Open bids and the projects in this authority's capital plan, with costs. Bids come from COMMBUYS; projects come from the annual plan the authority files with the state.

Open bids

None on COMMBUYS as of Sep 27, 2026. Get the free weekly email to hear when one posts.

Projects in its capital plan (13, $2,431,045 total cost)

This authority's newest plan on the state portal uses the state's previous format. “Spending planned” lists the state fiscal years (July to June) with money scheduled for each project; fiscal 2026 and earlier have already ended. “—” means the plan shows no spending scheduled for it in those years.

ProjectDevelopmentTotal costSpending planned
ARPA Targeted Award: Athol Federal Pacific Electrical Panel Replacements
FISH 015104 · Electrical & generators
Lakeside Apts 667-02$968,8712026
Morton Meadows Flooring #3
FISH 015109 · Interiors, flooring & painting
Morton Meadows 667-01$4,5002026
GD Window Replacement Phase 1
FISH 015111 · Windows & doors
Lakeside Apts 667-02$57,8752026–2027
FF: Underground Oil Tank Removals (8)
FISH 015112 · Other
Ferron Circle 705-02$226,8752026–2027
Septic Tank Replacement 705-1
FISH 015113 · Water, sewer & plumbing
Ferron Circle 705-02$250,4872026–2027
Bathtub Replacement 705-2/705-3
FISH 015114 · Other
Partridge Court 705-03$11,7652026
Installation of new Waste Line Cleanouts
FISH 015114 · Other
Lakeside Apts 667-02$30,5952026
Units 14 & 18 Renovations
FISH 015115 · Unit turnovers & renovations
Morton Meadows 667-01$112,9052026
Building Purchase - Office Renovation
FISH 015116 · Unit turnovers & renovations
Morton Meadows 667-01$397,2152027
Renovation of office to tenant units
FISH 015119 · Unit turnovers & renovations
Morton Meadows 667-01$216,805—
GD Window Replacement Ph 2
FISH — · Windows & doors
Lakeside Apts 667-02$116,0452026
Bathroom Fan Replacement 705-1/705-2/705 -3
FISH — · Heating, boilers & HVAC
Park/Kennebunk Street 705-01$27,2262026
705 Bathtub Replacement
FISH — · Other
Ferron Circle 705-02$9,8812026

Costs are total project costs (design and construction) as listed in the plan, read automatically from the PDF. The plans schedule work by the state's fiscal year (July to June), which can differ from an authority's own. Proposed projects are not funded until the state approves them, and plans change: costs rise, projects slip or get split into phases. Check the plan itself before relying on a number.