Active projects (13)

The plan's list of projects already under way: some in design or out to bid, some under construction or wrapping up. When one goes out to bid, the COMMBUYS title is sometimes just its FISH number.

ProjectDevelopmentTotal project cost
Replace exterior doors and storm doors
FISH —
Hillcrest Oaks$367,374
Roadways & Parking Asphalt, Brookside 667-4
FISH —
Brookside$803,459
Roofing and Siding Phase 3 at 667-4
FISH 016188
Brookside$508,200
Stairwell Repairs and Painting 200-1
FISH —
Hillcrest Oaks$59,791
Asphalt Replacement Oakhurst 667-1
FISH —
Oakhurst$190,737
FA Renovations @ 12 Holman, 705-1
FISH 016187
Scattered Site$40,000
AIP: 667 Routine Turnovers
FISH 016183
$0
Flooring Replacement
FISH 016168
91 George Street$9,855
Retaining Wall & walkway Selective repairs 200-1
FISH 016171
Hillcrest Oaks$268,618
ARPA Targeted Award: FA System Upgrade 667-3 & 689-1
FISH 016173
Maple Terrace$544,051
Brookside siding & roof rplmt 667-4 Ph 2
FISH 016177
Brookside$583,540
Intercom System 667-4 Upgrade
FISH 016179
Brookside$43,101
Roof Replacement 689-2
FISH 016186
91 George Street$57,749

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.