA FF: Window Replacement Buildings 5 & 6 FISH 017063 · Windows & doors | Pheasant Court 705-01 | $76,197 | 2026 |
| FF: Flooring at Turnover FISH 017070 · Interiors, flooring & painting | Pheasant Court 705-01 | $7,066 | — |
| Asphalt Repairs and Replacement FISH 017074 · Paving, walkways & site | Auburn Heights 167-01 | $73,898 | 2026 |
| Roof Replacement FISH 017079 · Roofing & gutters | Pakachoag Village 667-01 | $407,296 | — |
| Install vinyl siding FISH 017080 · Siding, masonry & exterior | Pheasant Court 705-01 | $9,603 | 2026 |
| ARPA Targeted: SUST 2021- Weatherization and Ventilation FISH 017081 · Heating, boilers & HVAC | 667-1.705-1,167-1 | $1,737,661 | 2026–2027 |
| Flooring at Turnover FISH 017083 · Interiors, flooring & painting | Pakachoag Village 667-01 | $10,963 | 2026 |
| ARPA FF: Replace Patio Lights at Rear of Units FISH 017086 · Electrical & generators | Pheasant Court 705-01 | $9,834 | 2026 |
| Tub Upgrades FISH 017104 · Kitchens & baths | Pakachoag Village 667-01 | $12,500 | 2026 |
| Vacant Unit Turn-over (3 Units; 2024-1) FISH 017106 · Unit turnovers & renovations | Pakachoag Village 667-01 | $12,461 | 2026 |
| Update Bathroom and Kitchen @ Turnover FISH 017107 · Kitchens & baths | Pakachoag Village 667-01 | $11,949 | 2026 |
| TEST/ABATE Asbestos (@ PV) FISH 017108 · Other | Pakachoag Village 667-01 | $11,181 | 2026 |
| Replace Doors to Trash, Shed, Mech Rooms FISH 017109 · Windows & doors | Pakachoag Village 667-01 | $9,950 | 2026–2027 |
| Vacant Unit Turn-over (2024-1). FISH 017110 · Unit turnovers & renovations | Pheasant Court 705-01 | $11,336 | 2026 |
| Update Kitchen @ Turnover FISH 017111 · Kitchens & baths | Pheasant Court 705-01 | $12,325 | 2026 |
| Replace Rear Storage Doors (PHASE 1) FISH 017113 · Windows & doors | Pheasant Court 705-01 | $0 | — |
| Trim Trees (@ Units, Youth Bldg, Parking) FISH 017114 · Paving, walkways & site | Pheasant Court 705-01 | $9,975 | 2026–2027 |
| Update Bathroom and Kitchen @ Turnover FISH — · Kitchens & baths | Pakachoag Village 667-01 | $11,949 | 2030 |
| 667-1 Insulate Mansard Roofs FISH — · Roofing & gutters | Pakachoag Village 667-01 | $87,725 | 2027 |
| 667 Trim Replacement FISH — · Siding, masonry & exterior | Pakachoag Village 667-01 | $86,213 | 2028 |
| 667 Gate Valve Replacement FISH — · Other | Pakachoag Village 667-01 | $50,753 | 2027 |
| Lock Replacement FISH — · Security & access | Pakachoag Village 667-01 | $22,688 | 2027 |
| 667 Brick Repairs FISH — · Siding, masonry & exterior | Pakachoag Village 667-01 | $60,500 | 2028 |
| Replace Hallway Floors (BLDG 1, FRONT OR REAR STAIRS) FISH — · Siding, masonry & exterior | Pakachoag Village 667-01 | $33,570 | 2029 |
| Replace Hallway Floors (Bldg 2, FRONT OR REAR STAIRS) FISH — · Siding, masonry & exterior | Pakachoag Village 667-01 | $33,570 | 2030 |
| Replace Hallway Floors (Bldg 3, FRONT OR REAR STAIRS) FISH — · Siding, masonry & exterior | Pakachoag Village 667-01 | $33,570 | 2030 |
| Replace Hallway Floors (BLDG 4, FRONT OR REAR STAIRS) FISH — · Siding, masonry & exterior | Pakachoag Village 667-01 | $33,570 | 2029–2030 |
| Replace Hallway Floors (BLDG 5 Front Stairs ONLY) FISH — · Siding, masonry & exterior | Pakachoag Village 667-01 | $33,570 | 2029 |
Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.
Get every housing authority bid, every Monday. Free.